英语人>网络例句>建筑规范 相关的搜索结果
网络例句

建筑规范

与 建筑规范 相关的网络例句 [注:此内容来源于网络,仅供参考]

This year's group of experts charged with two innovations, first invited the representatives of the owners as members, 10 members are representatives of the three owners, the Expert Advisory Group on behalf of the owners Liuhongcheng President made a special trip from Canada to participate in the selection star property owners represented in the assessment, and more consideration of the purchase in occupancy after concerns in particular regulating the sale of the property rights protection; Special invited to the first "foreign judges", 23-25 Hoss Professor of Architecture, the design of the Danish Royal Academy Professor Steve Mr.

今年的专家评委团有两点创新,第一次邀请了业主代表作为评委,在十位评委中有三位业主代表,专家评委团中的业主代表刘宏诚先生专程从加拿大回国,参与明星楼盘评选,业主代表参与评楼,更多地考虑了购房人在入住后关注的问题,特别是规范销售等方面保障购房人的权益;第一次特别邀请了&洋评委&,丹麦奥尔胡斯建筑学院教授、丹麦皇家设计学院客座教授邦拿力克先生对北京楼市做出了独到的评价。

The management intersects all the process of investment,design,bid invitation and submission, and construction.

在建设工程中,质量是根本,造价是核心。合理确定工程造价是规范、整顿建筑市场秩序的重要保证。

HRB400 steel bars is characterized by high ratio between strength and price, stable quality, good welding quality and ductility. At present ,it has been listed in revised newly code for design. It must be widely used as leading steel bar in reinforced concrete structure of china.

HRB400级钢筋具有强度价格比高、质量稳定、机械、焊接、抗震性能良好等优点,目前已被正式列入国家相关规范标准,要求在建筑结构中大力推广,使之成为我国混凝土结构的主导钢筋。

JGJ 94–94 Technical code for building pile foundation.

JGJ 94–94建筑桩基技术规范。

The article introduces the working mechanism and characteristics of the column hammer impact expanding pile process to reinforce the subgrade and its design calculation method.

在《建筑地基处理技术规范》(JGJ79一2002)中对柱锤冲扩桩法的解释是:&反复将柱状重锤提到高处使其自由落下冲击成孔,然后分层填料夯实形成扩大桩体,与桩间土组成复合地基的地基处理方法&。

Since the installation of fire safety is not a part of a building structure and the seismic building design code does not include fire water pipings, the design of them in Taiwan does usually not consider the seismic effect. This study first collected and summarized the relevant seismic design codes and fire control standards from U.S., Japan, China and Taiwan to understand the internationally adopted methods for seismic from designs of fire water pipings. This study also gathered engineering cases and photographs of the installation of the shock resistance hangers of fire water pipings in high technology factory buildings. Then, this study presented a proposal for seismic design principles. we hope this can attract attentions from government authorities and the fire safety business sector and to rise concerns of the seismic design of fire safety installation; and therefore set up a clear and practical criterion for the engineers and finally reduce the damage of post earthquake fires.

由於消防安全设备向来都是归属於非结构物,国内一般在进行结构设计时并未将消防管路纳入耐震设计的范畴内,本研究系针对建筑物内消防管路的耐震设计为议题,搜集并整理出美国、日本、大陆及国内等相关建筑和消防规范的执行现况,以了解目前国际上在消防管路方面所采取的耐震设计手法,本研究也同时汇整了目前国内重大科技厂房新建工程在消防撒水管路耐震吊架上,所采用的设计案例和实际装置后照片,祈能藉由此案例唤起国内相关主管单位和消防业界对建筑物内消防安全设备耐震力设计的关注,共同研议订定出明确、实用且可供大家遵循的消防安全设备耐震设计准则,以减低国内在地震后火灾所造成的危害。

The Company is a professional R & D, production and sales of construction equipment for Electrotechnical spring supporting Annex switch, socket series of professional business, the company is strong in technology, well-tested means of strengthening the quality, standardize their internal management, is a design, manufacturing, Sales for the modernization of the whole enterprise.

本公司是专业研发、生产和销售适合建筑装潢电工配套附件开关、插座系列、电脑线、节能灯、断路器等专业企业,本公司技术力量雄厚,设备齐全,质量测试手段夯实,内部管理规范,是一个集设计、制造、销售为一体的现代化企业。

The new ideas from this paper: using mechanics principle study of soil, create a practical test to prove that it could change the physical mechanics character of base soil completely, reducing distortion, improving strength, and eliminating wet or sinking of base soil by seal extrusion during hole formation process at certain replacement rate; it could strengthen the loessial soil base to high bearing capacity to standard value of 300 to 400kPa through seal extrusion to hole formation technology together with rammed cement soil pile. Some value of the parameters adopted by bearing capacity calculation of the composite base of rammed cement soil pile with seal extrusion to hole formation exceeded the criteria of 'Technical Regulation on Building Ground Treatment'.(JGJ79-2002) This technology meet the design requirements and save investment.

本课题的创新点:1 利用土力学原理进行研究及理论推导,并经实践:证明了在置换率为某一定值的情况下,在成孔过程中通过挤密作用可以从根本上改变地基土的物理力学性质,使地基土的变形减小,强度提高,湿陷性消除;2 挤密成孔工艺与夯实水泥土桩的组合,可使低强度的湿陷性黄土地基变成高强度的复合地基,其承载力特征值可达 300~400kPa;3 挤密成孔法夯实水泥土桩复合地基承载力计算所采用的有关参数取值范围超出了《建筑地基处理技术规范》JGJ79-2002 中的有关规定;4 在节省投资的前提下,解决了地基高承载力、低变形及黄土湿陷性问题,达到了设计要求。

See revised figure will increase based on SC-02 schematic form filling is not aimed at a base, is here to meet the requirements of the two programs are filling in the rubble masonry walls directly on the basis of the provisions under the Chinese drawing specifications, structure Orthography of commonly used map drawing, there is no column in the upper part of the case can not indicate a position of the axis of the concrete beam elevation, sections and steel can be combined with SC-07 and SC-08

中国国家建筑标准设计图集《03G101-1》第4.2.3条第六项有说明:梁顶面标高高差,系指相对于结构层楼面标高的高差值,对于位于结构夹层的梁,则指相对于结构夹层楼面标高的高差。有高差时,需将其写入括号内,无高差时不注。中国规范现在均采用的是平法施工图的简化表示方法,不需表示梁的剖面

It brings too many difficult for fire-protection management to authorize according to the traditional Code because many new type buildings have been built. The performance-based approach may be a practice method to solve the problem.

新型建筑的出现给按照传统规范进行审核带来了许多难题,性能化防火设计方法是解决这一难题的可行方法。

第11/12页 首页 < ... 4 5 6 7 8 9 10 11 12 > 尾页
推荐网络例句

But we don't care about Battlegrounds.

但我们并不在乎沙场中的显露。

Ah! don't mention it, the butcher's shop is a horror.

啊!不用提了。提到肉,真是糟透了。

Tristan, I have nowhere to send this letter and no reason to believe you wish to receive it.

Tristan ,我不知道把这信寄到哪里,也不知道你是否想收到它。