横梁
- 与 横梁 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The invention includes a bridge, a bridge traveling mechanism, a crane trolley, a telescopic boom and a telescopic traveling mechanism; wherein the bridge traveling mechanism drives the bridge to travel longitudinally along the track on elevated beams on the two sides; the crane trolley travels laterally along the track on the bridge; the telescopic boom is arranged between the crane trolley and the bridge, the crane trolley travels laterally along the track on the telescopic boom; and the telescopic traveling mechanism drives the telescopic boom to travel laterally along the track on the bridge.
本发明包括桥架、桥架运行机构、起重小车、伸缩臂和伸缩运行机构;其中,所述桥架运行机构驱动所述桥架沿两侧的高架横梁上的轨道纵向运行;所述起重小车沿所述桥架上的轨道横向运行;所述伸缩臂设置在所述起重小车和所述桥架之间,所述起重小车沿所述伸缩臂上的轨道横向运行;所述伸缩运行机构驱动所述伸缩臂沿所述桥架上的轨道横向运行。
-
One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.
其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。
-
One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.
其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。
-
Through structure improvement, the whole intensity of top beam is obviously improved and the whole weight is lightened.
通过结构改进,明显的提高了上横梁的整体强度,降低了重量。
-
The top beam can turn over 90 degrees, so it's convenience to operate.
上方横梁可旋转90度以上,使工作台面敞开,便于操作。
-
The structural core of the project is a raised flooring system with a series of columns and a ring beam on the top for stability.
项目的结构核心部分是一个抬高的顶棚系统,附带依次排列的圆柱以及置于其上用来增强稳定性的一根圆形横梁。
-
By given actual working conditions to numerical simulation, stress and strain distribution of nodes for every part of top beam, worktable and vertical pole and nut of press are obtained.
设定与实际工作状态相符合的约束条件,进行数值分析,得出压力机上横梁、工作台和立柱螺母等各个部位的节点应力、应变分布。
-
By appending a supportboard hole for vertical column in the middle part of top beam, the height of supportboard around hydraulic cylinder is decreased.
在上横梁中间结构的立柱孔周围添加了支撑板;减小了中心液压缸周围支撑板的高度。
-
The company is capable to design and manufacture all alone all kinds of containers and flow office con|ainers, and as request make structurally special enntainers and flow office containers, such products with large capacity and extra height and lcngth as steel containers, ventilators, open top containers, open side containers, eqnipment containers for special purpose, office maintenance containers, living containers, rush bin, toilet case, watch house-ease, containers for dining hall, 2 in 1 or 3 in l office compound meeting room, collapsible containers, and other containers and flow office containcrs of distinct sizes.
佛山市南海平洲友利集装箱有限公司能自行设计制造各类集装箱及流动办公室箱,也能按客户要求制造特殊构造的集装箱及办公箱,如大容积超高超长的钢质集装箱、通风箱、开顶箱,侧开门箱、设备专用箱、办公装修箱、住宿箱、垃圾箱、厕所箱、值班室箱、饭堂用箱、二合一或三合一组合办公会议室箱、装拆箱及其他不同尺寸的货箱及办公箱和集装箱专用部件、八字板、顶板、侧板、低横梁、角柱头等。
-
It is found that the stiffness of the beam is inadequate, which result in two gaps between the central beams of the moving beam; there are two weak strength sections where existing in the tie rod cylindrical hole and chamfering nearby the perforation cylinder.
通过分析发现横梁的刚度不足,致使中梁之间有两处开缝;强度较薄弱存在两处,分布在拉杆的圆柱孔边和穿孔缸附近的倒角处。
- 推荐网络例句
-
She gently rebuff ed him, but agreed that they could be friends
她婉言拒绝了,但同意作为朋友相处。
-
If in the penal farm, you were sure to be criticized.
要是在劳改农场,你等着挨绳子吧!
-
Several theories about reigniting and extinguishing of the arc have been refered.
本文综合考虑了几种电弧重燃和熄灭理论。