英语人>网络例句>气象的 相关的搜索结果
网络例句

气象的

与 气象的 相关的网络例句 [注:此内容来源于网络,仅供参考]

First chapter is the summary, mainly introduced the project basic survey; Second chapter for the dam site hydrology characteristic, introduced the Hubei -01 key project in the basin specially is nearby the dam site hydrometeorology survey; Third chapter for the key position and the storehouse district terrain geology condition, introduced explained the dam site specially is nearby the dam spool thread terrain geology condition; Fourth chapter for the key position building shaping and the hydrology computation, including determined key position the project rank, the building shaping, adjusts Hong to calculate, blows off the bottom hole cross section size drawing up with initially to draw up the key position scheme of arrangement; Fifth chapter draws up for the size with the dam body arrangement, including the shaping, the Liang section plane determination, the dam body dam base guards against infiltrates the draining water facility the arrangement and the dam body plane arrangement and the stress stable analysis computation; Sixth chapter for the flood discharge design, mainly is the top of dam detailing and the downriver disappears can design; Seventh chapter for blows off the building the design, mainly is to imports the building the detailing strobe arrangement and Kong Shen and the exportation disappears can the design; Eighth chapter pilots the system and the power plant workshop design for the power plant, mainly is directs the system and the power plant workshop design to the power plant; Ninth chapter is ground processing, including ground excavating, the cleaning up, solidifies the grouting, the curtain is in the milk and all that some processing measure.

第一章为综述,主要介绍了工程的基本概况;第二章为坝址水文特性,介绍了鄂-01枢纽工程所在流域特别是坝址附近的水文气象概况;第三章为枢纽及库区地形地质条件,介绍说明了坝址特别是坝轴线附近的地形地质条件;第四章为枢纽建筑物的选型及水文计算,包括确定枢纽的工程等级,建筑物选型,调洪演算,放空底孔断面尺寸的拟定和初步拟定枢纽布置方案;第五章为拱坝尺寸拟定和坝体布置,包括拱坝的选型、拱冠梁剖面的确定、坝体坝基防渗排水设施的布置及坝体的平面布置和应力稳定分析计算;第六章为泄洪的设计,主要是坝顶的细部设计和下游消能设计;第七章为放空建筑物的设计,主要是对进口建筑物的细部设计闸门布置及孔身和出口消能的设计;第八章为电站引水系统及电站厂房设计,主要是对电站引系统和电站厂房的设计;第九章为地基处理,包括地基的开挖,清理,固结灌浆,帷幕灌浆以及其他一些处理措施。

Sunday's coming i wanna drive my car to your apartment with present like a star forecaster said the weather may be rainy hard but i know the sun will shine for us oh lazy seagull fly me from the dark i dress my jeans and feed my monkey banana then i think my age how old,skyline how far or we need each other in california you show me your body before night comes down i touch your face and promise to stay ever young on this ivory beach we kissed so long it seems that the passion's never gone you sing me your melody and i feel so please i want you to want me to keep your dream together we'll run wild by a summer symphony this is what we enjoyed not a fantasy the tin-man's surfing i wanna try my luck to the top of tide rip like just have some drugs i know you have no blame for my proud moonish heart the golden beatnik park oh diamond seashore drag me from the yard incredible sunward i watch as you're in photograph for camera your smile's so sweet,palm trees' so lush would you believe my honey it's califonia

周日的未来我想我的赛车驾驶您的公寓,目前像明星气象预报说,天气可能是雨季硬盘但我知道太阳的光芒,我们将噢懒惰海鸥飞我从黑暗字母i穿着我的牛仔裤和饲料我国香蕉猴子然后我想我的年龄多大年纪,地平线多远或者,我们需要彼此在加利福尼亚州您能告诉我你的身体在晚上归结我触手你的脸,并承诺保持以往任何时候都年轻在此象牙海滩只要我们吻看来,热情从未经历你唱我的旋律,我觉得所以请我要你要我让您的梦想同时我们会横行的夏季交响曲这就是我们喜欢不是幻想锡人的冲浪我想我的运气顶端的潮流瑞普只想有一些药物我知道你有没有责怪我的骄傲moonish心金比特尼克公园哦钻石海滨拖我从码难以置信的sunward我看是你的照片你的微笑相机如此甜美,棕榈树,所以葱郁你会相信我的蜂蜜是加州

Results showed diural variations of leaf Pn displayed bipeaked curve model, indicating the depression of photosynthesis at noon. Leaf Pn rate in June was higher than in September; Compared to leaf Pn, Cs had a similar changing curve, Cs in June was higher than in September. While diural variations of intercellular CO2 concentration were opposite to that of leaf Pn and Cs, decreased before 1200,increased after 1200, decreased again at 1600,after 1600 increased again; diural variations of climatic factors displayed single peaked curve model, peakedvalue occurred at 1400,and their influences on physiological factors were indirected and integrated.

结果表明,光合速率的日变化具有双峰型,存在光合午休现象,6月的光合速率高于9月;沙棘的气孔导度较低,其日变化与光合速率有相似的变化趋势,6月的气孔导度大于9月;细胞间CO2浓度的日变化与光合速率和气孔导度的日变化相反,1200之前下降,之后上升,1600下降,然后上升;气象因子的日变化具有单峰型,峰值1400出现,对生理因子的影响是间接且综合的。

第78/78页 首页 < ... 70 71 72 73 74 75 76 77 78
推荐网络例句

This one mode pays close attention to network credence foundation of the businessman very much.

这一模式非常关注商人的网络信用基础。

Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.

扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。

There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.

双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。