英语人>网络例句>桥 相关的搜索结果
网络例句

与 桥 相关的网络例句 [注:此内容来源于网络,仅供参考]

In order to study the influences of different wind speeds and wind yawed angles on the buffeting performance of bridge tower during construction,a wind tunnel test of bridge tower aeroelastic model was made based on considering the action of tower crane.

为了研究不同风速、风偏角在施工阶段对塔抖振性能的影响,进行了考虑塔吊共同作用的塔联合气弹模型风洞试验。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大,中心里程为DK608+393.00,该的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁方案,梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形台和矩形墩,设计中对台和墩进行了尺寸拟定,在满足构造和使用要求的前提下,台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对台和墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,跨采用直线布设,并且编制了该的施工组织设计,其中有工程项目的特征、施工方案、施工方法、梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大的总体及平面图。

Relationship between forces born by bridge and rail under the action of temperature variation, deflection and braking are analysed by using bridge ballast rail as an unified model , and simply supported bridges, 30 m and 40 m in span length, are calculated with a programme of finite element of two dimensional frame structure.

利用梁—道碴—轨道的统一模型,对梁温度伸缩、梁挠曲作用以及制动力作用下的轨受力关系进行了分析,并利用平面杆系有限元程序对30m及40m简支梁进行了计

Bridge is the structure of the Office of Coincidentally, on the whole, is a single arch bridge.

的结构十分厅巧,从整体来看,是一座单孔弧形

The arch is a very solid structure. Pillar-Support Bridge: Many pillars are set up on the river bed or the land to support the body of the bridge. Some of them have different levels for the cars and trains to get across.

拱是非常坚固的建筑结构;柱:很多墩在河床中或在地上从下方撑起身,有时身是凹陷的桁道,汽车和火车在中间通行。

The suspension developed specifically for the BMW X5 M and the BMW X6 M with its double-track control arm front axle and Integral IV rear axle offers M-specific elastokinematics thanks to stiffer track control arm mounts and hydraulic tiebar mounts at the front as well as stiffer axle support mounts at the rear.

暂停开发了宝马X5 M和宝马X6 M特别是其双轨控制臂前和后整体四提供的M -特定弹性运动学由于严厉的跟踪控制臂哥林柱支架和液压支架在前线以及严厉轴支持坐骑在后面。

Factory mainly produces a variety of models stamping products, automobile gearbox has rocker series, transmission side cover, rear shell cap, axle housing through housing cap, wheel covers, axle bonnet, fender, blocking dust disk, block oil pan, brake disc, the size of side panels, cantilever series, foot ring, Cypriot films, gaskets and other products series, model range, the product in accordance with national standards of production, quality of advanced industrial countries, the level of similar products, plant technology and strong focus on technology innovation and development, while factory also continues to prosper, has grown strength.

本厂主要生产多种车型的冲压件产品,有汽车变速箱摇臂系列、变速箱侧盖、后壳盖、贯屋壳盖、轮毂盖、轴头盖、挡泥板、挡尘盘、挡油盘、刹车盘、大小侧板、悬梁系列、脚踏圈、塞片、垫圈系列等产品,型号齐全,产品按国家标准生产,质量达到先进工业国家的同类产品水平,该厂技术力量雄厚并且注重技术的创新和发展,同时本厂也在不断蓬勃发展,实力不断壮大。

The rear axle casing is stamping welded, its performance compareing favorably with the one made by traditional two poles press axle tube , which also can be adopted with different welding structure according to different user and more flexible .

壳为冲压焊接式,性能优于传统的两端压半轴套管的铸造壳,并且可以根据不同用户要求采用相应的焊接结构,柔性化更高,可达到一壳多样的效果。

Beijing Olympic Torch in Sanya, the chief of 30.09 km transmission line will be shown in Sanya in the development of new take-off of Landmark, known as Sanya Olympic Ark of the Phoenix home port on the island of "Fire Phoenix Plaza" at the starting line ceremony, lit in Transfer the first torch, the torch will then along the torch after Gao Qing-feng new bridge - the world held elections beautiful Miss crown - Welcome Road - on River Bridge - on the Square - Haihong Square - Tianya Bay Beach - Tianya stone plaza.

北京奥运圣火在三亚的传递路线总长30.09公里,将在昭示着三亚发展新腾飞的地标、被誉为三亚奥运方舟母港的凤凰岛上的&火凤凰广场&举行起跑仪式,点燃境内传递的第一支火炬,随后火炬手们将高擎火炬沿途经过新凤—举办过世界性小姐选举的美丽之冠—迎宾路—月川—海月广场—海虹广场—天涯湾沙滩—天涯石广场。

Another type of beam bridge is the cantilever, in which a horizontal beam extends beyond its support.

另一种梁是悬臂,该的水平梁可伸出到墩以外。

第44/100页 首页 < ... 40 41 42 43 44 45 46 47 48 ... > 尾页
推荐网络例句

We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.

索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。

The relationship between communicative competence and grammar teaching should be that of the ends and the means.

交际能力和语法的关系应该是目标与途径的关系。

This is not paper type of business,it's people business,with such huge money involved.

这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。