布置
- 与 布置 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The furnish of pile is adjusted accounted through characteristic of inequable of construct load in order that every pile stake play a fully role in.
桩位布置时兼顾建筑物荷载分布的不均匀性作适当调整,以便使每根桩的承载力得到充分发挥。
-
Responsible for the running of intercompany computer system.
完成上级领导临时布置的相关工作。12。遵守公司各项规章制度。
-
But it is at the stage of theoretic research in China The expandable sand screen technology is used for sand prevention in the downhole In fact, it is a series and intermesh axes slotting and the ar rangement of the slotting make the pipe string easy to ex pandable.
它是一种适用于井下防砂的膨胀筛管技术,膨胀防砂筛管实质上是具有一系列串联的、互相交错的轴向割缝的管子,割缝的布置使管柱更易于膨胀。
-
In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.
本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。
-
Per interstation.
预计在车辆段区域要布置最多10多个 RAP 。
-
This paper presents research on the intersystem prediction and analysis of electromagnetic compatibility to the radio systems positioned by the geographical longitude and latitude coordinate system and the elevation system.
本文对处于陆上局部区域内的、以经纬度地理坐标系和高程系进行定位的无线电系统间的电磁兼容性预测进行了研究,以对系统间的相互干扰情况作出预测,给解决局部区域中无线电系统间相互干扰问题的方案提供支持,以避免在系统布置、安装完成之后出现相互干扰情况而使系统性能下降,甚至失效,造成资金和时间的浪费。
-
These day seems happened a lots of interesting things,especially I moved into the new dormitory recently,then i made the room very warm and confortable,we were distribute different place,and lived with people came from different countries,start new life.We all feel very fresh,but the biggest challenge is language for us, we can't speak chinese any more,therefore it's quite unnatural,for as much as some meaning i don't know how to expression_r.Maybe that's meaning we already introject foreign country's life,so i should speak english more harder.
These day 似乎发生了好多有趣的事,特别是最近搬进了新的公寓,房间也布置的很温馨哦,我们几个中国学生被分配到了不同的楼里,和不同国家的人开始了新的生活,大家似乎都觉得很fresh,不过对我们来说最大的挑战就是语言了,再也不能说中文了,所以特别别扭,好多意思都不知该怎么表达,这也许就意味着真的要过异国生活了,努力的说英语吧!
-
Vehicle headlamp provided with a metal halide lamp comprising a discharge vessel surrounded with clearance by an outer envelope and having a ceramic wall which encloses a discharge space containing xenon and an ionizable filling, wherein in said discharge space two electrodes are arranged whose tips have a mutual interspacing EA so as to define a discharge path between them, wherein the discharge vessel has an internal diameter Di at least over the distance EA, and wherein Di is smaller than or equal to 2 mm and the relation EA/Di is smaller than 6, with the special feature that said vehicle headlamp has not more than one band-shaped light-absorbing coating laterally of the discharge path.
一种配置金属卤化物灯的车辆前灯包括:放电容器,其被外壳有间隙地包围,其具有陶瓷壁,所述陶瓷壁封闭包含氙和可电离填充物的放电空间,其中两个电极布置在所述放电空间内,所述电极末端具有相互间隔EA,因而在它们之间定义放电路径,其中放电容器至少沿着距离EA具有内径Di,其中Di小于或等于2mm,以及关系式EA/Di小于6,其特征在于,所述车辆前灯放电路径的侧向方向具有至多一条带状光吸收涂层。
-
In addition, it is applied to the condition when cooler are placed to both sides and ipsilateral all.
此外,该数值模拟对冷却器分两侧和集中一侧布置两种情况均可适用。
-
B: If you don't mind, Johnathan, while you and Mr. Sun get acquainted, I'd like to check the arrangements for the meeting.
如果你不介意,Johnathan,在你和孙先生互相认识时,我先失陪,看看会议布置得如何。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?