桁
- 与 桁 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
One of two spar s or booms projecting from the side of a bowsprit for spreading the jib or flying - jib guys.
左右撑杆从船首斜桁侧边支出的两根圆杆或桅桁下的一根,用于展开三角帆或伸开三角帆的绳索
-
A small boat used for fishing,sailing,or coasting and having two or three masts,each with a lugsail,and two or three jibs set on the bowsprit.
小帆船用于捕鱼,航海或沿海贸易的小船,它有两三个桅杆,每个桅杆都有斜桁四角帆,在船看斜桁有两三个三角帆
-
A small boat used for fishing,sailing,or coasting and having two or three mast s,each with a lugsail,and two or three jibs set on the bowsprit.
小帆船用于捕鱼,航海或沿海贸易的小船,它有两三个桅杆,每个桅杆都有斜桁四角帆,在船看斜桁有两三个三角帆
-
A large jib used on a racing yacht.One of two spars or booms projecting from the side of a bowsprit for spreading the jib or flying-jib guys.
左右撑杆从船首斜桁侧边支出的两根圆杆或桅桁下的一根,用于展开三角帆或伸开三角帆的绳索
-
This bridge design for 2×80m the continual steel truss girder bridge, the span is 160m, the main spar center distance is 5.75m, clothes rack high 11m, panel length 8m, the main spar geometry graphical representation uses the triangle web member system, the floor system by the carline, the crosnbeam is composed, the member connection uses the high-strength bolt connection, the design load for the dead load and - the live load.
该桥设计为2×80m连续钢桁梁桥,全长为160m,主桁中心距为5.75m,桁高11m,节间长8m,主桁的几何图示采用三角形腹杆体系,桥面系由纵梁,横梁组成,杆件连接采用高强螺栓连接,设计荷载为恒载和中—活载。
-
Type: Big Class Gaff-Rigged Cutter - Builder: White Brothers, Southampton, 1920 designed by Herbert White LOA: 46.30m Length on waterline吃水线长: 24.60m Beam船宽: 7.60m Draught吃水: 5.20m Displacement排水量: 180t Mast, boom, gaff and bowsprit桅杆,下桁,斜桁,船首斜桁: 52m, 27.60m, 16m, and 9.5m in spruce Sail area: 1450m2 Sails: in Dacron, sewn with traditional techniques Engine: Yanmar 380HP Motoring speed: 9 knots Speed under sail: approx.
船型:Big Class斜桁帆船-建造:怀特兄弟,南安普顿,1920年设计:赫伯特。
-
A rope, rod, or batten along the upper side of a yard, gaff, or boom to which a sail is fastened.
天篷支索吊在帆桁、斜桁或木桁上面的绳、杆或压条,用来收紧帆
-
Constraint of the middle truss on the crossbeams approximates to absolute rigidity and the distance between the stringer and the middle low chord are small in the four-line through truss bridge with three main trusses, which produces much larger horizontal bending stresses of the crossbeams as compared with two-truss bridges.
在四线铁路三主桁下承式钢桁梁桥中,中桁对横梁的约束近于绝对刚性,纵梁离中桁下弦杆的距离较小,使横梁的面外弯曲应力较二主桁桥梁大得多。
-
Any of several parts of standing rigging strengthening the bowsprit and jib boom against the force of the head stays.
艏斜桁撑杆,艏斜桁撑杆支索一种直立索具,用以加固船首斜桁和船斜帆桁,以抵御船头支索力量
-
In this paper, the through truss composite beam is first equalized to a box beam and the progression solutions to the temperature effect of the composite beam are then obtained with the variation method.
首先将下承式桁梁结合梁等效为箱形梁,再用变分法求出了下承式桁梁结合梁温度效应的级数解,并对京沪高速铁路上的一座简支下承式钢桁结合梁桥进行了计算,其结果可供下承式桁梁结合梁设计参考。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。