承包人
- 与 承包人 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Our country "Law of contract" 286th stipulates the contractor but to enjoy on the project funds creditor's rights to the project first receives recompenses the power, But its nature not explicit limits, the scholar has the different viewpoint regarding this, the article thought the architectural engineering first receives recompenses the power is the legal mortgage.
我国《合同法》第286条规定承包人就工程款债权而对工程享有优先受偿权,但其性质没有明确的界定,对此学者有不同的观点,本文认为建筑工程优先受偿权系优先权。
-
May pick the pre- registration system in the concrete registration system design by to safeguard the contractor first to receive recompenses the power the potency, and the stipulation hindrance first receives recompenses the power realization or harmfully in first receives recompenses the power the punishment behavior for to be invalid.
在具体登记制度的设计上可采预登记制度以保障承包人优先受偿权的效力,并且规定妨碍优先受偿权实现或者有害于优先受偿权的处分行为均为无效。
-
The Contractor shall dispatch relevant management personnel in the site of subcontracting to ensure the performance of this Contract.
承包人应在分包场地派驻相应管理人员,保证本合同的履行。
-
3 The subcontracts of the Project will not release the Contractor from any obligations or liabilities.
工程分包不能解除承包人任何责任与义务。
-
The relationship of the Parties is that of independent contractors.
聚会的之间的关系是独立于的承包人的那个。
-
C部分原文是:"or if on default by the Contractor the Guarantor shall satisfy and discharge the damages sustained by the Employer thereby up to the amount of the above-written Guarantee then this obligation shall be null and void but otherwise shall be and remain in full force and effect ",这部分以or if
引出另一种可能性,如果承包人不执行所规定的条款如何?则保证人应负有赔偿业主损失的责任。原文在阐述这一层意思时,既简明又严密。
-
C部分原文是: or if on default by the Contractor the Guarantor shall satisfy and discharge the damages sus-tained by the Employer up to the amount of the above-written Guarantee then this obligationshall be null and void but otherwise shall be and remain in full force and effect C部分以.r if
引出另一种可能性,如果承包人不执行所规定的条款如何?则保证人应负有赔偿业主损失的责任。原文在阐述这一层意思时既简明又严密。
-
Then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
承包人在运送货物前应通知工程师或其代表有关货物的重量及其他特殊事项,还要告知他打算采取的保护,加固方法。
-
Wenzhou businessmen in Shanxi coal mine contractor in the basic production capacity below 90,000 tons, Wenzhou People have control of Shanxi Coal 1 / 5 production.
温州商人在山西煤矿承包人的基本生产能力低于九点零零零万吨,温州人已控制山西煤炭1 / 5的生产。
-
I maintain commercial general liability insurance including products and completed operations, bodily injury and property damage liability, innkeepers' liability, contractual liability, independent contractors'liability and personal and advertising injury liability against claims occurring on, in, or about the Property, or any elevator or escalator therein, and on, in, or about the adjoining streets and passageways thereof, or otherwise, arising under this Agreement
购买商业综合责任保险,该综合责任险投保的风险包括就在物业或物业内的任何电梯或电动扶梯之上、之内或周围以及在物业的邻接街道和过道之上、之内或周围发生的或因其他原因而在本协议项下发生的各权利主张,该等权利主张指与产品和完工责任、人身伤害和财产损失责任、酒店业主责任、合同责任、独立承包人责任以及人身和广告损害责任有关的权利主张
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。