英语人>网络例句>梁 相关的搜索结果
网络例句

与 梁 相关的网络例句 [注:此内容来源于网络,仅供参考]

Results Early signs of ANFH using CT showed that, in 26 femoral heads in 21 cases, there were radiate star shape of high-density osteosclerosis of the trabeculae in 8 femoral head.

结果 CT早期表现:2 1例 2 6个股骨头,其中 8个股骨头骨小呈放射状密度增高的"星状征",骨小境界清楚、锐利属Ⅰ期;18个股骨头表现为骨硬化,骨小结构消失、模糊不清,骨密度减低及囊性改变,属Ⅱ期;并有 3个股头在Ⅱ期影像改变基础上出现软骨下骨折及轻微塌陷,属Ⅲ期。

Results Early signs of ANFH using CT showed that, in 38 femoral heads 31 cases, there were radiate star shape of highdensity osteosclerosis of the trabeculae in 13 femoral head.Twentyfive femoral heads showed osteosclerosis and trabeculae structure disappearing and vague,incoordinately lowostedensity area and cyst change.There were fracture under the cartilage and light subsid in 5 cases.

结果:早期ANFH的CT表现:31例38个股骨头,其中13个股骨头骨小呈放射状高密度的"星状征",骨小境界清楚、锐利,属Ⅰ期;25个股骨头表现为骨硬化,骨小结构消失、模糊不清,骨密度减低及囊性改变,属Ⅱ期;并有5个股骨头在Ⅱ期影像学改变基础上出现软骨下骨折及轻微塌陷,属Ⅲ期。

Results Early signs of ANFH using CT showed that, in 38 femoral heads 31 cases, there were radiate star shape of highdensity osteosclerosis of the trabeculae in 13 femoral head.Twentyfive femoral heads showed osteosclerosis and trabeculae structure disappearing and vague,incoordinately lowostedensity area and cyst change.There were fracture under the cartilage and light subsid in 5 cases.The cases in stage Ⅰwere given decompression, while the pationtsresul in stageⅡand stageⅢ were given decompression and ostetransplant.

结果:早期ANFH的CT表现:31例38个股骨头,其中13个股骨头骨小呈放射状高密度的"星状征",骨小境界清楚、锐利,属Ⅰ期;25个股骨头表现为骨硬化,骨小结构消失、模糊不清,骨密度减低及囊性改变,属Ⅱ期;并有5个股骨头在Ⅱ期影像学改变基础上出现软骨下骨折及轻微塌陷,属Ⅲ期。

objective to evaluate early signs of avascular necrosis of femoral head in adult by ct and to guide clinical treatment.methods the cases with suspicious diagnose of anfh were scaned in the both hip joints by x ray and ct to find the early signs of anfh with ct.results early signs of anfh using ct showed that, in 38 femoral heads 31 cases, there were radiate star shape of high density osteosclerosis of the trabeculae in 13 femoral head.twenty five femoral heads showed osteosclerosis and trabeculae structure disappearing and vague,incoordinately low ostedensity area and cyst change.there were fracture under the cartilage and light subsid in 5 cases.the cases in stage ⅰwere given decompression, while the pationtsresul in stageⅱand stageⅲ were given decompression and ostetransplant.conclusion ct results show that the sign of the high osteodensity and low osteodensity and cyst change can disply early anfh.

摘 要]目的:探讨成人股骨头缺血性坏死的早期ct征象并指导临床治疗。方法:对临床疑诊anfh的全部病例均行x线平片及ct检查,分析anfh的早期ct征象。结果:早期anfh的ct表现:31例38个股骨头,其中13个股骨头骨小呈放射状高密度的"星状征",骨小境界清楚、锐利,属ⅰ期;25个股骨头表现为骨硬化,骨小结构消失、模糊不清,骨密度减低及囊性改变,属ⅱ期;并有5个股骨头在ⅱ期影像学改变基础上出现软骨下骨折及轻微塌陷,属ⅲ期。治疗结果:ⅰ期行钻孔髓内减压术,ⅱ、ⅲ期行钻孔减压植骨术。

Results Early signs of ANFH using CT showed that, in 38 femoral heads 31 cases, there were radiate star shape of high density osteosclerosis of the trabeculae in 13 femoral head.Twenty five femoral heads showed osteosclerosis and trabeculae structure disappearing and vague,incoordinately low ostedensity area and cyst change.There were fracture under the cartilage and light subsid in 5 cases.The cases in stage Ⅰwere given decompression, while the pationtsresul in stageⅡand stageⅢ were given decompression and ostetransplant.

结果:早期ANFH的CT表现:31例38个股骨头,其中13个股骨头骨小呈放射状高密度的"星状征",骨小境界清楚、锐利,属Ⅰ期;25个股骨头表现为骨硬化,骨小结构消失、模糊不清,骨密度减低及囊性改变,属Ⅱ期;并有5个股骨头在Ⅱ期影像学改变基础上出现软骨下骨折及轻微塌陷,属Ⅲ期。

With the development of the prestressed concrete construction technology, more and more prestressed concrete box girder bridges have arisen in our nation. However, after construction, the appearance of the cracks on some of these bridges takes some unfavourable influence on the structures. In common sense, we should take some methods to strengthen and repair these bridges as soon as possible, but because of the civil pecuniary condition, we cant repair all the broken bridges in one time. Therefore a scientific estimation must be made about the load-carrying capacity of these prestressed concrete box girder bridges with cracks, so that we can decide which bridge should be repaired firstly.

随着预应力施工技术的不断进步,我国已拥有越来越多预应力混凝土箱形桥,这些桥在使用一段时间后,有很大一部分箱出现了大量的裂缝,这些裂缝的出现对桥结构将产生不利的影响,所以应尽可能的对其进行加固修补,但限于国内实际经济状况,我们不可能一次性全部进行加固改造,需要对在役的这些开裂后的预应力桥的工作状态特别是承载力做出科学的评判,以便区分轻重缓急,优先实施。

With the development of the prestressed concrete construction technology, more and more prestressed concrete box girder bridges have arisen in our nation. However, after construction, the appearance of the cracks on some of these bridges takes some unfavourable influence on the structures. In common sense, we should take some methods to strengthen and repair these bridges as soon as possible, but because of the civil pecuniary condition, we can't repair all the broken bridges in one time. Therefore a scientific estimation must be made about the load-carrying capacity of these prestressed concrete box girder bridges with cracks, so that we can decide which bridge should be repaired firstly.

随着预应力施工技术的不断进步,我国已拥有越来越多预应力混凝土箱形桥,这些桥在使用一段时间后,有很大一部分箱出现了大量的裂缝,这些裂缝的出现对桥结构将产生不利的影响,所以应尽可能的对其进行加固修补,但限于国内实际经济状况,我们不可能一次性全部进行加固改造,需要对在役的这些开裂后的预应力桥的工作状态特别是承载力做出科学的评判,以便区分轻重缓急,优先实施。

Then the MEMS solenoid type electromagnetic actuating and novel, frictionless and wear-free, and simple structure are designed for fiber-deflecting type MEMS VOA: One of the two coupled single mode fibers is completely fastened in one of the three aligned U-shaped grooves while the deflectable fiber is partially fixed in another groove with a long front section suspending over the wider groove as a cantilever beam. The two fibers, any one for input and the other for output, are well aligned initially so that the insertion loss is very low. Beside the deflectable fiber is a solenoid microactuator with a U-shaped permalloy core attracting a permalloy piece glued on side of the fiber cantilever so that the fiber is deflected and the optical power coupled between the fibers decreased continuously. Using MEMS solenoid as a continuous actuator and the novel structure of VOA are not seen in literature.

为光纤偏移型MEMS可变光衰减器设计了MEMS螺线管电磁驱动方式以及新颖的避免了静摩擦、磨损而且简单的整体结构形式:在硅基片的三段V形槽结构中,将两个对接单模光纤之一完全固定在基片上,只将另一根光纤的稍后部位固定于基片上而使其前端的一定长度悬空,形成一个悬臂结构;初始对准后两根光纤之间的光传输损耗很小;通过U型铁芯MEMS螺线管吸引固定于光纤悬臂上的坡莫合金片,驱动光纤悬臂连续偏移以使两根光纤之间功率传输系数连续变化,从而达到光功率连续衰减的目的。

On the basis of local loaded experiment of external prestressing on laminated beams of concrete and theoretical analysis,we put forward the calculated formula for deformation and maximum crack width,considering the force bearing property of two stages of the laminated elements of concrete and the recent research results for beams of partly prest...

在体外预应力混凝土叠合现场加载实验和理论分析基础上,结合无黏结预应力混凝土已有的研究成果,同时考虑混凝土叠合构件的二阶段受力特性,给出了体外预应力混凝土叠合变形及最大裂缝宽度计算方法。通过与现场实验结果对比,表明该公式计算精度较高,可用于指导同类工程的加固设计。

May 3. I began with my Saw, and cut a Piece of a Beam thro', which I thought held some of the upper Part or Quarter-Deck together, and when I had cut it thro', I clear'd away the Sand as well as I could from the Side which lay highest; but the Tide coming' in, I was oblig'd to give over for that Time.

五月三日我动手用锯子锯断了一根船。我猜想,这根船是支撑上面的甲板或后面的甲板的。船锯断后,我尽力清除旁边积得很高的泥沙。但不久潮水开始上涨,我不得不暂时放弃这一工作。

第17/100页 首页 < ... 13 14 15 16 17 18 19 20 21 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?