英语人>网络例句>挖下 相关的搜索结果
网络例句

挖下

与 挖下 相关的网络例句 [注:此内容来源于网络,仅供参考]

In this case, this is a hollowed out C-3PO that you can store stuff in. For example, you can shove an iPad in there.

在这种情况下,这是一个挖空的C - 3PO的,你可以存储的东西进来,例如,你可以推一ipad公司在那里。

You can walk up and down this range, and you can look for drivers, putters, wedges, but there's not many products that have been as successful as the Q-Link in terms of victories on the PGA tour.

& &你可以走向上和向下此范围内,你可以找司机,推杆,挖起杆,但不是很多产品已取得成功的Q -连接而言,胜利的PGA巡回赛。

Right off the bat, the lander's robotic scoop appeared to hit solid ice just below the surface, and scientists were rewarded with time-lapse images of ice subliming into the thin Martian atmosphere from one of the trenches it dug.

凤凰号在当初刚着陆时,它的机械铲铲似乎就碰到了地表下的固态冰,同时科学家们也满意得看到了,在它挖出的一个沟渠中有冰升华到火星稀薄大气层中的延时图像。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

As you scoop it up, remember to glance at your air gauge. How much gold can you take without endangering your survival?

当你挖掘的时候,记住不时看一下你的气压,在保证活命的情况下,你可以挖到多少黄金呢?

The Rice, The Bat, The Baby (6)Last night my daughter woke up at 4 ante meridiem in high spirits and yelled at us until we look her downstairs to the kitchen. She duginto her toy basket and got out her favorite doll, which laughs when you whack it, a perverseinvention indeed.

昨天凌晨四点我女儿兴致勃勃的醒来,对著我们吼叫,直到我们带她下楼去厨房,她从玩具篮里挖出她最喜欢的娃娃,这娃娃只要用力打,它就会笑,真是挺变态的发明。

They unearthed a box buried under a tree.

他们挖出了一个埋在树下的盒子。

They unearth ed a box buried under a tree.

他们挖出了一个埋在树下的盒子。

By comparing the pictures captured during cutting, we can see that chip breaker plays its role most in the planing cutting direction. The cut fibers are break by chip break before hand, so that digging out reduces.

从切削过程中采集的图片及切屑状态,并对照试验一的图片,可以看出在纵向切削时断屑器所起的作用最为明显,切屑在断屑器的作用下被提前折断,加工试件表面的挖切现象也比试验一中有所减少。

第9/12页 首页 < ... 4 5 6 7 8 9 10 11 12 > 尾页
推荐网络例句

And Pharaoh spoke to Joseph, saying, Your father and your brothers have come to you.

47:5 法老对约瑟说,你父亲和你弟兄们到你这里来了。

Additionally, the approximate flattening of surface strip using lines linking midpoints on perpendicular lines between geodesic curves and the unconditional extreme value method are discussed.

提出了用测地线方程、曲面上两点间短程线来计算膜结构曲面测地线的方法,同时,采用测地线间垂线的中点连线和用无约束极值法进行空间条状曲面近似展开的分析。

Hey Big Raven, The individual lies dont matter anymore - its ALL a tissue of lies in support of...

嘿大乌鸦,个别谎言的事不要再-其所有的组织的谎言,在支持。