英语人>网络例句>施工详图 相关的搜索结果
网络例句

施工详图

与 施工详图 相关的网络例句 [注:此内容来源于网络,仅供参考]

Introduced are the method and detail drawing of waterproof construction of basement anti-floating anchor rod and dewatering well.

对地下室抗浮锚杆及降水井处提出了防水作法及构造详图,抗浮锚杆处采用二道改性沥青油膏及二道改性沥青防水卷材防水,降水井处采用根据施工经验改进后的防水措施,增加了卷材套箍及滤水槽。

Based on the measurement results, the elastic modulus and the longitudinal wave velocity of diabase and argillaceous limestone are organized and regressed to calculate their correlation.

百色水利枢纽消力池的工程地质条件复杂,在施工详图设计阶段对其进行专门勘察时做了大量的钻孔变形参数测试和声波测试,利用钻孔变形参数测试和声波测试结果,对辉绿岩、泥质灰岩的弹性模量和纵波速度进行整理、回归,求出其相关性。

Analyzing the model, especially the activity of Taihang Mountain piedmont fault, we got such main conclusion:1. Based on sequence stratigraphy, the strata is divided from the selected drills. And the Quaternary stratigraphic framework of Handan city is established, dividing the Quaternary strata into four parts- Qh, Qp3O , Qp2Y and Qp1G.2. With all the selected drill data of Handan city, a drill database is established. A quaternary strata 3D model of Handan city is imitated by GOCAD and ArcGIS, and so are the bottom structural map of each horizon.3. Analyzing the 3D model and the contradistinction section of drills, we got: the stratum of Qh and Qp3 is smooth and flat, with a feature of a higher west, little difference between south and north and undistinctness of faults; there are several depocenters along S-N and N-W in the stratum of Qp2, and the evolution of the stratum is controlled by a couple of ruptures, which means the tectonic movement is active in this period of time.4. Since quaternary, main tectonic movements happened in Qp2 and have been stable in Qp3 and Qh.

获得主要结论如下:1、利用层序地层学的方法将收集的邯郸市钻孔以及论文所依托项目野外施工的钻孔进行了具体的地层划分与对比,建立了邯郸市第四系等时地层格架,将邯郸市第四系划分为全新统、更新统上部欧庄组(Qp3O)、更新统中部杨柳青组(Qp2Y)和更新统下部固安组(Qp1G)。2、利用收集到的邯郸市水文、工勘钻孔以及所依托项目初勘和详勘两个阶段野外施工的钻孔数据,建立钻孔数据库,通过使用三维建模软件GOCAD和地理信息系统软件ArcGIS等进行模拟,得到邯郸市市区部分第四系地层三维可视化模型,并获得各个地层的底部构造图;3、通过对所天生模型和钻孔廊带对比剖面的分析,可以得到:全新世和更新世晚期(Qp3)时期地形整体较平缓,整体上显示西高东低、南北差异不大的格式,断裂显示不明显;更新世中期(Qp2)时期沿南北向和北西向存在几个沉积中心,地层发育受几条断裂的控制,反映了研究区的构造活动在更新世中期较为活跃;4、邯郸市自第四系以来,主要构造运动均发生于更新世中期,到更新世晚期及全新世时期逐渐趋于稳定,进而使更新统上部和全新统地层沉积均一且完好。

Design on the principle that security , economy are rational , esthetic , fix up the selection of structure and structural level of every floor, assign , turn into with PK software AutoCAD revise the part behind the structural level well; Adopt stair and floor calculating and designing a teacher to appoint by hand, and calculate the appointed floor with PKPM software, compare with the floor that calculates by hand, fetch the drawing construction drawing of the head of the two; Calculate by hand the frame which the teacher appoints loads, set up good PKPM and calculate the procedure model of the frame , calculate frame internal force and output file result with PKPM , calculate , get PKPM structure mix muscle picture turn into AutoCAD carry on part punish; Build up pieces of internal force association from frame that PKPM obtain , choose three group unfavorable association design the materials as the foundation most, carry on the design basis of the craft, and draw and obtain the basic detail drawing and match the muscle with AutoCAD.

本毕业设计以指导老师发放的《港市公安局巡警支队办公楼》建筑施工图纸为原始资料,进行结构设计和施工组织设计,设计的主要依据为现行的建筑行业规范以及指导老师的指导思想。设计以安全、经济合理、美观为原则,进行结构选型和各楼层结构平面布置,用PK 软件布置好结构平面后再转到AutoCAD上进行局部修改;采用手工计算设计老师指定的楼梯和楼板,并用PKPM 软件计算指定楼板,与手工计算的楼板进行比较,取二者之长绘制成施工图;手工计算老师指定的框架荷载,建立好PKPM计算框架程序模型,用PKPM计算框架内力并输出文件结果,把PKPM计算得到结构配筋图转到AutoCAD进行局部处理;从PKPM得出的框架构件内力组合,选择三组最不利的组合作为基础设计资料,进行手工设计基础,并用AutoCAD绘制得出基础详图及配筋。

Design on the principle that security , economy are rational , esthetic , fix up the selection of structure and structural level of every floor, assign , turn into with PK software AutoCAD revise the part behind the structural level well; Adopt stair and floor calculating and designing a teacher to appoint by hand, and calculate the appointed floor with PKPM software, compare with the floor that calculates by hand, fetch the drawing construction drawing of the head of the two; Calculate by hand the frame which the teacher appoints loads, set up good PKPM and calculate the procedure model of the frame , calculate frame internal force and output file result with PKPM , calculate , get PKPM structure mix muscle picture turn into AutoCAD carry on part punish; Build up pieces of internal force association from frame that PKPM obtain , choose three group unfavorable association design the materials as the foundation most, carry on the design basis of the craft, and draw and obtain the basic detail drawing and match the muscle with AutoCAD.

建筑毕业设计计算书74页、CAD图纸、施工组织设计全套摘要:本毕业设计以指导老师发放的《港市公安局巡警支队办公楼》建筑施工图纸为原始资料,进行结构设计和施工组织设计,设计的主要依据为现行的建筑行业规范以及指导老师的指导思想。设计以安全、经济合理、美观为原则,进行结构选型和各楼层结构平面布置,用PK 软件布置好结构平面后再转到AutoCAD上进行局部修改;采用手工计算设计老师指定的楼梯和楼板,并用PKPM 软件计算指定楼板,与手工计算的楼板进行比较,取二者之长绘制成施工图;手工计算老师指定的框架荷载,建立好PKPM计算框架程序模型,用PKPM计算框架内力并输出文件结果,把PKPM计算得到结构配筋图转到AutoCAD进行局部处理;从PKPM得出的框架构件内力组合,选择三组最不利的组合作为基础设计资料,进行手工设计基础,并用AutoCAD绘制得出基础详图及配筋。

Design on the principle that security , economy are rational , esthetic , fix up the selection of structure and structural level of every floor, assign , turn into with PK software AutoCAD revise the part behind the structural level well; Adopt stair and floor calculating and designing a teacher to appoint by hand, and calculate the appointed floor with PKPM software, compare with the floor that calculates by hand, fetch the drawing construction drawing of the head of the two; Calculate by hand the frame which the teacher appoints loads, set up good PKPM and calculate the procedure model of the frame , calculate frame internal force and output file result with PKPM , calculate , get PKPM structure mix muscle picture turn into AutoCAD carry on part punish; Build up pieces of internal force association from frame that PKPM obtain , choose three group unfavorable association design the materials as the foundation most, carry on the design basis of the craft, and draw and obtain the basic detail drawing and match the muscle with AutoCAD.

土木工程毕业设计 6层办公楼计算书+图纸+施工设计全套)摘要:本毕业设计以指导老师发放的《港市公安局巡警支队办公楼》建筑施工图纸为原始资料,进行结构设计和施工组织设计,设计的主要依据为现行的建筑行业规范以及指导老师的指导思想。设计以安全、经济合理、美观为原则,进行结构选型和各楼层结构平面布置,用PK 软件布置好结构平面后再转到AutoCAD上进行局部修改;采用手工计算设计老师指定的楼梯和楼板,并用PKPM 软件计算指定楼板,与手工计算的楼板进行比较,取二者之长绘制成施工图;手工计算老师指定的框架荷载,建立好PKPM计算框架程序模型,用PKPM计算框架内力并输出文件结果,把PKPM计算得到结构配筋图转到AutoCAD进行局部处理;从PKPM得出的框架构件内力组合,选择三组最不利的组合作为基础设计资料,进行手工设计基础,并用AutoCAD绘制得出基础详图及配筋。

Within 15 days after Contractor''''s receipt of disapproved shop drawings, revised shop drawings shall be resubmitted to Architect.

承包商在收到设计师关于安装施工详图的否认意见后,应在15天内将修改后的安装施工详图提交给设计师。

推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?