英语人>网络例句>根据计划的 相关的搜索结果
网络例句

根据计划的

与 根据计划的 相关的网络例句 [注:此内容来源于网络,仅供参考]

Topics covered include: programming and computability theory based on a term-rewriting,"substitution" model of computation by Scheme programs with side-effects; computation as algebraic manipulation: Scheme evaluation as algebraic manipulation and term rewriting theory; paradoxes from self-application and introduction to formal programming semantics; undecidability of the Halting Problem for Scheme; properties of recursively enumerable sets, leading to Incompleteness Theorems for Scheme equivalences; logic for program specification and verification; and Hilbert's Tenth Problem.

其所包含的主题:程序和运算理论是基于根据算数和具有一些副作用的计划纲要的条款重写和"代入"模式之上的、关于代数学计算的算数:关于代数学计算和术语重写理论的评价方案作计划、应用程序自己和说明的自相矛盾到形式上的程序语义、关于计划Halting 问题的不可判定性、可递归可列举集合的属性、导致对于等同计划的不完整规则、对于逻辑和证明程序的规范和Hilbert的第十问题。

Manage annual and monthly production plan according to sales plans to ensure finished goods supply with optimized inventory.

根据销售计划监管年度和月度计划的执行,确保产品供应及最优化库存。

Ensure that closure and reclamation plan is updated on yearly base according to LOM plan changes and standard requirements.

8226;根据LOM计划的变动和标准的要求,确保每年定期更新闭坑及复垦计划

With the guidance of system functional target, researches and develops theplanning management system, designs its main functions, analyzes the making flow of Master Production Schedule and Material Requirement Planning in detail, balances the Planning control and agile manufacture, describes the designing process of production management database, presents its E-R graph and main basis tables of database.

根据系统功能目标,研究开发了计划管理系统,设计了计划管理系统的主要功能,对主生产计划、物料需求计划的制定流程进行了详细分析,实现了计划控制与灵活生产的有机结合。对生产管理数据库的设计过程作了详细的阐述,给出了生产管理系统E—R图和主要的数据库基表。

According to the working characteristics of high-speed railway station, the principles to track using are formulated. Regarding the system of receiving and dispatching trains as a queuing system, the working process of making track plan is studied through analyzing the working process of queuing system. Moreover, the adjustment principles and measures for track plan are studied, and then the working process of making the adjustment plan on track using is set down.

根据高速铁路车站作业特点制定了到发线使用原则,并把车站接发车系统看作一个排队系统,通过分析排队系统作业过程研究了编制到发线运用计划的工作流程;进而研究了当列车运行波动时,到发线运用计划的调整原则和调整方法,制定了编制到发线调整计划的工作流程。

The New Scheme is in line with the prevailing requirements of Chapter 17 of the Listing Rules in relation to share option schemes.

根据旧计划授出的所有认股权将继续有效,并可根据旧计划的条款行使。

All options granted under the Old Scheme shall continue to be valid and exercisable in accordance with the terms of the Old Scheme.

根据旧计划授出的所有认股权将继续有效,并可根据旧计划的条款行使。

A reasonable capital plans, should be to be below the premise that makes sure normal production manages need, dig latent capacity of enterprise interior capital hard, active organization is devoted, managing defray, the integrated balance of link of the balance that carries fund income and expenses, balance of supply and demand of goods and materials, sale, it is a foundation in order to run a plan, with the branch the plan has an authorized strength for the basis, strengthen the plan management of capital, analyse capital trends, according to the plan, need of check and ratify, can make the use of capital achieves optimization.

一个合理的资金计划,应是在保证正常生产经营需要的前提下,努力挖掘企业内部资金潜力,积极组织投入,节约支出,通过资金收支的平衡、物资供需的平衡、营销环节的综合平衡,以经营计划为基础,以部门计划为依据进行编制,加强资金的计划管理,分析资金动态,根据计划,核定需要,可使资金的使用达到最优化。

According to the marketing strategies, I helped the general sales manager to draw the sales and marketing plans of our department; I also assisted the sales manager to issue sals tasks and try to complete them

根据公司的销售策略,协助销售经理制定本部门总体销售计划及销售目标;协助销售经理将销售计划并将任务下达,完成公司销售任务

Furthermore, the other focal point of train operation adjustment, to adjust train unit routing, is studied comprehensively. First the difference between the primary plan and the adjustment plan of train unit is discussed, and then the working process of making optimal adjustment plan is studied based on some adjustment principles which are set based on the adjustment goal.

动车组折返交路的调整是高速铁路列车运行调整的两个重点之一,本文对该问题进行了较为全面的研究,首先分析了动车组运用计划与调整计划的区别,然后根据调整目标制定了调整原则,在此基础上研究了动车组调整计划优化编制的工作流程。

第1/39页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。