横
- 与 横 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
We also measure the distance and section of some muscles for example, psoas major muscle, quadratus lumborum, erector spinae olbique, internal abdominal oblique, rectus abdominis, transversus abdominis.
运用横截面积肌力计算法,测量尸体腰椎周围肌肉:腰大肌、腰方肌、竖脊肌、腹内外斜肌、腹横肌的解剖横断面积,及其与腰段脊柱纵轴的中心距数值,求得力矩值。
-
A direct yaw moment control controlling vehicle motion by a yaw moment which is actively generated by transversally distributed tire longitudinal forces is becoming one of the most promising means of chassis control for the improvement of vehicle active safety.
通过控制左右车轮上的驱动力和制动力,产生横摆力矩来控制汽车的横摆运动的直接横摆力矩控制技术,可以有效地提高汽车的操纵稳定性。
-
Where crosscuts are staggered, the second crosscut will be determined by two crosscuts on the same side, either left or right, in the entry being traveled.
如横巷相互交叉,应在两个横巷的同一侧(或左或右,相对于进来的入口)确定第二个进入横巷。
-
Analysis and countermeasures disease in cement concrete bridge surface layout;2. Because of the substandard control of height in bridge pile base construction,it leads to the unfitness in bridge surface slope and design.
在进行桥梁桩基施工时由于标高控制不准,导致桥面横坡与设计不符,为保证桥面的横坡与前后路基的一致性,确保行车的舒适安全,对桥梁桥面横坡的处理方案进行了分析探讨,并提出了切实可行的处理方案,可给今后类似桥梁问题的处理提供参考。
-
This paper analyzes on the present situation of the damage and the causes of the erosion of the coke oven cross brace,and discusses on the merits and demerits of the integral replacement and the cut-off replacement of the cross brace and the procedures of the replacement.
分析了焦炉横拉条损坏的现状及横拉条腐蚀的原因,论述了横拉条整体更换和截断法更换的优缺点及更换步骤。
-
The main products are: two-tier lift-sliding system, three-tier lift-sliding with pit,two-seven tier lift-sliding under ground system.
主要产品有:两层升降横移系列,带地坑三层升降横移系列,地面以上2-7层升降横移系列。
-
This paper mainly gives the method of using HMI and PLC to control horizontal cutter machine, through the research of the control system of horizontal cutter machine and combined with the practical background.
本文主要介绍了利用触摸屏和 PLC实现对横切机的伺服控制,通过对横切机控制系统的研究,联系系统实际的应用背景,制定了横切机控制系统的实现方案。
-
Electric potential waveshapes of tower body and crossarms were presented by EMTP, also voltage waveshape between upper or lower crossarms and any given phase conductors.
分析结果表明,在高杆塔情况下,降低冲击接地电阻对耐雷性能的改善效果不大;在中横担外侧加设辐合地线和上横担中部增设避雷线以及适当调整导线与上下横担之间空气间隙的距离可有效的改善输电线路的耐雷性能;在条件允许的情况下,建议降低杆塔高度。
-
B. Front boom of gantry is equipped with two horizontal traveling carriages, each carriage is hold slide/lifting lifting column, the traveling range between two carriages is 300 – 2500 mm.
门型架前侧装有两组横移滑动台车,每座台车有直立柱升降及滑动系统,两座横移滑动台车间距为500 – 2500 mm,横移台车由马达驱动沿著尺牌移动。
-
Besides the rest position of tongue, all swallowing ultrasonographic measurements were recovered immediately after removal of TPA. The rest position was recovered in 7 days after removal of 2mm TPA and recovered in 1 day after removal of 4mm TPA.
拆除横腭弧线后,吞咽运动之超音波测量数值会立即回复,但是舌头的休息位置则会在拆除2mm横腭弧线后之第7天会回复;以及拆除4mm横腭弧线后之第1天会回复。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。