承包商
- 与 承包商 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
18 "Contract Price" means the sum stated in the Letter of Acceptance as payable to the Contractor for the execution and completion of the Works and the remedying of any defects therein accordance with the provisions of the Contract.
1.18 合同价格是指中标函中写明的按照合同规定,为了工程的实施、完成及其任何缺陷的修补应付给承包商的金额。
-
"Contract Price"" means the sum stated in the Letter of Acceptance as payable to the Contractor for the execution and completion of the Works and the remedying of any defect s therein accordance with the provisions of the Contract."
合同价格是指中标函中写明的按照合同规定,为了工程的实施、完成及其任何缺陷的修补应付给承包商的金额。
-
I "Contract Price" means the sum stated in the Letter of Acceptance as payable to the Contractor for the execution and completion of the Works and the remedying of any defects therein accordance with the provisions of the Contract.
合同价格是指中标函中写明的按照合同规定,为了工程的实施、完成及其任何缺陷的修补应付给承包商的金额。
-
In a three-class construction supply chain which is composed by the raw material suppliers, the semi-manufactured goods suppliers and the contractors, there exist project scheduling problems related with the semi-manufactured goods suppliers and the contractors, so do raw material ordering problems which is related with the raw material suppliers and the semi-manufactured goods suppliers.
在一个组织结构确定的由原材料供应商-半成品供应商-承包商构成的三层工程供应链网络中,在半成品供应商和承包商之间存在工程调度的问题,在原材料供应商与半成品供应商之间存在原材料订货的问题。
-
This text analysis and summaries the general right and obligation of the contractors under the FIDIC (1999, New Red Skin Book) conditions of contract, and expatiates that the necessity and the importance that the contractors want to adapt to the environmental the competition of the market must be to acquaint with the FIDIC conditions of contract.
通过对1999年版国际咨询工程师联合会施工合同条件下承包商的一般权利和义务的分析与总结,阐述了承包商要适应市场竞争环境就必须熟悉并掌握FIDIC合同条件的必要性和重要性。
-
The checking of any setting-out or of any line or level by the Engineer shall not in any way relieve the Contractor of his responsibility for the accuracy thereof and the Contractor shall carefully protect and preserve all bench-marks, sight-rails, pegs and other things used in setting-out the Works.
工程师对任开工准备或何放线工作或任何基准或标高的检查均不能在任何方面解除承包商对上述各项的精度所负的责任,承包商应仔细保护的保留好一切水准点、视准轨、测桩和工程放线所用的其它物件。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points lines and levels of reference given by the Engineer in writing and for the correctness subject as above mentioned of the position levels dimensions and alignment of all parts of the Works and for the provision of all necessary instruments appliances and labor in connection therewith.
承包人负责根据工程师的书面指示准确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsiblefor the true and proper setting-out of the Works in relation tooriginal points, lines and levels of reference given by theEngineer in writing and for the correctness, subject as abovementioned, of the position, levels, dimensions and alignment of allparts of the Works and for the provision of all necessaryinstruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
They are investigating the road builder for they think he and the contractor had made a dirty deal that contractor bribed him to get the contract of building city roads and bridges.
他们正在调查负责修建道路的那个人。他们认为他和承包商达成了不可告人的交易;承包商私下贿赂他,以得到修建城市道路和桥梁的合约。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。