英语人>网络例句>泵站 相关的搜索结果
网络例句

泵站

与 泵站 相关的网络例句 [注:此内容来源于网络,仅供参考]

Water pump station is mainly applied in the mist spray and aspirating of coal cutter.

喷雾泵站主要应用于采煤机的喷雾除尘,是采煤工作面喷雾系统的主要组成部分。

Water pump station is mainly used in the mist spray and aspirating of coal cutter.It is a main part of the aspirating system of the coal face.

喷雾泵站主要应用于采煤机的喷雾除尘,是采煤工作面喷雾系统的主要组成部分。

To cope with the stink from Shanghai Liangcheng Pumping Station, the basis and general description of the design of the gas collection system, deodorizing device and.

本文针对上海凉城泵站的实际恶臭情况,介绍了恶臭气体收集系统、恶臭预处理设备、恶臭生物处理设备的设计依据、设计概况和实际运行情况。

So the research on how to make pumping stations run more efficiently has magnificent significance.

研究泵站如何发挥最大的效益高效的运行是很有意义的。

It is a common way that the special structure is predigested into plane problems, but the results are cursory.

在实际工程中,泵站结构通常的分析方法是将空间结构简化为平面问题进行分析,但是这种简化得到的结果比较粗略。

That night, the besiegers dug their second forward assault line parallel. At dawn on 4 November, a Japanese infantry company reinforced by an engineering platoon attacked the water pumping station.

是夜,工兵向前挖掘了第二条与突击战线平行的壕沟。11月4 日拂晓,一个由工程排加强的日本步兵连攻击了给水泵站

First according to the hydraulic pressure elevator system diagram, use the machine design and hydraulic transmission knowledge calculates the diameter of the plunger, cylinder tube wall thickness as well as cylinder bottom thickness; second, through the examination confirmation to the obtained result to complete the work of cylinder design; Simultaneously has carried on the component choice and the computation; Through to the system calorific capacity computation the and the volume of cooling water while the fuel tank cools when needs to complete the hydraulic pressure elevator fuel tank design; Based on the system oil stream condition to calculated the tube internal pressure lose, the local pressure loss as well as the all of the pressure lose to carried on the system checking calculation; Finally through the consult correlation design handbook to calculation and examines the belt, the band pulley, the axis, as well as the key, has completed the hydraulic pressure elevator pumping station transmission system design.

首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。

Firstaccording to the hydraulic pressure elevator system diagram, usethe machine design and hydraulic transmission knowledge calculatesthe diameter of the plunger, cylinder tube wall thickness as wellas cylinder bottom thickness; second, through the examinationconfirmation to the obtained result to complete the work ofcylinder design; Simultaneously has carried on the component choiceand the computation; Through to the system calorific capacitycomputation the and the volume of cooling water while the fuel tankcools when needs to complete the hydraulic pressure elevator fueltank design; Based on the system oil stream condition to calculatedthe tube internal pressure lose, the local pressure loss as well asthe all ofthe pressure lose to carried on the system checking calculation;Finally through the consult correlation design handbook tocalculation and examines the belt, the band pulley, the axis, aswell as the key, has completed the hydraulic pressure elevatorpumping station transmission system design.

首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。

First, the district Guoku Chu construction of a booster pump station, on the water pressure.

一是在区国库处建一加压泵站,对自来水加压。

Some technical problems of tunnel, booster pump station ,water hammer of the water diversion project are introduced briefly in this paper.

对引水工程中的隧洞、加压泵站、水锤设防诸技术问题作了简介

第11/16页 首页 < ... 7 8 9 10 11 12 13 14 15 ... > 尾页
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。