损坏
- 与 损坏 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the event of loss of time due to(1) deficiency of men or stores;(2)breakdown or damage to hull, machinery or equipment;(3) detention by average accidents to ship or cargo including collision and stranding;(4) repairs, drydocking or other necessary measures to maintain the efficiency of the Vessels (5)failure to possess or carry on board valid certificates, and/or other Vessel's documentation for the cargo service, including valid Panama and Suez Canal admeasurement certificates;(6) strikes, refusal to sail, breach of orders or neglect of duty on the part of the Master, Officers or Crew;(7) detention of or interference with the Vessel by any authorities in consequence of legal action against, or breach of regulations by the Owners, Master, Officers or Crew (unless brought about by the negligent act or omission of Charterers);(8) stoppages resulting from any breach of this Charter by the Owners;(9) deviation, putting back or putting into any port other than that to which she is bound under the instructions of Charterers for any reason or for any purpose mentioned in this Clause or for the purpose of obtaining medical advice or treatment for or landing any sick or injured ship's personnel;(10) those agreed as off-hire as elsewhere provided herein or any other causes either hindering or preventing the efficient working of the Vessel, or rendering the Vessel unavailable for the Charterers' service, hire to cease from commencement of such loss of time until the Vessel is again in an efficient state to resume her service from a position not less favourable to Charterers than that at which such loss of time commenced.
如时间损失是由于(1)人员或船用品不足;(2)船壳、机器或设备损坏;(3)船舶或货物遇到海损事故包括碰撞和搁浅而造成延误;(4)修船、进行干船坞或保持本船效能所采取的其他必要措施;(5)未持有或未随船携带货运需要的有效证件及或其他船舶文件,包括有效的巴拿马和苏伊士运河丈量证件;(6)船长、船员或水手的罢工、拒航、违抗命令或失职;(7)任何当局因船东、船长、船员或水手受到控告或违章对本船实行拘留或干预(但租船人的疏忽行为或不行为所引起者除外);(8)船东违反租约而停工;(9)由于本条所提到的任何原因或任何目的或由于伤病船员上岸治疗而使本船绕航,折返或靠挂非租船人所指示的其他港口;(10)本租约另有规定的停租项目或其他任何原因,以致妨碍或阻止本船有效运行或使本船不能给租船人使用,则从时间损失起至本船重新处于有效状态,在不使租船人比时间损失开始之时的船位吃亏的地点恢复服务止,租金停止。
-
In the event of loss of time due to (1)deficiency of men or stores;(2)breakdowm or damage to hull, machinery or equipment;(3)detention by average accidents to ship or cargo including collision and stranding;(4)repairs, drydocking or other necessary measures to maintain the efficiency of the Vessel;(5)failure to possess or carry on board valid certificates, and/or other Vessel's documentation for the cargo service, including valid Panama and Suez Canal admeasurement certificaters;(6)strikes, refusal to sail, breach of orders or neglect of duty on the part of the Master, Offieers or Crew;(7)detention of or interference with the Vessel by any authorities in consequence of legal action against, or breach of regulations by the Owners, Master, Officers or Crew (unless brought about by the negligent act or omission of Charterers);(8) stoppages resulting from any breach of this Charter by the Owners;(9)deviation, putting back or putting into any port other than that to which she is bound under the instructions of Charterers for any reason or for any purpose mentioned in this~Clause or for the purpose of obtaining medical advice or treatment for or landing any sick or injured ship's personnel;(10)those agreed as offhire as elsewhere provided herein or any other causes either hindering or preventing the efficient working of the Vessel, or rendering the Vessel unavailable for the Charterers' service, hire to cease form commencement of such loss of time until the Vessel is again in an efficient state to resume her service from a position not less favourable to Charterers than that at which such loss of time commenced.
如时间损失是由于(1)人员或船用品不足;(2)船壳、机器或设备损坏;(3)船舶或货物遇到海损事故包括碰撞和搁浅而造成延误;(4)修船、进行干船坞或保持本船效能所采取的其他必要措施;(5)未持有或未随船携带货运需要的有效证件及或其他船舶文件,包括有效的巴拿马和苏伊士运河丈量证件;(6)船长、船员或水手的罢工、拒航、违抗命令或失职;(7)任何当局因船东、船长、船员或水手受到控告或违章对本船实行拘留或干预(但租船人的疏忽行为或不行为所引起者除外);(8)船东违反租约而停工;(9)由于本条所提到的任何原因或任何目的或由于伤病船员上岸治疗而使本船绕航,折返或靠挂非租船人所指示的其他港口;(10)本租约另有规定的停租项目或其他任何原因,以致妨碍或阻止本船有效运行或使本船不能给租船人使用,则从时间损失起至本船重新处于有效状态,在不使租船人比时间损失开始之时的船位吃亏的地点恢复服务止,租金停止。
-
The larger velocity and more times Aeolian flow was, the greater the decrease of net photosynthetic ratio was.
在风沙流后脯氨酸的积累有利于防止植物细胞结构和功能的损坏。
-
Frequently clear the attachment on impellers to avoid load increasing, so as to not damage aerator by overload.
应经常清除叶轮附着物,防止负荷增加,以免造成过载运行而损坏增氧机。
-
This equipment use and popularity has the extremely vital significance to protect oil aerosphere, reduce the recovery cost, enhance the recovery ratio, protect environment.
作业完毕后,尚需把高比重的压井液替换出来,最为严重的是高比重压井液对地层造成污染和堵塞,导致区块内油井产量降低和注水井的过早损坏。
-
Without any trace of fractures in its body, the bed is believed to be made out of a single agalwood block.
据信,这张没有任何损坏的古董床是由一整块沉香木制做而成的。
-
She was aghast at the extent of the damage to her car.
她的汽车的损坏程度使她震惊。
-
A 1976 earthquake near Guatemala City shattered this bridge in Agua Caliente, cutting off the city's main supply route to the Atlantic.
意译:位于危地马拉的Agua Caliente城市附近的桥,在1976年发生地震中造成损坏,以至中断了到大西洋的主要供应道路。
-
The air commodore brief the bomber crew on their dangerous mission.
飞行员靠一台发动机设法使损坏了的轰炸机安然降落。
-
Refer to the damage problem to the motor of C41-400 air hammer caused by driving system fault, an acknowledged improvement that is adding a V-belt driving into the system has been promoted with failure situations occasionally because of irrational supporting structures.
针对C41-400型空气锤由于传动系统故障而导致电动机损坏的问题,通常的改进方案是增加一级V带传动,但由于对改造中的支承设计不合理而失败的情况也时有发生。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。