泵房
- 与 泵房 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The operation outline of the water supply and purification station in the Pulp Plant of 200T/d in Myanmar: water from river is pumped to the two clarifiers of φ25 in the purification station via intake pump house, and flows through the filtering pond and the clear-water reservoir where it is fed to all workshops through the clear water pump house.
缅甸200T/d浆厂给水净化站生产概况:河水经取水泵站将原水抽送到净化站的两座φ25圆形澄清器,经滤池、清水池,最后由清水泵房将水送至各车间斜板沉淀池设计,同时缅方工艺中增加一条生产水经加氯消毒处理后的生活用水管线,缅方的整个水处理工艺依然是采用化学、物理的方法来达到除去水中杂质的目的。
-
We hope you pay more attention to jobs are as follows haven't been finished this week:(1) right and left side of upper water wall has been aligned and fixed;(2) Nine downcomers been pre-stored;(3) All the wall packing aligned and fixed, then install right and left side rigid beam;(4) Finishing welding counterpart of front wall packing;(5) Get two booster pump for turbine driven boiler feed water pump aligned and make inspection;(6) Electric Feed Water Pump Unit, Coupling and Motor Pump positioned;(7) Equipment in Start-up Boiler House aligned and make inspection;(8) Get three Reusing Water Pump aligned;(9) Equipment in Integrated Water Pump House aligned and make inspection.
本周,以下工作未完成,希望贵单位引起重视:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)2台汽动前置泵找平找正,并验收;(6)电动给水泵组,耦合器和电泵就位;(7)启动锅炉房内设备找平找正,并验收;(8)3台复用水泵就位;(9)综合水泵房内设备找平找正,并验收。
-
Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.
下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。
-
Mainly for power system automation, power electronics, power equipment, online monitoring and condition-based maintenance, smart appliances, such as professional orientation, and products are mainly including the pumping station integrated automation system, data pass business platform, power management systems, substation automation system, power generation plant electric automation system, power system equipment, the main-line monitoring and condition-based maintenance systems, distribution network automation system, such as near 10 species, widely used in electricity, water, petrochemical, metallurgy, railway and other industries, the product has achieved a modular, standardized, seriation, the main technology in the domestic and international advanced level of similar products.
主要面向电力系统自动化、电力电子、电力设备在线监测和状态检修、智能电器等专业方向,产品主要包括泵房综合自动化系统、数据通业务平台、电量管理系统、变电站自动化系统、发电厂厂用电自动化系统、电力系统主设备在线监测和状态检修系统、配网自动化系统等近十个品种,广泛应用于电力、水利、石油化工、冶金、铁路等行业,产品已实现了模块化、标准化、系列化,主要技术处于国内、国际同类产品的先进水平。
-
Sewage treatment plant phase ii rush period sewage treatment plant phase ii rush period qiqihar in heilongjiang news april 19 hearing yesterday morning,reporters at the city's bureau of the construction of urban sewage treatment center phase ii construction site to see more than 470 construction workers are in full swing biochemical pool,drainage pumping station,sewage pump pond 13 projects such as single pile foundation construction,7 sets of large hammers,3 large excavators,a national taiwan university,20 sets of cranes and heavy goods vehicles are operating at full capacity 24 hours with classes rush period.
污水处理厂二期工程抢工期黑龙江新闻网齐齐哈尔重庆自来水19日讯昨天上午,记者在市建设局自来水的中心城区污水处理二期工程施工现场看到,470多名施工人员正紧锣密鼓地进行生化池、排水泵房、自来水泵池等13个工程单体的桩基础施工,7台大型打桩机、3台大型挖掘机、1台大吊车和20余台重型给排水暖通正开足马力24小时连班抢工期。
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。