英语人>网络例句>次主 相关的搜索结果
网络例句

次主

与 次主 相关的网络例句 [注:此内容来源于网络,仅供参考]

We want to increase braze welding qualified higher than 95% by improving product structure and production technology.

目前铝水箱钎焊一次合格率只有80%,主要是主片与水管之间的焊缝泄漏,通过产品结构和生产工艺的改进,希望改进后的一次钎焊合格率达到95%以上。

A basic theory for constructing cavity resonator with a kind of slowwave transmission lines is presented, the procedure of determining sizes of cavity for a designed resonant frequency is proposed.

分析了盘荷同轴型谐振腔的TM慢波模式,并给出TM主模特征值和谐振频率的计算方程,证明了单一的TM高次模不能作为慢波模式单独存在于这种谐振腔之中,必须由多个高次模共同组成一个谐振模式。

A typical 3-RPS parallel platform manipulator mechanism is firstly studied by means of the above theory. The principal screws of this mechanism under three different configurations are identified by means of the conic section and the quadric degenerating theory, respectively.

以上述理论为武器首先分析典型的3-RPS并联平台机构,分别应用二次曲线分解理论和二次曲面分解理论,识别了该机构在三种位形下的主螺旋。

It includes the effects of π electron hopping between the alternate radicals and associated carbons on the bond order wave along the polyacetylene chain,the formation of charge density wave,and the effects of next-nearest-neighbor hoppings and electronic interactions.

其中包括侧链基团与主链的共轭性对主链键序波的作用,电荷密度波的形成,次近邻跃迁和电子相互作用的影响等。

The accuracy of the hole point is very important to control the use of the main hole Des support wire, and with the tunnel boring and development, the main branch wire from time to time to check first.

洞口点的精度是非常重要的,洞中的控制采用主辅支导线,并且随着隧道的掘进而向前发展,主支导线要每隔一段时间校核一次。

BOC joined both of the international credit card associations of MasterCard and Visa in 1987 and subsequently issued its first internationally usable Great Wall MasterCard in 1988,bearing the acceptance marque of that organisation .

中国银行相继在1987年加入了国际信用卡联合的主卡和维萨信用卡,随后在1988年第一次发行了国际使用的长城主卡。接受了品牌组承兑的组织。

The efforts of different purification steps were checked by polyacrylamide gel electrophoresis in the presence of sodium dodecyl sulphate.

各步分离提纯的效果用SDS-PAGE证实。过Sephadex G-75后的提纯物显示一条主区带,紧靠主区带有一条几乎可以忽略不计的次区带。

From the burden increased aspect clarify set upthe necessity of station, then pass to drew up to set up generalizeof transformer substation and line direction to consider, and passto analysis of carry the data, safety, economic and dependableconsider and made sure the 110 kV, 35 kV, 10 kV and station useelectricity of lord connect line, then again through burdencalculation and power supply scope made sure main number, capacityand model number of the transformer set, also in the meantime makesure the station uses capacity and model number of transformer,end, according to biggest keep on work electric current and shortcircuit calculating of calculation result, to the high pressureRong break a machine, insulate a switch, female line, insulate sonand wear a wall set tube, electric voltage with each other feelingmachine, electric current with each other the feeling machinecarried on choose a type, thus completed a 110 kV electricity apart of design.

本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。

And if you look at the Gospel of John chapter 21, then by the sea of Tiberias, we found that Simon and his friends were out fishing again.

当耶稣被抓的那一夜,我们看到西门三次不认主、其他的门徒也逃走了,害怕逃走了,不认主了。

Nonlinear partial differential dynamic equations of bending vibration of a tilting stepped drive shaft with two supports were built under non-inertia movement coordinate system by theorem of the motion of mass center and Heaviside function. According to the condition of equal displacement in an adjoining plane of the shaft, an equivalent shaft and its equation were obtained. A motion equation of the equivalent shaft was obtained by method of Galerkin. An approximate steady-state solution of the main resonance was obtained by method of multiple scales. The influence factors, motion stability, amplitude jump of main resonance of a stepped drive shaft and so on were analyzed.

用质心运动定理、Heaviside函数建立了非惯性系下倾料两端支承阶梯传动轴的非线性弯曲振动偏微分动力学方程,并根据相邻轴段的衔接面处位移相等的条件,得到阶梯轴的当量轴及其动力学方程;用Galerkin法得到当量轴的弯曲运动方程,用多尺度法求得稳态下当量轴的主共振的一次近似定常解,分析了影响阶梯传动轴主共振的因素、运动稳定性、振幅突变性等。

第7/37页 首页 < ... 3 4 5 6 7 8 9 10 11 ... > 尾页
推荐网络例句

Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.

最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。

Only person height weeds and the fierce looks stone idles were there.

只有半人深的荒草和龇牙咧嘴的神像。

This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.

这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。