布置
- 与 布置 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The experimental study on energy dissipation for Yuanmanguan Power Station was carried out by the hydraulic model test, put forward a new energy dissipator style and its designing method on five crest spillway flood for arch dam.
利用水工水力学模型试验研究方法对圆满贯工程泄洪消能问题进行研究分析同时,为百米级拱坝在五表孔布置方面,提供了一种全新的泄洪消能工体型与设计思路,即采用宽尾墩窄缝纵向水舌与连续鼻坎横向扩散的布置形式,可以使水舌在纵向与横向实现全范围的扩散,消能率提高,适应不同运行方式需要的同时,缩短了RCC拱坝施工工期,节约了工程总投资。
-
To improve temperature uniformity,trolley electric furnace heated by three districts, in accordance with temperature arrangement method arrange heating elements, compensation for loss of furnace heat mouth, I District II District III district heating elements layout of the different, but the car high-precision temperature furnace heating and insulation in the process of maintaining three districts temperature consistent.
可为用户定做各种规格尺寸高精度高温台车电炉。为提高炉温均匀性,台车电炉采用三区加热,并按均温布丝法布置加热元件,为补偿炉口热损失,I区II区III区加热元件布置范围各不相同,但使高精度高温台车电炉在升温及保温过程中保持三区均温一致。
-
The effect of switching modes on the entrancement,combustion and billet heating process in furnace were analyzed numerically,and the computational results were compared with production records and onsite measurement,which verified the practicability of this CFD system.
结果表明:采用分段同侧换向控制的HTAC加热炉能获得很好的流场和温度场分布,基本满足高质量的钢坯加热需要,但该炉在生产条件下的温度制度存在不合理之处,在今后设计和操作中应进一步优化和改进;全同侧换向控制的火焰布置方式不利于钢坯的均匀、快速加热;而采用交叉换向控制的火焰布置方式可以改善加热炉内的流场和温度分布,更有利于满足钢坯的加热工艺要求。
-
Aimed at the low screening efficiency of Aiyou Coal Preparation Plant,some technical reforms were done,namely,proper coal feed rate,fitting position of feed trough and regular analysis of screening efficiency ,and the screening efficiency was obviously increased.
针对艾友矿选煤厂筛分效率低的问题,采取制定合理给煤量、合理布置筛网、合理布置给料溜槽和定期取样分析筛分效率等技术措施,使筛分效率得到明显提高。
-
On 6 October 1941, under the command of Lieutenant Commander Florian Popescu, Carol laid anti-submarine mines in the southern part of Midia-Tuzla barrage, together with the NMS Amiral Murgescu and NMS Dacia mine laying ships, during Operation Varna. On 9 October 1941, Carol laid anti-submarine mines south-west of Cape Kaliakra. On 10 October 1941, at 11:50 hours, after having left Varna harbor with a new load of mines, Carol hit a mine and sunk in 13 minutes, 2 miles away of Galata Burnu lighthouse.
1941年10月6日的瓦尔纳行动中,在弗洛里波佩斯库上尉的指挥下,卡罗尔号与穆歇海军上将号布雷舰、达西亚号布雷舰在Midia-Tuzla一线水域南部布置反潜水雷。1941年10月9日,卡罗尔号在卡利亚克拉海角西南角布置反潜水雷。1941年10月10日,11点50分,卡罗尔号在补充新的水雷后离开瓦尔纳港,当它行驶到2英里外的加拉塔布尔努灯塔处时,撞上一枚水雷并在13分钟内沉没。
-
The technical problems, about shortage of separation distance, the feasibility of high-rise polymerization factory building, the fire separation and explosion-proof design of polymerization factory building, the selecting and arrangement of water spraying extinguishing system nozzle, the establishment of deluge system valve, and the essentiality of water spraying extinguishing system which is to be established to protect the VCM gasholder, the positioning of water curtain settled under the space which connect the PVC pack house and pack department and how long the system continue operate? The selecting and the quantity of fire extinguishing agent about gas extinguishing system, which will be used in the new 35KV switch station and some rooms including cabinet room, primary control room, UPS room, voltage changer room, belong to new polymerization power panel and UPS station. Designing the model of power supply and distribution for fire-fighting and designing the hardware organization, software, model of data transmission and fire gang control logic programmer about automatic fire alarm system. Making certain the grade of release source point in the fire or explosive atmosphere and delimiting different grade explosion-proof space. Selecting correct explosion-proof construction of electrical apparatus and delimiting the class of building lightning protection, putting forth the concert steps to deal with thunder stroke and electrostatic discharge and so on, have been deeply researched in the process of designing and then the concert steps to deal with them have been putted forth.
针对设计中遇到的防火间距不足、聚合厂房可否采用高层厂房、聚合厂房的防火分隔和防爆设计、水喷雾灭火系统的喷头选型和布置、雨淋阀组设置、VCM气柜是否需要设置水喷雾灭火系统、PVC仓库与包装车间相通处水幕带的布置和系统工作时间的确定、新建35kV开关站和聚合配电及DCS机柜间内的机柜间、主控室、UPS间、变压器室等处设置的气体灭火系统选型和灭火剂用量确定、消防供配电方式、火灾自动报警系统的硬件结构、软件设计、数据传输方式及联动控制设计中的逻辑编程、爆炸和火灾危险环境危险释放源等级确定和防爆区域等级范围的划分、爆炸危险区域电气设备的防爆结构选型、建、构筑物的防雷类别划分及采取的防雷、防静电措施等具体工程技术问题在深入分析研究后,提出了相应的解决措施。
-
Concerning the planning, it was arranged to 120° groyne and the direction of flow diversion, in the construction, water jetting pile sinking was used in the experiment fixed concrete pile, and lead wire cage rubble was filled.
在规划布置时,宜布置成下挑式,顺水导流;施工时采用射水沉桩的方式固定混凝土桩,人工在混凝土桩间填置铅丝笼块石。
-
The key structures of underground powerhouse of Baise multipurpose dam project is accommodated in the diabase stratum, of which most sections of the headrace tunnel, delivery tunnel and other caverns most are accommodated in unfavorable stratum composed of mudstone, silicalite and carbonaceous silicalite.
百色水利枢纽工程地下厂房主体布置在辉绿岩地层当中,其中的引水系统、交通洞等洞室大部分洞段布置在由泥岩、硅质岩和含碳硅质岩等组成的不良地层下。
-
The absorber and evaporator are located at the heat demand side while the generator and condenser at the heat supply side, and the absorption heat in the absorber is supplied to heat consumers.
该系统利用吸收式热泵原理,以氨水为工作流体,发生器和冷凝器布置在热源端,而吸收器和蒸发器布置在热用户端,利用吸收器中溶液吸收蒸气所放出的吸收热来提供热能。
-
With this aided system ,we can get the general function of an ichnography edit system,and also get the 3D graphic for the construction site.
利用该系统可以快速地进行施工总平面布置设计,具有一般平面编辑系统所要求的各项辅助功能,同时可以对任意工期内施工现场的实际布置情况进行三维表达或以动画方式模拟实际建筑设施随工期的推进而发生的变化。
- 推荐网络例句
-
In the United States, chronic alcoholism and hepatitis C are the most common ones.
在美国,慢性酒精中毒,肝炎是最常见的。
-
If you have any questions, you can contact me anytime.
如果有任何问题,你可以随时联系我。
-
Very pretty, but the airport looks more fascinating The other party wisecracked.
很漂亮,不过停机坪更迷人。那人俏皮地答道。