拖欠
- 与 拖欠 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The construction enterprises of all completed construction projects to be itemized and in the investigation of the existence of peasant workers wages owed projects to be closed immediately; At the same time we must establish internal labor workers in the enterprise dedicated reserve system as contingency funds, devoted to the settlement of arrears of wages and the workers have unexpected events.
各建筑业企业对所有已竣工和在建工程要进行逐项排查,对存在拖欠农民工工资的工程项目,要立即予以结清;同时要在企业内部建立劳务用工专用储备金制度,作为应急资金,专门用于解决因拖欠民工工资而产生的突发事件。
-
Regions actively introduce policies to guide the reform and development of the construction industry, construction enterprises modern property rights system reform in full swing; Industry and enterprise restructuring has made remarkable progress, constantly improve industrial concentration; Construction management and the rapid increase of technological innovation, market competitiveness gradually improved; outstanding works of the main line to clear rectifying and standardizing the market mechanism has taken shape, the market order and safety engineering quality, especially construction safety situation has further improved.
各地区积极出台有关政策引导建筑业改革发展,建筑业企业现代产权制度改革全面展开;行业和企业结构调整取得明显进展,产业集中度不断提高;建筑业企业管理和技术创新能力快速增强,市场竞争力逐步提高;以清理拖欠工程款为主线的市场整顿规范机制基本形成,市场秩序和工程质量安全,特别是建筑安全生产形势进一步好转;清理拖欠工程款和农民工工资问题取得初步成果。
-
Responsibilities in the project of building competence, in the spirit of those who are directly responsible for construction management, who is responsible for putting the principles of the work have been concerned with real estate development enterprises and construction projects related to the owners of "real estate projects, a list of outstanding works","Other construction projects, a list of outstanding works" issued, please acceptance of the completed project and the clearing of arrears to be paid by year the proportion of the development plan for the project, and acceptance of completed projects in unliquidated October 30, 2004 to complete clearing.
按照项目建设责任权限,本着谁直接负责工程建设管理,谁负责组织清欠工作的原则,已将与房地产开发企业和各有关建设项目业主有关的《房地产建设项目拖欠工程款一览表》、《其他建设项目拖欠工程款一览表》下发,请对已竣工验收结算的工程与被拖欠方按年度比例制定偿清拖欠工程款计划,对已竣工验收未。。。。。。
-
In light of Principal-Agent Theory, the dissertation explores the "institution guarantee-government reguarantee " mode under Federal Family Education Loan Program and the Indonesian mode of "institution administration-mixed guarantee", analyzes the essential factors affecting the success of case programs and proposes the core contents of GSSL "higher education institutions-government guarantee" mechanism, which are: By referring to the GSSL coverage, loan amount and default rate in various higher education institutions, the government decides the proportion of taking default loan and shares with the institutions the collected default so as to motivate them to manage the GSSL in accordance with its goal of financial aid.
本文运用委托—代理理论,剖析美国联邦家庭教育贷款&机构担保—政府再担保&模式和印度尼西亚助学贷款&高校管理—混合担保&模式,分析案例项目成败的关键因素,提出了国家助学贷款&高校—政府担保&机制的核心内容:政府根据不同高校国家助学贷款的人数获贷率、金额满足度和拖欠率,来确定分担拖欠贷款的比例,并与高校分享追讨回来的拖欠贷款,以此激励高校按照政府的资助目标努力管理国家助学贷款。
-
By providing them with timely information, the service helps the student borrowers understand the articles of loan contract, settles the specific problems that they confront in the course of repayment and increases repayment rate; conversely, by providing bank with information about student borrower, the service alters the approach to and cost of collecting, increases the bank\'s availability of collecting defaulted loan and thus reduces default and credit stinting.
它通过向借款学生提供及时有效的信息,帮助借款学生理解贷款合同条款,解决学生在还款过程中遇到的具体问题,提高还款率;通过向银行提供有关借款学生的信息,改变银行的追讨方式和成本,进而增加银行追讨拖欠贷款的可行性,降低拖欠和惜贷。
-
To solve thenon-payments problems in Chinese construction market, this paper gives aninvestigation on theory of Construction Contract Bond and analysis on characters ofthe Construction Contract Bond Syste
本文从我国建筑市场上存在的工程款拖欠和民工工资拖欠的现状及其产生原因分析出发,提出业主支付保证担保制度是解决上述问题的有效途径。
-
If Buyer is in arrears on any invoice, Seller may, on notice to Buyer, apply the deposit thereto and withhold further delivery until the deposit and all arrearages are brought current.
如果买方是在拖欠的任何发票,卖方可能,就通知买方,适用于存款,并为进一步扣交付,直至存款和所有拖欠带来的电流。
-
When people continue to July 6 this year, real estate sales agents, Hefei, 16 Jan Taoyuan Company Limited carrying more than 4,000 million customers feel lingering fear of the night evaporation incident, on October 24 and burst Beijing home real estate brokerage company changed owners rent arrears million cases escape incident previously was changed intermediary home owners rent arrears million in the last half a month of time, every day hundreds of clients find homes intermediary recover arrears of rent allowance, a time much Mancheng rain.
当人们仍对今年7月6日合肥市桃园房地产销售代理有限公司携公司客户4000多万元一夜蒸发事件心存余悸之时,10月24日又爆出北京佰家房地产经纪公司拖欠万名业主租金携款逃跑事件,原由是佰家中介拖欠万名房主租金,在近半个月时间里,每天都有上百名客户找到佰家中介追讨拖欠的租金,一时间闹得满城风雨。
-
Few days ago, three reporters from the Shenzhen Municipal People's Congress Standing Committee was informed that the thirty-third meeting,"to pay staff salaries in Shenzhen City Ordinance" through the consideration of, the employing units in arrears, if for no reason, wages and salaries, the maximum will be punished by 5 million fine, some arrears will also pay an additional 25% of economic compensation.
几天前,三名记者从深圳市人民代表大会常务委员会获悉,第三十三次会议上,&工作人员的工资支付深圳市条例&通过审议,用人单位拖欠,如果没有任何理由,工资和薪金,最高将被处以5万美元罚款,一些拖欠还将额外支付25 %的经济补偿。
-
Where peasant workers wages owed construction companies, as the seriousness of giving informed criticism, or lower quality grade quality and inadmissible, such as approval of the increase, stop bidding, the cancellation of qualification certificates punishment; Responsibility for the arrears related project manager, depending on the seriousness of giving informed criticism, restricting eligibility criteria, driving qualifications punishment.
凡拖欠农民工工资的建筑业企业,视情节轻重给予通报批评,降低资质等级或不予受理资质升级、增项等审批,停止招投标、吊销资质证书的处罚;对拖欠相关责任项目经理,视情节轻重给予通报批评、限制投标资格、吊扣资格证书的处罚。
- 推荐网络例句
-
Fancy gold-plated dangling earrings with facetted White Opal crystals.
花式镀金悬垂耳环与facetted白欧泊水晶。
-
This essay chooses the study aim from biology teachers in middle school in Shi Jiazhuang which tells us that most of the middle school biology teachers in Shi Jiazhuang have the"burnout", lower successfulness, individualize.
本文选取石家庄市初中生物教师作为研究对象,运用问卷调查的方法对石家庄市初中生物教师职业倦怠的现状进行调查,调查结果发现,石家庄市初中生物教师这一群体普遍存在职业倦怠,情感枯竭程度偏高,成就感偏低,去个性化程度最为严重。
-
In measurements of a day,generallyspeaking,the photosynthesis of birch in mesophytic habitat is better than that in xerophytichabitat(peak values are 12.8,10.33μmolCO2m-2s-1 respectively);that of sexual birch inmesophytic habitat is better than that of clone birch(peak values are 9.87,6.71μmolCO2m-2s-1respectively);that of young tree is better than that of seedling(peak values are12.37,10.05μmolCO2m-2s-1 respectively).
在一天中的各个时刻,总体说来,中生生境生长的白桦光合作用超过旱生生境生长的白桦光合作用(净光合速率峰值分别为12.8、10.33μmolCO2m-2s-1);白桦幼树的光合作用超过白桦幼苗(净光合速率峰值分别为12.37、10.05μmolCO2m-2s-1);中生生境有性白桦的光合作用超过无性白桦的光合作用(净光合速率峰值分别为9.87μmolCO2m-2s-1、6.71μmolCO2m-2s-1)。