桥的
- 与 桥的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Beijing Olympic Torch in Sanya, the chief of 30.09 km transmission line will be shown in Sanya in the development of new take-off of Landmark, known as Sanya Olympic Ark of the Phoenix home port on the island of "Fire Phoenix Plaza" at the starting line ceremony, lit in Transfer the first torch, the torch will then along the torch after Gao Qing-feng new bridge - the world held elections beautiful Miss crown - Welcome Road - on River Bridge - on the Square - Haihong Square - Tianya Bay Beach - Tianya stone plaza.
北京奥运圣火在三亚的传递路线总长30.09公里,将在昭示着三亚发展新腾飞的地标、被誉为三亚奥运方舟母港的凤凰岛上的&火凤凰广场&举行起跑仪式,点燃境内传递的第一支火炬,随后火炬手们将高擎火炬沿途经过新凤桥—举办过世界性小姐选举的美丽之冠—迎宾路—月川桥—海月广场—海虹广场—天涯湾沙滩—天涯石广场。
-
Acer Bridge Group uphold the principle of "quality supreme, customer first" spirit of enterprise, enterprise has passed ISO 9001 international quality system certification, and won the government-issued corporate certificate of advanced technology and software development and production of corporate certificate, therefore,"macro bridge" piece of brand, not only represents a superb technology, a wealth of experience and standardized management, but also a high level product and service quality assurance.
宏桥集团秉持&质量至上,客户为先&的企业精神,企业已经通过ISO 9001国际质量体系认证,并荣获政府颁发的先进技术企业证书及软件开发生产企业证书,因此,&宏桥&这块金字招牌,不但代表着精湛的技术、丰富的经验及规范化的管理,更是高水平产品及服务质量的保证。
-
Xianju Bridge cents at Nim Xianju rural village, 20, from the county seat, is the largest wooden Taishun span arch bridge, but also Danyan arcade-style wooden bridge, around a green mountains and blue waters, just next to the bridge Xianju a new cement A bridge connected the county seat of the district roads, although a little Sha Fengjing, but to enjoy together, not really a new hi Yan Jiu.
仙居桥美分,至稔仙居县农村, 20岁,来自县城,是全球最大的木制泰顺跨径拱桥,而且还Danyan街机风格的木制桥梁,围绕着绿色群山和蓝色大海,旁边的一个新的桥梁仙居水泥桥连接县城区道路,虽然有点沙枫泾,但享受在一起,不是一个真正的新的高科技闫久。
-
This method selects two parameters, energy and variance, as the characteristic parameter of trolley track, and successfully in extracts the feature frequency belt of trolley track vibration. Furthermore, this technology is applied to practical engineering programs and has good veracity and reliability.2. According to the research of this thesis on the trolley tracks\' present data, the status classification of trolley track with normal distribution is presented. This method divides trolley tracks\' situations into five parts and perfects the classifying method of trolley tracks\' mechanical situation.
具体工作如下;1、将小波包分析方法运用到岸桥小车轨道振动信号的分析中,选取能(来源:A65BC0f论c0文网www.abclunwen.com)量与方差作为轨道的振动特征参数,有效提取出铰点部位与非铰点部位的振动特征频段。2、将正态分布原理引入到岸桥小车轨道铰点机械性能状态的划分之中,并用最大熵概率分布加以验证,准确地反映了实际情况,并定义了正态分布诊断准则的状态分级评价的原则和临界点,方便和简化了状态判断的决策过程。
-
Based on qualitative analysis and comparison of several options for suppressing transverse vibration on deck type steel plate girder of railway bridge,conclusions are made as follows:with static reinforcing,the vibration amplitude can be suppressed to some extent,but quasi-resonance of the bridge can not be avoided,moreover,the construction is inconvenient and costly.
通过对目前抑制铁路上承式钢板梁桥横向振动的几种方案进行定性的分析和比较,认为:静力加固方案可以使桥梁振幅有所减小,但不能避免准共振现象的发生,而且工程造价较高,施工也不方便;两桥连接方案减振效果明显(减振率近50%),比较经济也比较方便,但同样不能避免准共振现象的发生;动力减振方案可以有效的抑制桥梁的准共振现象(现场试验中减振率达51.83%),而且工程造价较低,施工简单、方便。
-
Thus, the stress behaviour of orthotropic steel bridge decks under elastic phase is well understood, in cluding the stress component of each structural system; the membrane and bending stress distribution in ribs, crossbeams and deck plates; the stress concentrations at the edges of cut-outs in crossbeams; the influence lines of stresses at some positions; and the number of stress cycles produced by the passage of a vehicle.
由此,充分完整地了解了正交异性钢桥面板弹性阶段的应力特性,包括钢桥面板各结构体系的应力成分,纵肋、横梁和盖板的薄膜应力和弯曲应力分布,横梁开孔边缘的应力集中,一些部位的应力影响线以及车辆通过引起的应力循环次数等。
-
Shaoxing County Jincheng Knitting Machine Manufactory is Located at the Keqiao of China Textile City,the largest textile market in China, Keqiao, which is famous for its old county, is of advantageous environment and convenient transportation, Presently,our factory is one of manufacturers who are early to produce the full-automatic gloves knitting machines stick to the business belief of the first quality, the best service on the basis of bottoming the business Spirit about starting a business and making great progress, and tries to become the best one in Technology development of machine production.
绍兴县金城针织机械制造厂,地处中国最大的纺织品交易市场——中国轻纺城——柯桥。素有江南水乡古县美誉的柯桥,地理环境优越,交通十分便利。本厂是目前中国较早生产全自动手套机的生产厂家,自创办以来,本着&创业奋进&的企业精神,始终坚持&质量第一,服务至上&的企业宗旨,力争成为本行业技术发展的佼佼者。
-
With rapid development of express way and city traffic and the type for city bridges, interchanges and viaducts such as continuous curved girder bridges are widely used. To get beautiful linetype, the top structure of bridge is required to apply cast-in-place technology. Therefore scaffold construction technology for beams are greatly applied.
随着桥梁结构型式的发展,以及近年来高速公路及城市交通的迅猛发展,变宽桥、弯桥等复杂的预应力混凝土结构得到了广泛的应用,因线型限制,桥梁上部结构一般采用现浇,这样有支架现浇技术得到了广泛的应用,同时应用中的技术、安全问题也日益突现出来。
-
In fact, multi-box girder bridge is different from T-beam multi-girder bridge. First, transverse distribution of load is influenced quite with the closed box beam; Secondly, as a simply-supported—continuous system, its 3-d structure behavior is remarkable, especially for a continuous skew bridge.
事实上,多箱式桥梁与T梁桥有很大的不同,其一是作为主要承重构件的梁为闭口箱梁,对荷载的横向分布有较大的影响,其二是采用先简支后连续的体系及桥面板的现浇湿接缝连接,其空间受力特征非常显著,对于具有斜交角度的桥梁更是如此。
- 推荐网络例句
-
For a big chunk of credit-card losses; the number of filings (and thus charge-off rates) would be rising again, whether
年美国个人破产法的一个改动使得破产登记急速下降,而后引起了信用卡大规模的亏损。
-
Eph. 4:23 And that you be renewed in the spirit of your mind
弗四23 而在你们心思的灵里得以更新
-
Lao Qiu is the Chairman of China Qiuyang Translation Group and the head master of the Confucius School. He has committed himself to the research and promotion of the classics of China.
老秋先生为中国秋阳翻译集团的董事长和孔子商学院的院长,致力于国学的研究和推广。