最佳化问题
- 与 最佳化问题 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
However, in some specific areas, engineers often misuse factorial design on mixture experiments.
然而在材料、化工、或食品等产业中,有许多属於混合实验范畴之最佳化设计问题,却常误以传统因子实验设计之。
-
Therefore, this study aims to develop a global optimization method for solving nonlinear fractional programming problems.
也因此,本研究的目的就在於:提出一个全域最佳化方法来求解非线性分式规划的问题。
-
This research design each intersection offset by relative offset, and derive a "the expected value of progressive intersection number model". This research is for the sake of improving the traditional bandwidth method which is unable to accord with progression demand of every intersection to assign the progression ability effectively, and know the vehicles' real progression ability in the arterial system.
由於群组划分后各子系统路口时差以「绝对时差」进行设计,将无法直接进行相异周期之群组间路口时差最佳化求解,本研究遂以「相对时差」进行各路口间时差设定,并推导一「续进路口数期望值」模式,以改善传统绿灯带宽法无法依据各路口续进方向之交通需求量,有效分配各路口双向续进能力,且无法由绿灯带宽得知系统内车辆真实的续进能力之问题。
-
Engineering design problems have two characteristics: the design variables are often monotonic in the objective function and constraints. Moreover, the objective function and constraints are often implicit functions which cannot be expressed explicitly in terms of design variables.
工程最佳化设计问题通常有两个特性:设计变数在目标函数与限制条件常具有单调性,且其目标函数与限制条件常为内隐式函数,也就是不能以设计变数来表示其外显形式。
-
We propose a procedure, referred to as Model-based Computing Budget Allocation, which combines the queuing theory and the optimum design of experiment to solve the budget allocation problem with multiple decision variables.
因此,我们希望提出一种新的方法—模型基础计算资源分配(Model-based Computing Budget Allocation),这个方法结合了等候理论以及最佳化实验设计理论,用来解决多个任意变数的计算资源分配问题。
-
Without such detailed information, raking comes as a rescue since it requires only the knowledge of marginal distributions of selected variables. Popular as it may be, raking takes no account of associations among post-stratifying variables. Furthermore, it relies heavily on Chi-squared tests and a pre-selected p-value (usually 0.5) as the stopping rule of iteration, an ad hoc rule justified only by convenience.
因此,目前最常采用的是「反覆多重加权」的方式,但「反覆多重加权」实际执行时,最大的问题在於其检定方式是透过卡方检定,通常只要其检定P值大於0.5,就认定样本与母群一致,而未考虑一个最佳化的加权值。
-
Otherwise, if they just view select parts of the total inventory, suboptimization and problems could occur with production or shipping orders.
以别的方式,如果他们仅仅看完全详细目录的些许部份、次最佳化和问题可以以生产或运送次序发生的选择。
-
Among many research problems in bioinformatics, the shortest superstring problem has wide applications in many research areas, such as DNA sequencing and data compression.
在解决NP-hard的问题上,近代有许多最佳化方法被探讨,包括了:蚂蚁演算法、基因演算法、模拟退火法、或一些启发式演算法等等。
-
Project management is akey methodology that Western businesses use on aregular basis to solve problems,to launch new products and services,and to maximize the use of personnel.
项目管理是一门科学理论,西方企业运用这一理论来解决问题,指导新产品或服务投放市场,也用来指导人员的最佳化配置。
-
It is shown that 1 IGA is efficient enough to solve subproblems; 2 IGA is significantly superior to the existing method SPXGA; and 3 iTEA performs well in inferring S-system models for dynamic pathway identification.
实验结果显示:(1) IGA 能够有效地解决含有含有 2(N +1)调控参数的子问题;(2)相较於前人所采用 SPXGA 演算法,IGA 明显具有更好的最佳化搜寻能力;(3) iTEA 能够有效率地解决S-system 基因调控网路模型的重建问题。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。