次主
- 与 次主 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Mo produced batik row down the main tool of three-inch bamboo handle a folder wax knife and wearing a copper produced by fir wood dyeing, fabric weaving their own soil is mainly pepper cloth (now have a wider choice of fabrics), Master of indigo dye (mostly planted by local farmers, and cook their own made), Placed in the dye vat, for the use of multiple disseminated.
排倒莫制作蜡染的主要工具是三寸竹柄一头夹扎着铜片的蜡刀和以杉木制作的木染缸,布料主要是自己纺织的土花椒布(现在有的选用布料较广泛),染料主为蓝靛(大都是当地农民自己栽种和泡制而成的),置于染缸中,供多次浸染使用。
-
Moderate noise (75、85dBA), didn't has significant effect on simple control and reaction task such as two-hand coordinate tracking, complex reaction time and persuit aiming. After sustained exposure of 1. 5h to noise with intensity of 85、95 dB , there was a tendency to decrease in light tracking performance of dual task (light tracking and oddball vedio-moter reaction) with a very large difference among subjects. The attention distribution between main task and second task changed.
中等强度的噪声(75、85dBA),对于双手协调光标追踪、复杂反应时及目标跟踪等较为简单的操纵和反应并无显著影响;85、95dB强度的噪声持续暴露1.5h,可使双重任务(光标追踪和oddball视觉-运动反应)的光标追踪绩效有降低的趋势,并有很大的个体差异,主、次任务之间的注意分配发生了改变。
-
The results show that the ranges of secondary stress distribution have differences corresponding to different wall rock conditions of mining tunnel; but the principal stress distribution transits from compressive stress centralized in mining tunnel sidewall to tensile stress centralized in mining tunnel vault and floor.
研究结果表明,围岩条件不同的采矿巷道其二次应力分布影响范围有所差异,但围岩主应力总体上表现为由巷道边墙中下部位的压应力集中带逐步过渡到拱顶、底板一定范围内的拉应力集中带。
-
With different districts that use the effect of the main tower and specific angles of light, the whole building expands dramatically in appearance, from a rather low key building in the distance to a spectacular body of light once approached.
针对不同的地区,使用的主塔,并提出具体角度的影响,整个建筑外观急剧扩大,从在一个相当低的距离主要建设提高到一个壮观的光一次身体接触。
-
In this study, six campaigns around Anping tide gauge, Tainan, were successfully performed and the collected GPS buoy data were processed with four types of precise ephemeris provided by IGS, including final product, rapid product, ultra-rapid product and ultra-rapid product with the use of PPP technique. Comparing the PPP results with DGPS, the differences reach 3~5 cm in the horizontal and 10 cm in the vertical with final product; 6~8 cm in the horizontal and 15 cm in the vertical with rapid product; 15~20 cm in the horizontal and 30~40 cm in the vertical with ultra-rapid product; 2~3 m in the horizontal and 3~4 m in the vertical with ultra-rapid product. In addition, the collected data were also processed by DGPS techniques using different reference stations to analyze the effect of various baselines. The results show that accuracy degrades when the baselines increase.
本研究在台南安平潮位站旁进行6次GPS浮标施测,首先利用与GPS浮标距离不同之GPS参考主站来进行差分定位,分析基线距离对GPS浮标定位成果的影响,由实验结果可得出基线越长则定位准确度越低;再以IGS提供之最终产品、快速产品、超快速产品(Ultra-Rapid product)之观测部分observed half、超快速产品(Ultra-Rapid product)之预估部分四种不同发布延迟时间的精密星历与精密时表改正资料对GPS浮标进行精密单点定位解算,与传统差分相对定位方法定位结果进行比较后,得出使用最终产品之平面方向均方根误差(Root Mean Square Error, RMSE)可达3~5公分,而高程方向均方根误差可达10公分;快速产品之平面方向均方根误差可达6~8公分,而高程方向均方根误差可达15公分;超快速产品观测部分之平面方向均方根误差可达15~20公分,而高程方向均方根误差可达30~40公分;超快速产品预估部分之平面方向均方根误差可达2~3公尺,而高程方向均方根误差可达3~4公尺。
-
Owning to the interaction of the slab on the side of the transfer beam, the secondary internal force of frame-supported beam is more less than the predominant one.
由于转换梁两侧的楼板对转换梁的约束作用,框支梁次方向的内力远小于主方向的内力。
-
Or high pressure gas main or service pipe, but does not include such an installation
由次高压或高压供气主喉或供气分喉供应气体的调控压装置,但包括容
-
Service pipe, but does not inclu de such an installation th e volumetric capacity of which is less than 30 standard
由次高压或高压供气主喉或供气分喉供应气体的调控压装置,但包括容积低於每小时30标准方
-
Tangshan 10 years for the metallurgical and mining machinery manufacturer, Tang steel production specifications sintering machine products supporting parts, there are all kinds of sintering machine's main drive transmission, flexible, transmission parts, the torque coupling, security coupling , Security devices, roller fabrics, elastic pull bar, flexible poles, torque-device, the second envelope worm gear box and vice, Touwei seal and various cold rolling mill equipment and accessories saw, roller Production of special equipment.
十多年来为唐山冶金矿山机械厂、唐钢生产各种规格烧结机产品配套部件,主要有各种烧结机的主驱动传动、柔性传动装置部件、定扭矩联轴器、安全联轴器、安全保护装置、辊式布料器、弹性拉压杆、弹性支杆、扭力杆装置、二次包络蜗轮副及箱体、头尾密封装置和各种轧机设备配件及冷锯、托辊生产专用设备。
-
By applying the sinusoidal wave mode to simulate the rugged surface of bridge deck,accounting for vehicle-bridge interaction and using Euler-Bernoulli beam theory, a coupling vibration model of vehicle-bridge system was developed. The model was solved by mode analyzing method and Runge-Kutta method, and the dynamic response and the resonance curve of the bridge were obtained. It is found that there are two resonance regions, one represents the main resonance while the other the minor resonance, in the reson...
通过用正弦波形模拟桥面的不平和考虑移动车辆-桥梁间的相互作用,在Euler_Bernoulli梁理论的基础上建立了一种车桥系统的耦合振动模型·利用模态分析法和Runge_Kutta法对模型进行数值求解,获得了车桥系统耦合振动的动态响应和共振曲线·发现车桥耦合振动的共振曲线中存在两个共振区域,一个反映主共振而另一个反映次共振·讨论了桥面不平、桥梁振型和车辆间的相互作用对系统振动的影响·数值结果表明,这些参数对系统振动的影响很大,桥面不平和振型对车桥系统耦合振动的影响不能忽略,设计车速应该远离临界车速
- 推荐网络例句
-
James, son of Zebedee, and John the brother of James, whom he named Boanerges, that is, sons of thunder
载伯德的儿子雅各伯和雅各伯的弟弟若望,并为他们起名叫"波纳尔革",就是"雷霆之子"
-
The southern Hungarian university city of Szeged will host part of the project, amounting to 40 percent of the total investment, which will mostly be paid for through Hungary's EU structural funds.
位于塞格德南部的匈牙利大学将负责部分项目,总计占总投入资金的40%。大部分资金将由匈牙利的欧盟结构基金会支付。
-
If you want a parrot as a pet, make sure it has been hatched in Britain.
如果你想要一只鹦鹉作为宠物,要确保是在英国孵出的。