英语人>网络例句>梁 相关的搜索结果
网络例句

与 梁 相关的网络例句 [注:此内容来源于网络,仅供参考]

On the safe side, we should use active soil pressure and passive soil pressure to calculate the support strength before T increased. That is RA=EA-EP Among them: RA ………… holding strength EA ………… composite force of active soil pressure EP ………… composite force of passive soil pressure Immediately, flexural torque distribution of enclosure wall can be counted. Mmax is the location of shear force zero. Equivalence beam method abridges. No matter which kind of supporting structure form, the key problem lies in the establishment depth of catch point, severity of support and enclosure wall, penetration depth and pit bottom quality of soil property.

单道锚杆支护结构计算分别采用静力平衡法及等值法,根据试算法插入深度t值需先进行假定墙的插入深度确定后来计算支撑力,为了安全起见,可按插入深度增大前的主动与被动土压力合力计算支撑力即 RA=EA-EP 式中:RA …………支撑力 EA …………主动土压力合力 EP …………被动土压力合力随之可求围护墙的弯矩分布,Mmax为剪力为零点的位置,等值法的计算略述。

Looking up at the ceiling, the crossbeams, brails and straight beams scattered and overlapped, form a beautiful pattern.

上望天花板,横、斜、直,错落重叠,形成美丽图案。大厅内,吊挂大幅阿里山代表性照片,应系出自名家之手,均十分感人。

Based on the practice of first simple beam and later continous prestressed concrete combination box in the constructions of Xiangcao river bridge and Tanglong bridge, and analyzing the quality problems in the constructions, this paper puts forward some suggestions and mensures concerning plate making, steel fixing, Concrete pouring, box beam installation and system concerting, etc.

主要针对312国道镇江段香草河大桥和汤龙公路大桥采用先简支后结构连续部分预应力砼组合箱的施工中,在底板制作、钢筋绑扎、混凝土浇筑、预应力张拉、箱安装、组合体系转换等方面所采取的质量控制措施,本文分析对比了两座桥施工中好的做法及出现的质量缺陷,提出一些防治、处理措施及建议。

Nowadays, this structure is widely used although its design theory can not keep up with its engineering application. With the development of the west regions,with the construction of more infrastructures e.g. railways、highways and water conservancies, this kind of retaining wall will be more popular. So this paper does a research on this retaining wall based at a practical site.

目前这种结构应用较为广泛,但是其设计理论相对滞后于工程应用,随着国家西部大开发战略的实施,更多的铁路、公路和水电等基础设施项目陆续投入建设,桩基托挡土墙支挡结构也将大量应用,所以本文结合实际工点对桩基托挡土墙结构进行了研究。

This paper is concerned with the vibration responses of an infinite, fluid-loaded, elastic foundation of Bernoulli-Euler beam under the convected forces.

本文即是探讨柏努力-欧拉受这移动外力作用下的振动分析;并考虑的流体承载与弹性基础的反弹力效应。

After being prefabricated, they will be carried to the point, and installed on the bridge. Seated very close to each bridge, prefabrication sheds are responsible for prefabricating girder boards and culvert cover boards. Dadoes are set up according to the number of girder boards. Two joist barrows and one 315KVA power transformer are fixed in prefabrication shed .

进行集中预制后用大型平板运输车运至各桥点进行安装,预制场设在各桥桥头附近,负责预制所有板及涵洞盖板,根据板数量设置台座,各预制场设龙门桁车2座,预制场安装315KVA 专用变压器一台。

Exiling himself to Japan,Liang Qi-chao researched and accepted Rousseau's thought of social contract,and then formed the idea that"the subject is the main body of the nation".

论文关键词卢梭/民约论/启超/国民国家思想 Rousseau/Social Contract/Liang Qi-chao/the thought on nation-state,论文来源学术研究,论文单位广州,点击次数 22,论文页数 108~113页2002年2002月论文网 http://www.lw23.com/paper_63619441/启超流亡日本后,通过研习和接受卢梭的民约论,确立了&国民主体&论。

The results show that the key rock-beam situated at the outside of the structure acts as a framework, shielding and interdicting the transference of stress. This is true not only in the vertical but also to a great extent in the horizontal direction as well.

结果表明:外层关键岩结构在巷道变形过程中起到骨架作用,屏蔽和阻断应力的传递,不但使得巷道跨度范围内垂向应力的传递发生阻断,上部岩层载荷不能向关键岩下位岩层传递,而且承担了开挖引起的应力重分布的大部分水平应力。

This paper analyzes overwinding and overfalling state of auxiliary shaft system,discusses design fundamental of choosing reasonable parameters,provides a theory mathod to anticolision-beam design,and analyzes,designes an example.

结合煤矿副立井设计的特点、要求,对提升系统的过卷及过放事故状态进行分析,论述并探讨井上及井底防撞的主要设计参数取值原则,为防撞的设计提供理论依据。

During skeleton steel erection, a tightly planked temporary floor will be maintained within two stories or 30 feet (9.144 meters), whichever is less, below and directly under that portion of each tier of beams on which any work is being performed.

在主框架安装期间,在每层有人工作的下方或紧贴着的下方,两层或 30 英尺(9.144 米)之内,选低者,则要保持有一个密铺的临时平台。

第62/100页 首页 < ... 58 59 60 61 62 63 64 65 66 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。