机组
- 与 机组 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the actual circumstance according data surveillance and the thinking of trouble to get the better control of the air preheater.
在实际情况中主要通过数据监视及事故预想是否正常也关系到机组在调负荷时的安全。
-
Is ground clear? Can I pressurize the hydraulic system?
机组:地面是否安全,是否可以打泵?
-
Based on the theory of physics and material mechanics, this paper analyses the variation principle of the paper ribbon tension between each printing unit; establishes the mathematic model of unwinding, tension variation between each printing unit and the dynamics model of the dancer rollers.
基于无轴试验平台建立了纸卷开卷的数学模型、机组之间张力变化的数学模型以及张力调节辊的动力学模型。
-
The crew of the Prowler consists of the pilot and three electronic countermeasures officers.
机组人员包括一名飞行员和三名电子对抗干扰操作手。
-
Strive to close stop group of small fire electric machinery 10 million kilowatt, wash out backward puddling to produce can 30 million tons, backward steel-making is produced can 35 million tons; Fall into disuse to was not being finished backward produce can the place of the task, strict control country plans the project of investme......
力争关停小火电机组1000万千瓦,淘汰落后炼铁产能3000万吨、落后炼钢产能3500万吨;对没有完成淘汰落后产能任务的地方,严格控制国家安排投资的项目。。。。。。。关键词:节能重点产品项目节能,工作
-
Currently there are no plans for units larger than either the Puente Hills or Incheon facilities.
目前没有计划安装比朋地山或仁川发电厂更大的机组设备。
-
The steady mathematic model of water source heat pump unit for small house is established,and the characteristics of the unit are simulated.
由于可利用水源的多样性和地源水井的开凿以及地质状况的不确定性,使得水源出水温度各不相同,进而影响到机组型号的选择。
-
This paper introduces the causes of noise generation and propagation of indoor water supply and sewerage system , probes into the corresponding solution of controlling indoor noise, mainly discusses water pump house oscillation reducing and noise isolating, selection of drain pipe material and control of velocity and pressure of water supply pipe.
介绍了建筑室内给水排水系统噪声产生与传播的原因,探讨了控制建筑室内噪声的相应对策,重点论述了给水泵房的设置、水泵机组的减振隔声、排水管材的选择、给水管道流速和压力的控制等内容。
-
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit,including geological conditions,structure and construction preparation,ordering and scheme.
对华能玉环电厂1 000 MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
-
It seems we would need to buy a new pump unit as well as load cells and the computer unit.
看来,我们将需要购买一台新机组,以及负载细胞和计算机股。
- 推荐网络例句
-
Lugalbanda was a god and shepherd king of Uruk where he was worshipped for over a thousand years.
Lugalbanda 是神和被崇拜了一千年多 Uruk古埃及喜克索王朝国王。
-
I am coming just now,' and went on perfuming himself with Hunut, then he came and sat.
我来只是现在,'歼灭战perfuming自己与胡努特,那麼,他来到和SAT 。
-
The shamrock is the symbol of Ireland and of St.
三叶草是爱尔兰和圣特里克节的标志同时它的寓意是带来幸运。3片心形叶子围绕着一根断茎,深绿色。