英语人>网络例句>抬 相关的搜索结果
网络例句

与 抬 相关的网络例句 [注:此内容来源于网络,仅供参考]

He sprang to his feet and began pacing, stepping nimbly over the oddments scattered about the floor.

起脚,在地上走来走去,步履轻快地迈过地上那些乱七八糟的东西。

He looked up and nodded to me.

起头来,对我点了点头。

Little red-cap raised her eyes, and when she saw the sunbeams dancing here and there through the trees, and pretty flowers growing everywhere, she thought, suppose I take grandmother a fresh nosegay. That would please her too.

小红帽起头来,看到阳光在树木间来回跳荡,美丽的鲜花在四周开放,便想:也许我该摘一把鲜花给奶奶,让她高兴高兴。

As he was carried o'er the green.

当他的身躯过绿茵。

He looked down, and then glanced up at me through his long black lashes, his ocher eyes scorching.

他垂下头,然后起眼,透过他又长又黑的睫毛盯着我。

ORIGINAL SIGNED COMMERCIAL INVOICE NOT EXCEEDING THIS CREDIT AMOUNT PREPARED IN THE NAME FO OPENERS IN OCTUPLICATE.

正本、签章的商业发票一式十份,以开证人为头人,发票金额不超过信用证金额。

He had some cute little phrase there about an odalisque… what the hell's an odalisque anyway?

说下去……""接着-"说到这儿范诺登自己也笑起来,"接着,听仔细了,他告诉我她如何起腿坐在椅子上……一丝不挂……他坐在地板上头望着她,对她说她是多么漂亮……他对你说过她长得像马蒂斯的一个人物吗?

Ogee spillway tunnel s are widely used in middle or high head water conservancy and hydropower projects.

头式泄洪洞在中、高水头的水利水电工程中应用十分普遍,其突出的水力学问题是反弧段的空蚀破坏,反弧段空蚀破坏的部位常见于反弧末端、反弧段下游底板和反弧段下游侧墙。

Its main problem in projects is cavitation damage of ogee section, which can be frequently found in the end, downstream baseboard and downstream sidewall s of ogee section.

头式泄洪洞在中、高水头的水利水电工程中应用十分普遍,其突出的水力学问题是反弧段的空蚀破坏,反弧段空蚀破坏的部位常见于反弧末端、反弧段下游底板和反弧段下游侧墙。

Man: Oh shoot, we've taken the wrong one.

男人:哦,糟了。我们错了。

第55/100页 首页 < ... 51 52 53 54 55 56 57 58 59 ... > 尾页
推荐网络例句

I can not make it blossom and suits me

我不能让树为我开花

When temperatures are above approximately 80 °C discolouration of the raceways or rolling elements is a frequent feature.

当温度高于 80 °C 左右时,滚道或滚动元件褪色是很常见的特征。

The lawyer's case blew up because he had no proof.

律师的辩护失败,因为他没有证据。