英语人>网络例句>布置 相关的搜索结果
网络例句

布置

与 布置 相关的网络例句 [注:此内容来源于网络,仅供参考]

Centrifugal energy saving analysis and measures: 1 improve the efficiency of centrifugal pumps a first step, in the selection of comparison, when many suppliers Selection program, in considering the cost-effective choice as far as possible under the premise of efficient programs; the second step , accredited professionals must Mill producers, affecting the pump efficiency of the key components such as impellers, pump body, pump cover, diversion devices, such as the manufacture of quality producers, especially for the airfoil impeller , outlet angle, leaves the sub-degrees, the shape of flow channel, to control the quality of finish, etc., so that products are delivered in the current production under the conditions of highly efficient products; the third step, the scene in the production of installation and debugging process, pump to ensure a solid foundation, with the driving machine for good, before and after valve flexible piping layout design is reasonable, on-site control is feasible and safe, the complete and accurate monitoring instrumentation to ensure that pump operation can carry out real-time monitoring; fourth step , are at long-term operation of water pumps necessary to pay attention to the equipment inspection and found anomalies reflect real-time reporting, in the normal minor repairs, overhaul cycle, to deal with the replacement of wearing parts inspection to ensure the pump's long-term safe and efficient operation.

第一步,在选型时多比较各供应商的选型方案,在考虑性价比的前提下尽量选用效率高的方案;第二步,派驻一定的专业人员驻厂监制,对影响水泵效率的关键零部件如叶轮、泵体、泵盖、导流器等的制造质量进行监制,尤其对叶轮的翼形、出水角、叶片的分度、流道的形状、光洁度等质量进行控制,使交付的产品是在当前的生产条件下的高效率的产品;第三步,在生产现场的安装调试过程中,要保证泵的基础牢靠,与驱动机对中良好,前后阀门开关灵活,管道布置设计合理,现场控制安全可行,各运行监控仪表齐全准确,保证泵的运行过程能够进行实时监控;第四步,是在水泵的长期运行中要注意对设备的点检,发现异常情况即时反映汇报,在正常的小修、大修周期中,应对各易损件进行检查更换,保证泵的长期高效安全的运行。

To be responsible for the correct set up of all mise an place and side stations

负责纠正规定位置摆设的布置,确保营业时器具的充分和恰当。

To be responsible for the correct set up of all mise an place and side stations, and to ensure that there

负责纠正规定位置摆设的布置,确保营业时器具的充分和恰当。

In Asia Pacific, it is 2D layout then "PDMS modeller" transfer to 3D and some company it is for show.

在亚太地区,一些公司是这样的,做好二维平面布置,然后通过PDMS建模的人装入三维中。

It is made up of a gearbox and moderate breeze gear wheel transmission that the SGZ1000/3000 type scraper conveyor cuts the cutting department, cut the electrical machinery of cutting department and put to fix up horizontally in the rocker arm, the power that the motor outputs leans on a round of transmission of department of gear wheel and planet round via the tertiary straight tooth, urge the cylinder to rotate finally.

SGZ1000/3000 型输送机传动部主要是由一个电动机、减速箱和液力偶合器组成,该输送机内横向布置,电动机输出的动力经由二级齿轮和一级行星轮系的传动,最后驱动链轮转动。

This design firstly fixed on design scheme and selected basic components, and besides, developed the reliability analysis of transmission system. The design of MG300/701-WD Shearer's cutting unit. It is made up of a gearbox and moderate breeze gear wheel transmission that the MG300/701-WD type mining machine cuts the cutting department, Cut the electrical machinery of cutting department and put to fix up horizontally in the rocker arm, The power that the motor outputs leans on a round of transmission of department of gear wheel and planet round via the tertiary straight tooth, Urge the cylinder to rotate finally.

本文首先确定了设计方案和选择了基本部件并开展了传动系统的可靠性分析,MG300/701-WD型采煤机截割部主要是由一个减速箱和四级齿轮传动组成,截割部电机放在摇臂内横向布置,电动机输出的动力经由三级直齿圆拄齿轮和行星轮系的传动,最后驱动滚筒旋转。

It is made up of a gearbox and moderate breeze gear wheel transmission that the MG400/900-3.3D type mining machine cuts the cutting department, cut the electrical machinery of cutting department and put to fix up horizontally in the rocker arm, the power that the motor outputs leans on a round of transmission of department of gear wheel and planet round via the tertiary straight tooth, urge the cylinder to rotate finally.

MG400/900-3.3D型采煤机截割部主要是由一个减速箱和四级齿轮传动组成,截割部电机放在摇臂内横向布置,电动机输出的动力经由三级直齿圆拄齿轮和行星轮系的传动,最后驱动滚筒旋转。

It is made up of a gearbox and moderate breeze gear wheel transmission that the MG250/591-WD type mining machine cuts the cutting department, cut the electrical machinery of cutting department and put to fix up horizontally in the rocker arm, the power that the motor outputs leans on a round of transmission of department of gear wheel and planet round via the tertiary straight tooth, urge the cylinder to rotate finally.

MG250/591-WD 型采煤机截割部设计主要是由一个减速箱和四级齿轮传动组成,截割部电机放在摇臂内横向布置,电动机输出的动力经由三级直齿圆拄齿轮和行星轮系的传动,最后驱动滚筒旋转。

It is made up of a moderate breeze gear wheel transmission that the MG400/920-WD type mining machine cuts the cutting department, cut the electrical machinery of cutting department and put to fix up horizontally in the rocker arm, the power that the motor outputs leans on a round of transmission of department of gear wheel and planet round via the tertiary straight tooth, urge the cylinder to rotate finally.

MG400/920-WD 型采煤机截割部主要是由四级齿轮传动组成,截割部电机放在摇臂内横向布置,电动机输出的动力经由三级直齿圆柱齿轮和一级行星轮系的传动,最后驱动滚筒旋转。

It is made up of a gearbox and moderate breeze gear wheel transmission that the MG200/456-AWD type mining machine cuts the cutting department, cut the electrical machinery of cutting department and put to fix up horizontally in the rocker arm, the power that the motor outputs leans on a round of transmission of department of gear wheel and planet round via the tertiary straight tooth, urge the cylinder to rotate finally.

MG200/456-AWD 型采煤机截割部主要是由一个减速箱和四级齿轮传动组成,截割部电机放在摇臂内横向布置,电动机输出的动力经由三级直齿圆拄齿轮和行星轮系的传动,最后驱动滚筒旋转。

第60/100页 首页 < ... 56 57 58 59 60 61 62 63 64 ... > 尾页
推荐网络例句

Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.

最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。

Only person height weeds and the fierce looks stone idles were there.

只有半人深的荒草和龇牙咧嘴的神像。

This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.

这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。