英语人>网络例句>水轮 相关的搜索结果
网络例句

水轮

与 水轮 相关的网络例句 [注:此内容来源于网络,仅供参考]

In this paper, the finite element method was applied to the vibration characteristic analysis for the upper bracket and head cover of a certain large-scale hydropower generator unit.

采用有限元法对某大型水轮发电机组的上机架和顶盖结构进行了振动特性分析,得到了结构的自振频率和相应的振型,结果表明:顶盖产生共振的可能性较大,应加以预防。

American conservatives have seized on this reversal of fortune: Arthur Laffer, a Reaganite economist, hails the Texan model over the Gipper's now hopelessly leftish home.

美国保守派已抓住这一风水轮流转的财富机遇:供给学派经济学家阿瑟?拉伐曾在里根总统在位时大肆鼓吹德克萨斯模型。

It makes generating unit connecting with power grid difficult and causes phase modulation condition shifting to power generation operation and turbine in load rejection for stopping unit to produce non-stability operation area.

S特性使机组在难以正常并网并造成由调相工况转发电运行以及水轮机工况的甩负荷停机过程中产生不稳定运行区。

This paper describes the structure and physical-mechanical properties of them and introduces their application to the eletrical motor bearings jet looms, deep well pumps, water turbogenerators, divd electrical machineries and rubber spacer pumps.

本文对它们的结构和物理性能作了比较详细的描述,并介绍了它们应用在电机轴承、喷气织布机、深井泵、水轮发电机、潜水电机和橡胶隔膜泵等机电产品上所取得的良好效果。

At present multi-branched wave winding structure or lap winding structure are adopted in high capacity hydraulic generators, the authors analyze the features of all fault modality that may occur within the generators with these two kinds of stator windings in detail and design a versatile algorithm that can generate respective fault sets.

目前大型水轮发电机定子绕组普遍采用多分支双层波绕或叠绕的结构,文章针对这2种绕组结构,详细分析了发电机内部可能发生的所有故障形式特点,设计了可形成各自故障集的通用算法,并介绍了该算法在三峡左岸Alstom电机和柘溪电站扩建工程发电机定子故障形式分析中的应用。

The technical innovation for installation works of ALSTOM 700 MW hydro-generating units of TGP s Left-bank Power Station is described.

介绍了三峡左岸电站ALSTOM 700 MW水轮发电机组安装工作中的技术革新。

Li Yong'an, Three Gorges Project welcomed in three milestones in 2003, namely water filling of the reservoir, operation of the ship lock and power production of the generating unit; and further in September 2005, the 14 sets of hydro-turbine generating unit (700MW each) of the left-bank powerhouse were all connected on-line for power production; and in May 2006, approximate 10 months ahead of the preliminary design schedule and 2 years ahead of the expectation of the flood control performance, the Three Gorges Dam was completed and fully reached to its designed crest elevation of 185m, able to impound water with the whole structure of dam.

历任清江水电开发公司总经理兼湖北省人民政府副秘书长,中国三峡总公司副总经理。在李永安先生的领导下,长江三峡工程于2003年实现了蓄水、通航和发电三大目标,2005年9月左岸电站14台700MW水轮发电机组全部投产发电,2006年5月三峡主体工程大坝全线到达185米设计坝顶高程,具备全线挡水能力,工期比初步设计工期提前约10个月,提前两年发挥防洪能力。2006年10月,三峡水库蓄水至156米。

This paper introduces the main design differences between the pole s of Three Gorges Generator and the traditional one and as well the structures and the merits of the pole without press plate,chain wedge etc which are the new structures used in Three Gorges Generator by ALSTOM Power Ltd.

本文介绍三峡水轮发电机磁极与传统结构磁极的不同点,并重点介绍ALSTOM公司在三峡发电机中采用的无磁极压板结构的磁极、齿形磁极键等新结构的设计特点及其优点。

This article according to the actual application of Rapid-drop gate, meanwhile combine the entire characteristics test of pump model which was developed on the high accuracy pump model test platform of the south-to-north water transferring project water the model, mainly includes the water pump operating mode, the water pump applies the brake the operating mode and the hydraulic turbine operating mode, take a runner as the object, makes 3 to place the angle to 5 leaf blades the entire characteristics test.

本文根据快速闸门的实际运用情况,同时结合了高精度南水北调工程水泵模型同台测试试验台上开展的模型泵全特性试验,试验主要包括水泵工况、水泵制动工况和水轮机工况,以一个转轮为对象,做3至5个叶片安放角度的全特性试验。

From Western Jin to Tang(ca.7th century)at least 5 Buddhist classics mentioned different scales of earth wheel,water wheel and wind wheel,which shows that the theory had different schools in ancient India.

从西晋到唐代(约7世纪)至少有5部佛经提及地轮、水轮、风轮的各不相同的具体尺度,这说明这一理论在古代印度有不同的流派存在。

第10/12页 首页 < ... 4 5 6 7 8 9 10 11 12 > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。