承包人
- 与 承包人 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Tupper bouncing in with his peashooter just in time to be late after she doing the trick of the loop with officer Taylor.
芝加哥的一位富有的承包人诺曼·W·塔珀,发现自己那位漂亮然而不贞的妻子,坐在泰勒军官的腿上。
-
You may want to have the loan proceeds sent directly to you, not the contractor.
你想拥有一笔贷款直接寄给你,而不是承包人。
-
Eighteen. The contract, quadruplication, 4 duplicates, client and contractor take two.
十八。本合同一式四份,发包人、承包人双方各执两份。
-
If, by reason of any accident, or failure, or other event occurring to in or in connection with the Works, or any part thereof, either during the execution of the Works, or during the Period of Maintenance, any remedial or other work or repair shall, in the opinion of the Engineer or the Engineer'sRepresentative, be urgently necessary for the safety of the Works and the Contractor is unable or unwilling at once to do such work or repair, the Employer may employ and pay other persons to carry out such work or repair as the Engineer or the Engineer's Representative may consider necessary.
如在施工或维修期间,因工程或部分工程发生或涉及任何意外、或事故、或其他事件,工程师或工程师代表认为需马上进行补救或其他工作或修理,以保证工程的安全,而承包人无法或不愿马上进行此种工作或修理,业主可雇用并支付他人进行工程师或工程师代表认为必要的此种工作或修理。
-
If, by reason of any accident, or failure, or other event occurring to in or in connection with the Works, or any part thereof, either during the execution of the Works, or during the Period of Maintenance, any remedial or other work or repair shall, in the opinion of the Engineer or the Engineer's Representative, be urgently necessary for the safety of the Works and the Contractor is unable or unwilling at once to do such work or repair, the Employer may employ and pay other persons to carry out such work or repair as the Engineer or the Engineer's Representative may consider necessary.
如在施工或维修期间,因工程或部分工程发生或涉及任何意外、或事故、或其他事件,工程师或工程师代表认为需马上进行补救或其他工作或修理,以保证工程的安全,而承包人无法或不愿马上进行此种工作或修理,业主可雇用并支付他人进行工程师或工程师代表认为必要的此种工作或修理。
-
Termination of the Contract shall not rescind compensation responsibility the Contractor should bear.
合同的终止并不解除承包人应承担的赔偿责任。
-
Party B with Certificates of Insurance (or evidence of self-insurance) for all insurance required herein.
开时提供本协议项下的服务之前,承包人应向乙方提供本协议所要求的一切保险的保险单据。
-
Prior to the commencement of services hereunder, the Contractor shall furnish Party B with Certificates of Insurance (or evidence of self-insurance) for all insurance required herein.
开时提供本协议项下的服务之前,承包人应向乙方提供本协议所要求的一切保险的保险单据。
-
of complying with any instruction which the Engineer may issue to the Contractor in connection therewith,and
为执行工程师可能向承包人发出的与此情况有关的任何指示而发生的正当合理的费用,以及
-
Such unperformed obligations only can be of a financial or administrative nature as, with the issue of the Performance Certificate, the Contractor's physical obligations will have been completed.
此类未履行的义务只能是财务或管理方面的,因为缺陷责任证书颁发时,承包人的实际义务业已完成。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。