英语人>网络例句>比较级 相关的搜索结果
网络例句

比较级

与 比较级 相关的网络例句 [注:此内容来源于网络,仅供参考]

Sources of error in pipelined ADC and accuracy requirements of pipeline stage have been discussed in this thesis.

基于CMOS图像传感器中芯片级模数转换器高速、低功耗的要求,本文剖析和比较了三种典型高速模数转换器功耗,以确定选取流水线模数转换器。

As the module number of the system increases,the state space of the whole system may exponentially ex- plods Compositional reachability analysis is an effective approach to alleviate the problem.

当系统中的模块比较多时,系统的整体模型有可能出现状态空间的指数级爆炸,组合可达性分析是缓解这一问题的一种有效方法。

The invention discloses an optical-fiber all-optical code converter, comprising a temperature control circuit as well as optical-fiber Mach-Zed interferometer, heat sink, semiconductor refrigerator, thermosensitive resistor and radiator, where the interferometer is composed of two cascaded 3dB couplers on the heat sink, the relation between length difference delta L of two arms of the interferometer and generated delay time difference delta T is that delta L=c.delta T/n, where c is light velocity in vacuum and n is refractive index of optical fiber; the thermosensitive resistor is used to detect temperature of interferometer, the temperature control circuit is used to compare feedback voltage of the thermosenstive resistor with a given voltage to regulate working current of the semiconductor refrigerator, and the semiconductor refrigerator refrigerates or heat two arms of the interferometer by the heat sink.

本发明公开了一种光纤型全光码型转换器,它包括温控电路和位于密封盒内的光纤型马赫-泽德干涉仪、导热热沉、半导体制冷器、热敏电阻以及散热片;干涉仪由位于导热热沉上的二个3dB耦合器级联而成,两臂的长度差ΔL与产生的延时差ΔT之间的关系为ΔL=c。ΔT/n,c为真空中光速,n为光纤折射率;热敏电阻用于对干涉仪的温度进行探测,温控电路用于比较热敏电阻反馈的探测电压和设定电压,对半导体制冷器的工作电流进行调节,半导体制冷器通过导热热沉对干涉仪两臂同时进行制冷或加热。

Light responses of R/G HCs and LHCs were intracellularly recorded in isolated superfused carp retina, and the response dynamics analyzed.

本文第三部分工作,分别比较了R/G HC对红光反应和对绿光反应、LHC对红光反应和R/G HC对红光反应来验证级联模型的正确性,结果显示R/G HC可能还接受来自红敏视锥的直接输入。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

However, todays' cars are a lot sophisticated and complicated than the time while I was in auto mechanic class. A little neglect and carelessness might trigger other electrical problems. The most common are , shorting the electrical circult, and turning on the "Check Engine" warning light.

不过,今天的车比较我在汽车技术级时的先进和复杂得多,一点疏忽和不慎,可能引发其他的电气问题,最常见的是,抛空电气电路,把&检查发动机&警示灯开著。

Digital simulation for the integrated imformation transmission network of a certain power company is performed, the QoS under three configuration schemes, i.e., without QoS configuraiton, with simple differnece service configuraiton and with MPLS network configuration, are compared. Comparison resutls show that the configuration scheme of MPLS network can implement the load balance among link circuits and possesses fault self-recovery mechanism, so the failure elements can be quickly detected and the switching over of data flow among label switched paths can be realized. The fault recovery time is within miliseconds, therefore the QoS of power system realtime information can be ensured effectively and the QoS of various non-realtime information can be considered as well.

对某电力公司信息综合传输网络进行了数字仿真,比较了无服务质量配置、单纯差分服务配置和MPLS网络配置3种方案下的服务质量,结果表明:MPLS网络配置方案能够实现链路间的负载均衡,具有自愈性故障恢复机制,可以快速检测到失效元件并在多条标签交换路径之间实现数据流量的切换,故障恢复时间在毫秒级,可以有效保证电力系统实时信息的服务质量,并可同时兼顾各种非实时信息的服务质量。

To extend the SIC technique to turbo-coded systems, an iterative IC with ordered SIC at front-end is proposed. To avoid unnecessary computation, the ordering information obtained from SIC front-end is utilized in a low-complexity stopping criterion with high efficiency. In addition to bit-wise interference cancellation, the SIC technique is also applied to code-block-wise interference cancellation. And, only the bits in incorrect blocks should be preceded to the next outer iteration. As a result, huge amount of computational complexity can be saved, and better performance is achieved.

最后,我们延伸序列式干扰消除的概念至有通道编码的系统,与涡轮码解码同时考虑,首先根据排序资讯,提出一提早停止(early-stopping)准则以减少涡轮码解码时不必要的运算,与其他提早停止准则比较,在几乎相同的检测能力下,此准则具有快速及低计算复杂度的特性,接著提出一包含前述准则之递回式干扰消除法,将序列式干扰消除运用在符码及跨级之码块干扰上,并且只有被检定为错误的编码区块讯号需要再进一级的递回检测,此法不仅在效能表现上更为优越,也节省了大量且不必要的计算量。

225 Full-class, the boat from wetlands to Sela Mo Island, off the boat right hand of the castle can be found in a layer of doctors (there are tasks a person more difficult to recommend looking for the same 225 people who need to upgrade your team), ceiling rose to 300 after first aid.

3,225满级后,从湿地坐船去塞拉莫岛,下船右手的城堡一层可以找到一个医师(有任务,一个人比较难,推荐找同样225需要升级的人组队),完成后急救上限升到300。

To reach a compatibility of survey and navigation services, the system uses one medium-high frequence wave for high accuracy and two medium-low frequencies waves for stability of day-and-night operation as well as for la...

与国内外同类型系统比较,JGD首先采用了以线性组件为核心的宽带限幅放大级,数字锁相,具有误差分析与判断能力的自动巷识别电路和宽带线性功率合成等新技术。

第17/19页 首页 < ... 11 12 13 14 15 16 17 18 19 > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力