水电工程
- 与 水电工程 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
My company undertakes fine decoration and installation of water and electricity facilities of the banqueting hall, the administration wine gallery, standard room and suite.
我司承担了其中的宴会厅,行政酒廊、标准间、套房的精装修及水电安装工程。
-
As a result, it is widely used in many fields such as mining industry, forest industry, dock, ferry, bridgework, water and power engineering.
因而,它被广泛应用于采矿工业、森林工业、码头、渡口以及桥梁、水电建筑工程的起重和施工作业中。
-
Geological prospecting pit for Exploration tunneling, and quarrying, electricity and water, railways, ports, bases, infrastructure, national defense projects to drill embrasure, cities can also be used to remove old buildings controlled blasting to achieve its efficiency is 5-10 times the pneumatic drill, energy consumption only of a pneumatic drill / 3, QL-Z hydraulic rock drill to replace the pneumatic drill is the ideal tool.
用于地质勘探坑探巷道掘进以及采石,水电,铁路,港口,基地,基建,国防工程中钻凿炮眼,还可用于城市拆除旧建筑物实现控制爆破,其工作效率是风钻的5-10倍,能耗却只有风钻的1/3,QL-Y液压凿岩机是替代风钻的理想工具。
-
The engineers abducted early on Saturday are Wang Ende and Wang Peng, who worked on Pakistan's Gomal Zam Dam project for China's state-run Sino Hydro Corp.
星期六早些时候被绑架的工程师是王恩德和王鹏,他们为中国国营水利水电公司在巴基斯坦的 Gomal Zam Dam 工程而工作。
-
We offer a wide variety of fire fighting equipment, air conditioner parts and engineering, satisfaction is guaranteed.
我们能供应各种型式的消防水电,空调设备以及装修工程,价格和品质保证让您满意。
-
Heavy machinerylarge water hydraulic press forge piece、upright grind、cement bric building materials equipment line,bus(heavy truck、light truck、large bus、medium-sizedbus and chassis、farm-oriented tractor special vehicle ,automobile components,the environmental protection equipments (air purification, smoke dust purification, desulfurization equipments) and other industries( prison, hydroelectric equipments, electric machine, lamps and lanterns, welding automatic system manufacture, casting technique, forging and pressing equipment, military enterprise,etc).
涉及到工程机械(挖掘机、压路机、起重机、路面机械、铲运机、推土机、叉车等企业)、基础件(橡塑密封、机械密封、石墨密封、液压附件、气动元件等企业)、重型机械(大型水压机锻件、立磨、墙地砖建材装备线)、汽车(重型、轻型货车、大客车、中型客车及底盘、农用车、专用车、汽车配件企业)、环保设备(空气净化、烟尘净化、脱硫设备企业)及其他(监狱、水电设备、电机、灯具、焊接自动化系统制造、铸造、锻压、军工等)行业。
-
With the rapid development of hydroelectric project, the influence of hydroelectric station on environment has increasingly been people's focus.
随着水电事业的迅速发展,水电站工程对环境的影响也受到了越来越多的关注。
-
At last ,the piecewise linear interpolation function is applied to deal with complicated constraints conditions for solving the objective function .The simulation results on the three gorges cascaded hydropower system long term optimal dispatch under the flood and dry power price and comparison with other algorithms show that it is greatly efficient to solve engineering optimal problems with complicated constraints.
针对模型中复杂的约束条件,采用分段线性插值函数实现了对目标函数的求解,并通过对丰枯电价下三峡梯级水电系统长期优化调度问题的计算及与其它算法的对比,验证了该算法可运用在解决具有复杂约束条件的工程优化问题中。
-
To complete the 220 kV line design and below the total length of over 3,000 km (including re-ice line about 300 km), 220 kV substation and the total capacity of 1.2 million kVA which Wushan Chengguan 110 (35) kV substation project, Yue Fu Chi-Beach - Chengguan 110 kV lines and other projects designed by the application of the technology industry in Sichuan Hydropower 1998 Good Design Award. 1995 commitment to "small rural electrification in Sichuan Province typical design of the substation" assessment by experts. 2000 commitment to the "small rural power grids of the typical design of unmanned substation", the expert assessment by the province and issued.
完成的220kV及以下线路设计总长度3000多公里(其中重冰区线路约300公里),220kV及以下变电所总容量120万千伏安;其中巫山城关110(35)kV变电所工程、岳池富流滩—城关110kV线路等工程的技施设计获四川省水电行业1998年优秀设计奖。1995年承担&四川省农村电气化小型化变电站典型设计&专家评审通过。2000年承担的&农网小型化无人值班变电站典型设计&,专家评审通过并在全省发行。
-
The fore bay of Heihe Longhui Hydropower Station designed by the company, is the existing biggest tunnel fore bay in China, which is height of 21m, width of 16m; for the large-span dome of surge tank of Baishuijiang Shiji Hydropower Station, which is the first project equipped with rapid-drop gate in surge tank in Gansu Province, the company adopted pre-stressed anchor cable to complete the dome's excavation and supporting at the same time, thus reduced the completion period and investment; for the diversion tunnel of Fuchuan Hydropower Station, which is the biggest non-pressure diversion tunnel in Gansu Province, with span of 9m, height of 11m, the company adopted half-tunnel supporting structure, thus reduced the project investment.
黑河龙汇水电站前池是目前国内最大的洞内式前池,跨度16m、高度21m;白水江石鸡水电站调压井大跨度穹顶采用预应力锚索技术,分瓣开挖一次支护完成,节省了工期和造价,同时是省内第一座在调压井内设置快速闸门的工程;福川水电站引水隧洞是甘肃省内最大的无压引水隧洞,跨度9.0m,高度11m,采用半洞支护结构,在满足安全的前提下节省了工程投资。
- 推荐网络例句
-
For a big chunk of credit-card losses; the number of filings (and thus charge-off rates) would be rising again, whether
年美国个人破产法的一个改动使得破产登记急速下降,而后引起了信用卡大规模的亏损。
-
Eph. 4:23 And that you be renewed in the spirit of your mind
弗四23 而在你们心思的灵里得以更新
-
Lao Qiu is the Chairman of China Qiuyang Translation Group and the head master of the Confucius School. He has committed himself to the research and promotion of the classics of China.
老秋先生为中国秋阳翻译集团的董事长和孔子商学院的院长,致力于国学的研究和推广。