承包商
- 与 承包商 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the event of any repeat of a performance test failing for reaso imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in A endix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
-
In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue retesting, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.
如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。
-
We prove it available.2 As government project owner, there exist shortcomings including separate management and inexplicit project owner, so we try to bring forward some innovations about government project owner.
具体内容如下:先对业主与承包商构成的二元制下的激励问题进行分析,后引入项目管理公司,并赋予其作为第三方对承包商的行为实行监督,并对所形成的三元制下的激励问题进行分析。
-
4 The Engineer may be any interim certificate make any correction or modification in any previous certificate which shall have been issued by him and shall have authority, if any work is not being carried out to his satisfaction, to omit or reduce the value of such work in any interim certificate.
92.7 在提交最终报表时,承包商应给雇主一份书面结算清单,进一步证实最终报表中的总额,相当于由合同引起的或与合同有关的全部和最后确定应支付给承包商的所有金额,并将一份副本呈交工程师。
-
The Engineer shall, within 28 days after receiving a Statement and supporting documents, issue to the Employer an Interim Payment Certificate which shall state the amount which the Engineer fairly determines to be due, with supporting particulars.
此后,在收到承包商的报表和证明文件后28天内,工程师应向雇主签发期中支付证书,列出他认为应支付承包商的金额,并提交详细证明资料。
-
Thereafter, the Engineer shall, within 28 days after receiving a Statement and supporting document s, issue to the Employer an Interim Payment Certificate which shall state the amount which the Engineer fairly determines to be due, with supporting particulars.
此后,在收到承包商的报表和证明文件后28天内,工程师应向雇主签发期中支付证书,列出他认为应支付承包商的金额,并提交详细证明资料。
-
Thereafter, the Engineer shall, within 28 days after receiving a Statement and supporting documents, issue to the Employer an Interim Payment Certificate which shall state the amount which the Engineer fairly determines to be due, with supporting particulars.
此后,在收到承包商的报表和证明文件后28天内,工程师应向雇主签发期中支付证书,列出他认为应支付承包商的金额,并提交详细证明资料。
-
B Upon the confirmation by the Project Manager in writing of the achievement of practical completion of the Trade Works, the Project Manager shall subject to the Trade Contractor's compliance with clause 2(8), issue an Interim Certificate for fifty per cent (50%) of the total amounts then so retained and the Trade Contractor shall be entitled to payment of the said retention release within the Period for Honouring Certificates named in Schedule 1 hereto.
b在项目经理书面确认工程取得实质性完工时,项目经理应该根据专业承包商对条款2.8的遵守,发出50%保留款项的临时付款证明,因此专业承包商有权在附表1所示的批准付款证书期间取得该保留款项。
-
G The contractor shall arrange for the presence of the vendor's and the licenser's representatives at the site to assist the contractor's personnel, wherever necessary.
g 承包商必要时应安排供货商和技术许可商的代表到现场协助承包商的人员。
-
Millwork contractor to provide cutouts and co-ordinate with General contractor.
提供保险开关和协调的磨光工作承包商与一般承包商。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。