承担费用
- 与 承担费用 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Article 55 An entity that discharges hazardous wastes shall dispose hazardous wastes according to relevant provisions of the State, and shall not dump or pile up them without approval; those that don't treat hazardous wastes shall be ordered to get right within the time limit by the environmental protection administrative departments of the people's governments at or above the county level; if an entity fails to treat within the time limit or in accordance with relevant provisions of the State, another entity shall be commissioned to carry out the treatment by the environmental protection administrative departments of the people's governments at or above the county level, and the expenses incurred therefrom shall be undertaken by the entity that discharges hazardous wastes.
第五十五条产生危险废物的单位,必须按照国家有关规定处置危险废物,不得擅自倾倒、堆放;不处置的,由所在地县级以上地方人民政府环境保护行政主管部门责令限期改正;逾期不处置或者处置不符合国家有关规定的,由所在地县级以上地方人民政府环境保护行政主管部门指定单位按照国家有关规定代为处置,处置费用由产生危险废物的单位承担。
-
Considering that mining operation will be done by NALCO itself, the capital cost for this project has been estimated at Rs 307 crores.
他表示,矿区经营将由国家铝业公司独力承担,该项目的资金费用预计为30.7亿卢比。
-
Delivered Ex-Quay – The seller is responsible for all costs involved in transporting the goods to the wharf at the port of destination.
目的港码头交货-卖方在指定的目的港码头将货物交给买方。卖方承担将货物运至指定的目的港并卸至码头的一切风险和费用。
-
The following factors, among others, could cause actual results and future events to differ materially from those set forth or contemplated in the forward-looking statements: defaults on or non-renewal of leases by tenants or renewal at lower-than-expected rent or failure to lease at all or on favorable terms, decreases in real estate values and impairment losses, increased interest rates and operating costs or greater-than-expected capital expenditures, our failure to obtain, renew or extend necessary financing, re-financing risks, risks related to our obligations in the event of certain defaults under co-investment ventures and other debt, risks related to debt and equity security financings, difficulties in identifying properties to acquire and in effecting acquisitions, our failure to successfully integrate acquired properties and operations, our failure to divest properties we have contracted to sell or to timely reinvest proceeds from any divestitures, our failure to contribute properties to our co-investment ventures, risks and uncertainties affecting property development, value-added conversions, redevelopment and construction (including construction delays, cost overruns, our inability to obtain necessary permits and public opposition to these activities), our failure to qualify and maintain our status as a real estate investment trust, risks related to our tax structuring, failure to maintain our current credit agency ratings or to comply with our debt covenants, environmental uncertainties, risks related to natural disasters, financial market fluctuations, changes in general economic conditions, global trade or in the real estate sector, inflation risks, changes in real estate and zoning laws, a continued or prolonged downturn in the U.S., California or global economy, risks related to doing business internationally and global expansion, risks of opening offices globally, risks of changing personnel and roles, losses in excess of our insurance coverage, unknown liabilities acquired in connection with acquired properties or otherwise and increases in real property tax rates.
以下因素可能会导致实际结果和未来事件与前瞻性陈述产生重大出入:承租人拖欠租金或者不续租;利率以及经营成本的提高;我们未能获得必要的外部融资;再融资的风险;与合资项目和其它债务发生特定违约时我方承担的义务有关的风险;与债务和股权融资有关的风险;确定拟收购的物业以及完成收购过程中遇到的困难;我们未能成功整合收购的物业和业务;我们未能剥离已经签约出售的物业或未能及时将剥离带来的收益再投资;影响物业开发和建设的风险和不确定性(包括建设延期、费用超支、我们无法获得项目建设所需的必要批准以及公众对项目开发建设的反对等);我们无法获得或者维持作为房地产投资信托公司的资质;与我们的税收策划有关的风险;无法保持我们目前的信用评级;环保方面的不确定性;与自然灾害有关的风险;金融市场的波动;整体经济状况或者房地产业的变化;房地产和城市规划法律的调整;美国、加利福尼亚州或者全球经济的衰退;与开展国际业务和全球扩张有关的风险;保险范围之外的损失;与被收购的物业有关的或者其它未知责任以及房地产税率的提高等。我们的成功还依赖于总体经济走向,包括利率、所得税法、政府监管、立法、人口总数变化以及我们在10-K表中作的截至2009年12月31日的季度报告中&风险因素&和其它标题项下阐述的其它问题。
-
Other part of the route in Kazakhstan we usually pay for ourselves because we have our own Rail Way Code of Expeditor in Kazakhstanan.
哈萨克斯坦内的运输费用我们自己承担,因为在哈萨克斯坦我们有自己的RAIL WAY编号。
-
The seller has to bear all the costs and fisks involved in bringing the goods to the named port of destination before discharging.
卖方必须承担货物运至指定的目的港卸货前的一切风险和费用。
-
Payment of Freight and charges to any freight forwarder or broker, or anyone other than the Carrier or its authorized agent, shall not be considered payment to the Carrier and shall be made at the Merchant's sole risk.
向货运代理人或经纪人或任何除了承运人或其授权代理人以外的人支付的运费及费用,不得被认为系向承运人支付,而应是在货方独自承担风险之下支付。
-
A shunt reactor is an inductor that is connected line to ground.
与生产线安装有关的一切费用都由买方承担。
-
IN THE EVENT THAT THIS CREDIT EXPIRED UNUTILIZED NO CHAGRES WILL BE PAID BY US ARTICLE (18/C) OF UCP 500 IS NOT APPLICABLE HERE.
如果受益人提出确认L/C而导致的信用证过期,我方不承担任何费用。UCP500条款(18/C)在这里不适用。
-
If L/C should expire unutilized at advising bank's or through bank's counters any charges for nonutilization to be borne by beneficiary.
如果信用证在通知行或其它转通知的银行处过效期,过期费用由受益人承担。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力