英语人>网络例句>注量 相关的搜索结果
网络例句

注量

与 注量 相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper presents a new cementing research method pressure drawdown analysis method, which can be used to study the influence of deviation angle, flow rate, eccentricity and viscosity on displacement effictiveness in directional well and horizontal well.

压降分析法建立了相应的模拟试验装置,利用该方法可以研究井斜角、量、心度和粘度因素对注水泥顶替效果的影响,对定向井固井有指导意义。

The subcutaneous administration of sodium dimercaptosuccinate at a dose of 1500 mg/kg immediately after the intraperitoneal injection of trivalent antimonyl ammonium gluconate increased the LD_(50) of the latter from 90—112 mg/kg to 1300—1460 mg/kg.

皮下注射二巯基丁二酸钠1500毫克/千克,司将小鼠一次腹腔注射锑铵的半数致死量从90—112毫克/千克提高至1300—1460毫克/千克。静脉注身锑~(124)铵予家兔后,如立刻经同一途径注射二巯基丁二酸钠,亦可降低锑铵的急性毒性。

It also analyzed the influences on the grouting material performances by clay, fly ash, limes and the amount of added NaOH; then it worked out the optimal ratio of materials by the correctitude experiments.

分析了粘土、粉煤灰、石灰以及NaOH掺量对注浆材料性能的影响,并利用正交试验方法得出了材料的最优配比。

5 Kg. Note: using 3 pieces per layer as in 3X3 (7.5 cm X 7.5 cm) crosstie will double the capacity.

注:在 3X3(7.5 cm X 7.5 cm)枕木支架中每层使用 3 根可使承重量加倍。

Methods:the volume of injected liquid was usually about 50% volume of its dilator,the another 50% was inqected abat 5 days~7 days after operation.

在不同部位行皮肤软组织修复。首次注液量为扩张器容量的50%,余量于术后5天~7天行第二次注入。

0 Note: If it has special request about the displacement,it can show when ordering

注:如对位移量有特殊要求,可在订货时注明。

Curtain plate stainless steel plate, spray nozzle for the spray nozzle to capture, exhaust fan with explosion-proof fan.3, chamber body assembly plate connection between the use of bolts, installation, removal, fast and convenient.4, configuration, special explosion-proof spray room lighting, interior lighting sufficient light.5 mist treatment with water curtain, shower folding capture plus maze can efficiently remove the paint mist.6, circulation pump with an area of small, simple installation and pipeline pumps.7, Room δ1.5mm steel and steel body is made of.8, dust chamber body is made of EPS board, has entered out.9, water curtain spray booth technical parametersNo Item ParametersA flow rate (m3 / h) 90002 Power 43 pump power 34 open wind speed 0.6-0.75 Compressed air consumption (m3/min) 0.36 lamp illumination 400Z-7 nozzle8 Painting Room: Dimensions 2500 × 2400 × 26009 Dust Room: Dimensions 2500 × 1800 × 3400Note: Manual spray system uses 你好gh-quality brand-name products in Taiwan.6, leveling RoomLeveling effect of room to spray paint surface after the paint on the share level, and to a number of solvent evaporation in order to prevent baking too quickly appeared in the film pinhole.1, Room body is made of welded steel and steel plate.2, chamber body wall windows with transparent glass observation and maintenance of the door.3, chamber body with the top emission device, keeping indoor air fresh.4, room spray processing site in vivo, uniform color, elegant appearance.3, the consolidated statementa, baking oven is designed to bridge Road.

没有碰到水帘的漆雾由水帘下部进入喷漆室的后部,由喷嘴喷出的水雾冲洗、迷宫折板过滤及折板上的喷淋系统三次过滤后,废气经风机排至大气中,布局特点如次:一、设置双工位水帘喷漆室。二、槽体采用型钢及Q235钢板制作,板厚4mm。水帘板为不锈钢板,喷淋捕捉喷嘴为雾化喷嘴,抽风机采用防爆型风机。3、室体拼装板之间采用螺栓连接、安装、拆卸、迅速,便捷。四、配置喷漆室专用防爆照明,内部采光充足、明亮。5、漆雾处理采用水帘、喷淋捕捉加迷宫折板,可高效去除漆雾。6、轮回泵采用占地少、安装简略的管道泵。7、室体采用δ1.5mm钢板与型钢制作而成。八、防尘室体采用EPS板制成,设有出进门。9、水帘喷漆室技术参数序号项目参数1 处理风量(m3/h) 90002 功率 43 水泵功率 34 开口风速 0.6-0.75 压缩空气耗量(m3/min) 0.36 照明灯照度 4007 喷嘴 Z型8 喷漆室:外形尺寸 2500×2400×26009 防尘室:外形尺寸 2500×1800×3400注:手动喷漆系统采用台湾优质名牌产品。六、流平室流平室的作用是使喷漆后喷在工件表面上的漆铺平,并使溶剂挥发一些,以防止烘烤过快而在漆膜上浮现针孔。一、室体采用型钢与钢板焊制而成。

Analyzed on the tunnels that used EPB method in different soils, the more logical three-dimensional finite element model is based, which can reality represented the soil transfiguration. 3 Due to the engineering example, a 3D FEM simulation model was founded. The model was used to study the rules of soil deformation and surface settlement during shield tunneling. 4 The characteristics of loess include the module, conglutination force and inner friction angle of the loess, affected the soil deformation. 5 The influence factors to the surface settlements such as the depth of soil, the outer diameter of the shield tunnel, the released stress at the cutting face, the fill ratio of the shield tail void, pouring-slurry press, thrusts and lengths of shield and digging steps were studied using the FEM method. References is brought forward in the loess areas of Xi'an was proposed.

通过对不同土质条件下盾构法进行地铁隧道施工的有限元分析,全面反映盾构推进对土体变形的影响情况; 3根据有关勘测资料,建立合理的盾构法施工三维非线性有限元模型,对盾构法施工引起的地层变位和地表位移情况进行计算,分析了盾构施工引起的地层变形规律和地面沉降规律; 4研究了黄土特性(地基模量、粘聚力和内摩擦角)对盾构法施工中土体变形的影响; 5利用三维有限元对盾构施工过程中影响地面沉降的因素(覆土厚度、隧道外径、开挖面压力变化量、注浆压力、盾尾空隙填充率、开挖步长、盾构机的长度和推进力等)进行研究,为今后西安地区地铁的建设提供参考。

Methods 80 cases were divided into control group and test group with 40 cases respectively. Epidural catheter was left in test group, connected with "Tuoren" patient-controlled epidural analgetic pump with dicaine 100 mg+morphine 10~15 mg+droperidol 5 mg,which were dissolved into NS to 100 ml. LCP model was as follows:morphine 2~3 mg, background dosage: 2 ml/h, PCA 0.5 ml each time; The control group injected morphine 3 mg through epidural conduit each time to relieve spasm and pain according to the symptoms to observe and record the effects and side effects. Results Test group:39 cases were with remarkable effect, 1 cases was common.

将80例前列腺术后随机分为试验组与对照组各40例,试验组术毕保留硬膜外导管,接国产&驼人牌&一次性患者自控硬膜外镇痛泵,药液配方为丁卡因100 mg+吗啡10~15 mg+氟哌啶5 mg加入生理盐水至100 ml,LCP模式(负荷量:吗啡2~3 mg,背景量:2 ml/h,PCA 0.5 ml/次);对照组据疼痛症状经硬膜导管推注吗啡3 mg/次解痉止痛,观察并记录术后解痉镇痛效果及不良反应。

Patients in treatment group were treated with ultrasound-guided drainage, followed by intrapleural injection of 125, 000 IU urokinase (diluted by 50 ml normal saline), including 14 patients with pleural thickness〉 5 mm.

治疗组40例分为A,B两组,给予胸腔穿刺抽液引流并胸腔内注射尿激酶治疗,其中胸膜增厚〉5mm 14例为B组;对照组36例分为C,D两组,给予反复胸腔穿刺抽水治疗,其中胸膜增厚〉5mm 13例为D组;治疗组和对照组患者其他临床资料无差别,具有可比性;注药24h后抽液,B超定点测定首次注药前后的抽液量、胸膜厚度、纤维素分隔积分,差值结果作单因素卡方检验。

第5/8页 首页 < 1 2 3 4 5 6 7 8 > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力