英语人>网络例句>水力的 相关的搜索结果
网络例句

水力的

与 水力的 相关的网络例句 [注:此内容来源于网络,仅供参考]

The results of numerical simulation can guide the production and practice of the activated

本文的工作对水力旋流器的设计和选用有一定的参考价值。

The integrated risk between hydraulic, hydrologic uncertainty and the construction scheduling uncertainty should be analyzed. The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable. Thus the Monte-Carlo method is used to simulate the integrated risk of construction diversion system considering hydraulic, hydrologic uncertainty and the construction scheduling uncertainty.

以风险分析为核心,将各种不确定性因素辐合起来研究施工导流系统的综合风险,提出施工进度计划风险分析模型和假定坝体施工进度确定条件下的施工导流风险分析模型,在此基础上,建立基于Monte-Carlo方法全面考虑水文水力不确定性以及施工进度不确定性的施工导流系统综合风险分析模型。

The results indicate that, with HRT of 8?h and temperature of 35℃, the COD removal rate is beyond 80%, the removal rate of TN about 8%, the ammonification rate of organic nitrat.

试验表明:厌氧附着膜膨胀床反应器处理乳品废水,在水力停留时间为8h、中温35℃条件下,COD去处率达到80%以上,对总氮的去除约为8%,出水有机氮的氨化率达70%以上,ρ/ρ由进水的0 5提高到0 8以上。

In Tennessee, hydroelectric power production within the Tennessee Valley Authority, the government agency that generates electricity for seven south-eastern states, has been halved because of low water supplies.

在田纳西州,为东南七州供应电力的政府机构田纳西流域署,由于水力供应减少的缘由,发电量已减少一半。

A federal government project, the Tennessee Valley Authority, uses hydroelectric power to generate a large part of the electricity used in several southeastern states

国营的田纳西流域管理局通过水力发电站生产大量的电力供给东南部各州。

Almost all of Alcan's Saguenay operations are based on its own captive hydro power.

几乎加铝在沙格奈河的所有冶炼厂都是由自己所有的水力发电厂供电。

Evans said yesterday Quebec has a "unique opportunity" to hold its ranking because of its hydro power and the technology base Alcan will develop in the Saguenay.

Evan表示,因其水力发电厂和加铝计划沙格奈河开发的科技研究基地,魁北克拥有&绝对的优势&维持其领先地位。

In this paper the shallow water equations in the Lagrangian coordinate s were derived and the numerical solutions were found out for shallow water problem with moving boundary by using a 2 order Godunov scheme.

移动边界问题是水力计算中难点之一,本文用拉格朗日坐标系来描述浅水方程,并用二阶Godunov算法求解有移动边界的浅水问题的数值解。

In this paper the shallow water equations in the Lagrangian coordinates were derived and the numerical solutions were found out for shallow water problem with moving boundary by using a 2 order Godunov scheme.

移动边界问题是水力计算中难点之一,本文用拉格朗日坐标系来描述浅水方程,并用二阶Godunov算法求解有移动边界的浅水问题的数值解。

The Hoover Dam, constructed on the Colorado River near Las Vegas, was one of the earliest hydroelectric power plants.

而建造在宜昌附近的长江三峡大坝则是当今世界上最大的水力发电站。

第49/76页 首页 < ... 45 46 47 48 49 50 51 52 53 ... > 尾页
推荐网络例句

The reasons of iron ions content overproof in grade Ⅱ desalting water system,such as variation water quality,contamination of regenerant , operation adjustment of pretreatment system and switching operation of bed were discussed.

对二级脱盐水系统中铁离子含量超标的原因,如来水水质发生波动、再生剂受到污染、预处理系统操作调整、床体运行切换等进行了论述。

You were hired to drum up new business, so go and do it.

公司雇你招徕新业务,你就做你的事好了。

Who is in possession of this?

这是谁的?