英语人>网络例句>拆除 相关的搜索结果
网络例句

拆除

与 拆除 相关的网络例句 [注:此内容来源于网络,仅供参考]

Demolishing methods of directional collapsing chemney and water tower aredescribed, the manul demolishing, mechnical demolishing and blast demolishing methods and their specifications are presented.

本文描述了烟囱水塔定向拆除的人工拆作法、机械拆除法和爆破法的施工注意事项。

The investigation of a reservoir was done for the first time in China. The results show that construction and removal of dams are complicated, and that the studies on the ecological environment impact due to decommissioning and removal of dams are of great significance.

结果表明,水库大坝的兴建与退役拆除均是复杂的系统工程,水库大坝退役拆除及对生态环境影响研究具有重要的意义,我国在这方面刚刚起步。

Experts believe that demolishing old buildings and building new, and the demolition of the implementation of monetary policy on the real estate market in Nanning has a direct and far-reaching impact.

专家认为,拆除旧建筑和建设新,并拆除执行货币政策对房地产市场在南宁有着直接和深远的影响。

The construction plan of double-joined arch is validated using numerical simulation when dilapidating segments to construct single connecting tunnel between two shield-driven tunnels in this paper.

应用数值模拟方法研究了在盾构法修建隧道的基础上拆除管片修建渡线隧道中双联拱段方案的可行性,研究表明双联拱方案是可行的;另外,拆除管片并开挖时、施做中墙时均会引起地面较大的沉降,施工完毕后会在双联拱右部与原盾构隧道之间产生塑性区,为此提出了施工建议。

While maintaining to dismantle to unload, the card Western Europe compares the YAMAHA , dismantles easily.

当维持拆除卸货的时候,欧洲比较山叶的卡片西方人,容易地拆除

Rational blasting parameters, full pre-demolish, rational blasting circuit were adopted in the engineering and a series of integrated control measures for damage from blasting were taken to ensure blasting safety and environmental protection.

通过选取合理的爆破参数,并以充分的预拆除配合,采取合理的爆破网路,安全、快速地完成了该水泥厂整体爆破拆除。同时,采取了一系列爆破危害综合控制措施,确保了爆破安全和环保作业。

TQ series' rising a liquid to press system with the crest from the rise type tower derrick is my factoty and construction department, Chen2 Yang2 building machine graduate school,consociation develpment of product,used of from go up or tore down(namely increment or tore down the tower body basic stanza)of the liquid press motive system.

TQ系列自升式塔式起重机用顶升液压系统是我厂与建设部,沈阳建筑机械研究所联合开发的产品,用于自升塔机塔身升高或拆除(即增加工拆除塔身基本节)的液压动力系统。

Has not been submitted to CH2MHILL Safety Department for review and approval prior to commence work, such as: Foundation Excavation Safety Plan, Scaffolding building and dismantlement safety plan, Piling Safe Work Plan, Crane Operation and lifting Safety Plan, Tower Crane Safety Operation Plan, Fall Prevention Plan, Site Waste Management Plan, Site Fire Prevention Plan, Formwork building and dismantlement safety plan, Emergency Response Plan, etc

比如:基坑开挖安全方案,脚手架搭设和拆除安全方案,打桩安全方案,吊车操作及起重安全方案,塔吊安全操作方案,防坠落预防安全方案,现场废物管理方案,现场火灾预防方案,模板搭设及拆除安全方案,现场紧急反应方案等。

The main contents and results of this paper are listed as follows:Based on the finite element analysis software ANSYS establish a bridge of three-dimensional mechanical model of CWR;Based on an actual project,calculate different conditions of three forms of bridge and research the reasonable removal scope of fastener;Research on the allowed lock temperature rail track construction of partial maintenance of range.By analyzing the result obtain the best way to replace the support of a bridge and the range of removal of the bearing and permission of rail temperature of construction.It supports some recommendations for the replacement of city construction maintenance.

本文主要研究内容为:基于有限元分析软件ANSYS建立了桥上无缝线路三维力学模型;依据某实际工程,分析计算了三种桥梁形式在不同顶升工况下的钢轨和扣件受力,研究了扣件的合理拆除范围;对维修后局部钢轨施工锁定轨温的允许范围进行了研究;分析得出了城轨桥梁更换支座施工的最佳顶升方式、扣件拆除范围和允许施工轨温,为城轨桥梁更换支座的施工维修提出了一些建议。

2 Removal of 39.1 Improper Work, Materials or Plant The Engineer shall have authority to issue instructions from time to time, for: the removal from the Site, within such time or times as may be specified in the instruction, of any materials or Plant which, in the opinion of the Engineer, are not in accordance with the Contract, the substitution of proper and suitable materials or Plant, and the removal and proper re-execution, notwithstanding any previous test thereof of interim payment therefore, of any work which, in respect of materials, Plant or workmanship, or design by the Contractor or for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.

工程师有权随时发出指令:在指令规定的时间内一次或分几次从现场运走工程师认为不符合合同规定的任何 34 不合格工 39.1 程,材料或设备的拆除和运走材料或设备;用适用合格的材料或设备取代原来的材料或设备;对尽管先前已进行过检验或中间支付,但工程师认为材料,设备或施工工艺,或由承包人本身进行的或由其负责设计的不符合合同规定的工程拆除并重新施工。

第3/64页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

I can not make it blossom and suits me

我不能让树为我开花

When temperatures are above approximately 80 °C discolouration of the raceways or rolling elements is a frequent feature.

当温度高于 80 °C 左右时,滚道或滚动元件褪色是很常见的特征。

The lawyer's case blew up because he had no proof.

律师的辩护失败,因为他没有证据。