成本计算
- 与 成本计算 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
ZEDsystems-open book development costing and appraisal; ZED in a Box standard house type range; and ZEDproducts integrated supply chain inform many of our designs.
ZED系统——开放式账册开发成本计算和评估;在箱式标准住宅房型范围内的零能耗开发;零能耗开发产品,包含阐述我们的很多设计的供应链。
-
Depreciation expense is a charge against taxable income, which reduces the amount of taxes paid, and as a result, increases the cash flow attributable to an investment by the amount of those taxes saved, but depreciation expense under existing tax laws is based on historic cost.
折旧费用是计入应税所得,这样可以减少纳税,结果,增加现金流量是因为这项投资税额的减少,但是在现行税法的折旧费用是根据历史成本计算的。
-
Security center set up in line with the principle of social division of labor, the Center secured credit from its own strength and capacity of individual housing loans to provide professional, full security, will depend in large measure to protect the safety of bank funds, and exempt the bank under the original cost of the mortgage.
安全中心成立于行的原则,社会分工,中心担保信贷从自身的实力和能力的个人住房贷款提供专业,全面的安全,将在很大程度上取决于保护的安全性银行资金,并免除了银行的原始成本计算的抵押贷款。
-
BANK LOANS At 30 June, the bank loans were repayable as follows: The Group 2008 2007 HK$'000 HK$'000 Within one year or on demand 12,480 25,311 After one year but within two years 7,800 20,770 After two years but within five years – 27,090 After five years – 826 7,800 48,686 20,280 73,997 All of the non-current interest-bearing borrowings are carried at amortised cost.
银行贷款于六月三十日,须偿还之银行贷款如下:本集团二零零八年二零零七年千港元千港元一年内或按要求 12,480 25,311 一年后但两年内 7,800 20,770 两年后但五年内– 27,090 五年后– 826 7,800 48,686 20,280 73,997 所有非即期计息借贷按摊销成本计算。
-
So the system COREX off gas shaft furnace process simulation and training is set up. The distribution of flow field, pressure field, and temperature field, and concentration field are obtained Technician can directly see the distribution of gas and burden flow and can understand deeply shaft furnace process principles et al. This system can compute material and energy balance and production cost et al. It can train operator and technician et al.
为此我们利用前面开发的综合竖炉数学模型,开发了利用COREX尾气的竖炉过程的仿真培训系统,以使从事此过程的技术人员能够深入了解COREX尾气竖炉还原过程的原理、反应过程等内部现象,直接观察到竖炉内部气流、物流及气体压力、温度和浓度的分布;对COREX尾气竖炉工艺可进行能流物流平衡和生产成本计算;并对操作人员和工程技术的人员可进行教学培训功能等。
-
Interim and year end materials full count is organized by the HK Costing Manager.
中间时期和年结束材料全部计数被 HK 成本计算经理组织。
-
Recommend setting up accounts, filling and presenting and verifying the accounting voucher, register the account book, accounting methods, such as cost calculation and working out the accounting statement, etc.
介绍了设置帐户、填制和审核会计凭证,登记帐簿,成本计算及编制会计报表等会计核算方法。
-
This allows the project manager to keep in check how projects have progressed against internal costings or quotations.
这使得项目经理将在检查项目的进展对内部成本计算或报价。
-
Experience in standard costings in a manufacturing/service centre environment is preferred.
具有在制造业或服务中心的标准成本计算的经验的候选人将被优先考虑。
-
This allows the project manager to keep in check how projects have progressed against internal costings or quotations.
这使得项目经理保持在检查项目进展如何对内部成本计算或报价。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力