英语人>网络例句>承包人 相关的搜索结果
网络例句

承包人

与 承包人 相关的网络例句 [注:此内容来源于网络,仅供参考]

Therefore,during the calcu-lation,the owners,supervisor and contractors and other parties should conduct friendly consultations,in particular,the contractors should communicate with the owners actively,make serious analysis according to the fees accrued in the period of the treatment of karsts cave,so that the calculation of the cost will be much more correct and reasonable,owners and construction enterprises will achieve a win-win situation.

故在计算时,业主、监理及承包人等各方应进行友好协商,尤其是承包方更应积极与业主进行沟通,根据在溶洞处理期间发生的各种费用认真进行分析,使费用的计算更加正确与合理,使业主与施工单位达到双赢。

For monitoring services in the China airspace, operators should contact the MAAR monitoring contractor

运营人可按下面的地址与MAAR监控承包人联系,询问中国地区的监控服务

Any cost due to power and water pull-through for construction is undertaken by contractor.

由接入点到施工点施工用电、用水敷设有关费用由承包人负责。

2 Removal of 39.1 Improper Work, Materials or Plant The Engineer shall have authority to issue instructions from time to time, for: the removal from the Site, within such time or times as may be specified in the instruction, of any materials or Plant which, in the opinion of the Engineer, are not in accordance with the Contract, the substitution of proper and suitable materials or Plant, and the removal and proper re-execution, notwithstanding any previous test thereof of interim payment therefore, of any work which, in respect of materials, Plant or workmanship, or design by the Contractor or for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.

工程师有权随时发出指令:在指令规定的时间内一次或分几次从现场运走工程师认为不符合合同规定的任何 34 不合格工 39.1 程,材料或设备的拆除和运走材料或设备;用适用合格的材料或设备取代原来的材料或设备;对尽管先前已进行过检验或中间支付,但工程师认为材料,设备或施工工艺,或由承包人本身进行的或由其负责设计的不符合合同规定的工程拆除并重新施工。

The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.

承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。

The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts ofthe Works and for the provision of all necessary instruments, appliances and labor in connection therewith.

承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。

The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.

承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。

The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points lines and levels of reference given by the Engineer in writing and for the correctness subject as above mentioned of the position levels dimensions and alignment of all parts of the Works and for the provision of all necessary instruments appliances and labor in connection therewith.

承包人负责根据工程师的书面指示准确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。

The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.

承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。

The Contractor shall be responsiblefor the true and proper setting-out of the Works in relation tooriginal points, lines and levels of reference given by theEngineer in writing and for the correctness, subject as abovementioned, of the position, levels, dimensions and alignment of allparts of the Works and for the provision of all necessaryinstruments, appliances and labor in connection therewith.

承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。

第9/10页 首页 < ... 2 3 4 5 6 7 8 9 10 > 尾页
推荐网络例句

Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.

最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。

Only person height weeds and the fierce looks stone idles were there.

只有半人深的荒草和龇牙咧嘴的神像。

This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.

这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。