英语人>网络例句>承包人 相关的搜索结果
网络例句

承包人

与 承包人 相关的网络例句 [注:此内容来源于网络,仅供参考]

Article 15 The State shall encourage individuals or collectives to contract to develop and rehabilitate waste hills, unreclaimed lands or waste beaches, and shall protect the contractors' lawful rights and interests.

第十五条国家鼓励个人或者集体对荒山、荒地、荒滩进行承包开发、治理,并保护承包人的合法权益。

Article l5 The State shall encourage individuals or collectives to contract to develop and rehabilitate waste hills, unreclaimed lands or waste beaches, and shall protect the contractors' lawful rights and interests.

第十五条国家鼓励个人或者集体对荒山、荒地、荒滩进行承包开发、治理,并保护承包人的合法权益。

The quality of materials and the standards of workmanship to be provided by the Contractor shall be clearly described.

承包人提供的材料的质量和工艺标准必须作出明确的规定。

What you can write-off is dependent upon how your helper is classified – as an employee or independent contractor.

你可以注销,是取决于你的帮手是分类作为一个雇员或独立承包人

General Contractor shall ensure that should the Owner be joined as a party in any action or proceeding arising out of the violation or an alleged violation of the Labor Law of China in the performance of the Contract, the General Contractor, Subcontractor or Materialman violating or alleged to have violated such law, or using or introducing goods manufactured or alleged to have been manufactured in violation of the law, shall defend and hold harmless the Owner in any such action or proceeding and pay and defray any damage, expense and cost of any description by reason thereof, including reasonable attorneys fees.

5.5 在合同履行过程中时,如果因违反了或有嫌疑违反了中国劳动法而引起的法律诉讼,使发包人成为诉讼参与人,则违反或有嫌疑违反了上述法律的、或者使用或采用违法制造的或有嫌疑违法制造的物品的总承包人、分包人或材料商应在任何这类诉讼中为发包人辩护,使发包人免受损失,并支付因此而产生的各类损失、费用和开支,包括合理的律师费。

Notwithstanding Clause 6 iv, if the provisions of any contract between Carrier and any contractor or the provisions of any international convention or national law applicable to any such mode of Carriage employed at the time of such loss, damage, misdelivery, conversion or delay would result in liability

尽管有条款 6iv,如果运送人与任何承包人之间的合约中有相关规定,或适用於此类运输的任何国际公约或国家法规中有相关规定,且根据该规定在发生此类遗失、损坏、错误交货、调换或延误时,内陆运输运送人所承担的责任小於条款 6iv 中规定的责任,则运送人的责任应不超过较小的责任。

If, within the said time, such permission is noy granted, the Contractor may, but is not bound to, elect to treat the suspension where it affects part only of the Works, as an omission of such part under Clause 51 by giving a further notice to the Engineer to that effect, or where it affects the whole of the Works, treat the suspension as an event of default by the Employer and terminate his employment under the Contract in accordance with the Provisions of Sub-Clause 69.1, whereupon the provisions of Sub-Clause 69.2 and 69.3 shall apply.

如果在该期限内未得此项准许,则承包人可以根据第 51 条规定,向工程师递送通知,将仅影响该工程局部的停工工程视为被取消部分不予施工,或者,当在此项停工影响整个工程施工时,则可视为业主违约。,并据第 69.1 款终止合同,在这种情况发生时,应接第 69.2 款及第 69.3 款处理。

Such is liquidity in this market that a cash-strapped hotel in the central city of Wuhan reportedly decided to use the coupons as part-payment for a decorating job. The unamused contractor, it is said, refused to bite.

据报道称,武汉城区一家资金周转困难的旅馆决定使用月饼券来抵消装修队的部分工资,结果被不苟言笑的承包人拒绝,月饼券的流通性可见一斑。

For embedded concreting, available details in concrete shall be fulfilled by the civil Contractor under the Bidder 's supervision.

关于装入的混凝土的细节问题,工程承包人必须在投标人的监督下给与解决。

Result of work stoppages, idling of the labour force, changes in transportation, transfer and move of machinery and equipment, overstocking of materials and components, etc.

第二百八十四条因发包人的原因致使工程中途停建、缓建的,发包人应当采取措施弥补或者减少损失,赔偿承包人因此造成的停工、窝工、倒运、机械设备调迁、材料和构件积压等损失和实际费用。

第7/10页 首页 < ... 2 3 4 5 6 7 8 9 10 > 尾页
推荐网络例句

Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.

最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。

Only person height weeds and the fierce looks stone idles were there.

只有半人深的荒草和龇牙咧嘴的神像。

This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.

这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。