英语人>网络例句>指标 相关的搜索结果
网络例句

指标

与 指标 相关的网络例句 [注:此内容来源于网络,仅供参考]

Fixed the provocative locus of genioglossus and its controlling nerve with local anatomy.Estimated obstructive level of pharyngeal cavity by observing muller′s maneuver under fiberolaryngoscope.

结果 :舌后咽平面狭窄或阻塞,所测呼吸紊乱指标均明显下降(P 。0 5 ),血氧饱和度显著提高(P 。0 5 ),临床症状改善;RTBP及腭咽多平面混合狭窄和阻塞仅部分指标改善;PP平面狭窄或阻塞,各指标均无改善;影响睡眠的指标无升高。

Thirdly, by means of distinguishing its features, in accordance with thesetup rule, with the aboved feature of society, economy, environment, logistics industry andsystem and network, and so on, in order to achieve sustainable development as target, throughfour angles as society, economy, environment, logistics industry, select 8 index to establish it,moreover, use the AHP law obtain their weight, besides, by analyzing incompatible problembetween index and method, existed in traditional methods, in accordance with principle andfeature of extension synthesis assessment method, evaluate and optimate logistics centerplanning schemes and get an accurate result in the practical example.

再次,通过分析研究物流中心规划方案的特点,根据建立评价指标体系的原则和要求,结合前述的社会、经济、环境、行业、系统、网络等特征,以促进可持续发展为总目标,从社会、经济、环境、物流行业四个角度考虑,有选择性的选取了8个评价指标,建立了物流中心规划方案的评价体系,并应用层次分析法得出了各指标权重。另外,在分析比较传统方法存在指标体系与评价方法存在不相容等问题的基础上,根据可拓综合评价法的原理及特点,将其引入到物流中心规划方案评价的研究中,并通过廊坊物流中心规划方案评价进行了实证研究,取得了合理的评价结果。

Bioassay results revealed: compared with alcohol control, extracts at parameter 1, 4, 7 stimulated the absolute germination rate and potential, radicle growth, plumular axis growth, fresh weight, dry weight at different levels; extracts at parameter 2, 3 stimulated the all germination index except radicle growth and axis growth; extracts at parameter 6 stimulated all but radicle growth and fresh weight; extract at parameter 8 stimulated only the germination potential.

生物检测结果显示,与酒精对照相比:萃取参数1、4和7等条件苦楝叶提取物对杉木种子绝对发芽率、绝对发芽势、胚根长、胚轴长、鲜重和干重等发芽指标均表现出不同程度的促进作用,萃取参数2和3等条件苦楝叶提取对除胚根和胚轴外的各发芽指标起促进作用,萃取参数5条件苦楝叶提取物对除鲜重和干重外的各发芽指标起促进作用,萃取参数6条件苦楝叶提取物对除胚根和鲜重外的各发芽指标起促进作用,而萃取参数8条件苦楝叶提取物仅对绝对发芽势起促进作用。

According to the principles of synthesis, dominance, regionality and relative consistency, the environment degradation evaluation system is divided into three classes: vulnerable region, vulnerable type and vulnerable cell. The research area belongs to the erosion degraded Southern Red Hilly Area region. Based on the conceptions and grading, the dissertation probes into the methodology of evaluation and case study, and establishes a potential degradation evaluation system which comprises altitude, gradient, soil erosion index K, annual rainfall, the proportion of rainfall in raining period, and the drought index of rainless period.

在脆弱性概念及其分类的基础上,本文进行了脆弱性评估的方法探讨和实证研究,在脆弱性分析的基础上,选择高度、坡度、土壤可蚀性K值、降雨量、暴雨量、多雨期降雨比重和少雨期干旱指数为潜在脆弱度指标;选取作为区域人地关系、社会经济发展与管理水平综合影响结果的人类活动指标森林覆盖率和坡耕地指数作为现实脆弱度评估的人为加速侵蚀的修正指标,计算生态环境的现实脆弱度,并将其指标体系与方法用于衡阳盆地生态环境脆弱度评估的实证研究。

Chapter 9 is conclusion and future prospect. There are five innovative findings in the paper. Firstly, the evolvement of extensions and connotations of two reengineering styles is analyzed based on their high risk, and finding their trends of amalgamation. With this, the concept of corporation reengineering is then redefined combining core competence theory and ideas of process change management, and decompounding it into two parts: pre-reengineering and post-reengineering. Its inner relationships are analyzed and explained by economics theory. Secondly, establishing a analysis framework of reengineering risks, risk factors of foreign BPR are analyzed and concluded systematically for the first time. Reengineering risks are divided into three parts: plan, design and executive based on process and project management, then risk factors system is abstracted. Thirdly, 72 reengineering corporations in Jiangsu province are investigated on risk condition. Furthermore, risk factors in every part are analyzed and reduced experimentally by factor analysis method, and a risk factors system to suit Chinese corporation's reengineering is established. Fourthly, setting up a choice model of reengineering projects, the objective optimization model is presented to ascertain the weigh of each factor, a method of sequencing reengineering projects is presented so that risk of each reengineering project can be evaluated and compared effectively. Fifthly, an integration relationship model among IT, BPR and strategy is established aiming at productivity paradox derivative from IT and its dual effects on BPR, IT investment priorities in BPR is narrated deeply.

本论文的创新点体现在五个方面:1)基于上述两种重组方式的高风险性,对它们的外延和内涵演变进行了分析,发现它们日益融合的趋势;然后结合核心能力理论和流程变革管理的思想对企业重组的概念进行了界定,将其分为&前重组&和&后重组&两部分,并对其内部关系进行了详细分析,同时应用经济学理论对其进行了解释。2)建立了重组风险的分析框架,并首次较为全面地分析和归纳了国外企业重组的风险因素,根据重组的过程和步骤以及项目管理的观点,将重组风险划分为计划、设计和执行3个部分,并在此基础上提炼出企业重组的风险指标体系。3)运用现场访谈、问卷调查的方法,调查了江苏省72家企业重组的风险情况,然后利用因子分析法对每一部分的每一风险因素进行实证分析,对风险指标进行了约减,建立了比较完善的适合我国企业的重组风险指标体系。4)建立了重组变革方案的选择模型,然后针对不同的重组方案提出了确定指标权重的目标优化模型,并基于三角模糊数之间两两比较的可能度概念,提出了一种重组方案排序法,从而可以有效地对各种变革方案的风险进行评估和比较。5)针对信息技术所造成的&生产率悖论&现象及其对重组的双重影响,建立了信息技术、企业重组和企业战略之间的整合关系模型,并对重组中信息技术投资的优先权问题进行了深入的阐述。

The twenty pumpkin varieties were degusted with point system for organoleptic evaluation, results showed that Jingyinli pumpkin was the best taste and most of pumpkin varieties had good sensory qualities.

所选的六个(甜度、风味、质地、颜色、水分、综合)与感官评价有关的指标中,除&颜色&与其他指标没有相关外,&水分&与其他指标呈负相关,&甜度&、&质地&、&综合&三指标相互呈正相关。

Firstly, the writer classifies the investment structure and delimitates the research scope of investment structure in this chapter.

本章首先探讨了投资效率的价值标准,并对传统的投资效率评价体系进行了评折;其次在此基础上通过调查问卷的形式,对美国和我国企业的投资效率评价指标体系进行比较,发现我国企业在投资效率评价指标体系的选择过程中,存在着诸多的不理性,回收期指标的高频率使用,折现指标的倍受冷落应该是比较贴切的概括;再次,针对我国现状,构建了理性的投资效率评价体系。

On this foundation, establish the index system of adaptability appraisement, which concludes subsystem of road construction and economy development, and filtrates the indexes by the method of weight judging, and discusses the definite method of the standard value of evaluation indexes.

在此基础上,构建了由公路子系统和经济子系统指标组成的公路建设与经济发展适应性评价指标体系,然后运用权数判断法进行指标筛选,并且探讨了评价指标标准值确定的方法。

Meanwhile, the previous experience of their cooperation is also a very important criterion as hypothesized in the model.

同时,&以往合作经历&指标也被列为非常重要的核心指标之列,验证了本文原假设指标体系中对此指标的假设。

Moreover, take GT company's Procurement Performance Evaluation target for example, based on it's existing problems and principles, to propose suggestions of improvement which should avoid irrationalities occur, further more, take the advantage of advanced technology to promote the index system when it comes to Procurement Performance Evaluation. It is to guarantee all the works can be on the rails.

然后本文以GT公司采购绩效评估指标为例,根据该企业现有采购绩效评估指标存在的诸多问题以及建立一般采购绩效评估指标体系应遵循的原则,提出改进建议,以避免企业在采购绩效评估时出现不合理现象,并利用先进的科学技术来提升采购绩效评估指标体系,保证企业各项工作的正常进行。

第12/100页 首页 < ... 8 9 10 11 12 13 14 15 16 ... > 尾页
推荐网络例句

I can not make it blossom and suits me

我不能让树为我开花

When temperatures are above approximately 80 °C discolouration of the raceways or rolling elements is a frequent feature.

当温度高于 80 °C 左右时,滚道或滚动元件褪色是很常见的特征。

The lawyer's case blew up because he had no proof.

律师的辩护失败,因为他没有证据。