布置
- 与 布置 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
From the function needing of the building, the top needs small axis dimension which has to be assigned, the next function part hopes that there is as big as possible free space, it is heavy for network to take post, for satisfying building the requests of function, the structure must be by fixing up contrary to routine way, in order to realize that this kind fixes up, must set up a special floor between the underpart in structure forms are different, make it bear top the internal force of structure and transmit and give underpart structure to play structure change the floors of function reliable. It is called transfer floor.
从建筑功能的要求上讲,上部需要小开间的轴线布置,下部公用部分则希望有尽可能大的自由灵活空间,柱网要大,为了满足建筑功能的要求,结构必须以与常规方式相反进行布置,为了实现这种布置,就必须在结构形式不同的上下部之间设置一个特殊的楼层,使其能承受上部结构的各种内力,并将其可靠的传递给下部结构,这一能起结构转换作用的楼层,称为转换层。
-
The change of condenser steam flow field causes the changes of its heat transfer coefficient and the vapor lock,with the analysis on the change of the tube bundle arrangement with the alteration of the steam flow field,proposed the change scope of the correction factor of the arrangement of condenser tube bundle with the alteration of the condenser steam flow field.
凝汽器蒸汽流场的变化使其传热系数和汽阻发生变化,传热系数和汽阻的改变使凝汽器管束布置修正系数随着负荷变化,分析了管束布置修正系数随蒸汽流场的变化而变化,提出了管束布置修正系数随蒸汽流场变化的范围。
-
In connection with engineering work in the design and choice of matching equipment stage of Zhou County Power Plant s 2×1 000 MW ultra-supercritical sets,the advantages and disadvantages of singly and dually arrayed H.
结合华电国际邹县发电厂2×1 000 MW超超临界机组在设计及设备选型阶段的工程实践,对选用双列高压加热器布置方案或单列高压加热器布置方案的利弊进行了详细的论述,最终经比较选择了双列布置方案。
-
The steam generator, in the incorporate type of the high-temperature gas-cooled reactor, should be of the compact structure, the least heating surface and the higher power density in order to decrease the volume of the initial-stress concrete pressure vessel, there by the steam generator with the uniflow multi-start helical coiled tubes is used generally for it possessing all these characteristics.
该下载资料由本站会员上传,如果侵犯了您的权力,请通知我们,将立即删除!摘要在采用一体化布置的高温气冷堆中,为了使预应力混凝土压力容器体积不致过大,蒸汽发生器应尽量紧凑,严格限制受热面空间布置,并要求其具有较高的功率密度。因此,一体化布置的高温气冷反应堆主要选用直流型多头螺旋管式蒸汽发生器。
-
The steam generator, in the incorporate type of the high-temperature gas-cooled reactor, should be of the compact structure, the least heating surface and the higher power density in order to decrease the volume of the initial-stress concrete pressure vessel, there by the steam generator with the uniflow multi-start helical coiled tubes is used generally for it possessing all these characteristics.
在采用一体化布置的高温气冷堆中,为了使预应力混凝土压力容器体积不致过大,蒸汽发生器应尽量紧凑,严格限制受热面空间布置,并要求其具有较高的功率密度。因此,一体化布置的高温气冷反应堆主要选用直流型多头螺旋管式蒸汽发生器。
-
The steam generator, in the incorporate type of the high-temperature gas-cooled reactor, should be of the compact structure, the least heating surface and the higher power density in order to decrease the volume of the initial-stress concrete pressure vessel, there by the steam generator with the uniflow multi-start helical coiled tubes is used generally for it possessing all these characteristics.
资料为硕士论文,包括完整计算过程,及相关设计图纸,推荐下载!摘要在采用一体化布置的高温气冷堆中,为了使预应力混凝土压力容器体积不致过大,蒸汽发生器应尽量紧凑,严格限制受热面空间布置,并要求其具有较高的功率密度。因此,一体化布置的高温气冷反应堆主要选用直流型多头螺旋管式蒸汽发生器。
-
Connecting with the summing up the design experiences of dozens of prefabricating yards and the results of a number of scientific research, this article expounds the compilation principles and other notes for general purpose graph on the prefabricating yards.
文中根据铁道部对通用参考图《铁路箱梁平面布置》的编制要求,结合笔者主持和参与的多个科研课题研究成果和对预制场的平面布置设计经验,从编制通用参考图的角度对《铁路箱梁预制场平面布置图》的编制原则进行论述。
-
Consider that processes the factor such as being convenient, the whole frame adopts the stencil plate to press the shaping craft, so as to ensure the whole intensity of the frame; The main body of the frame has continued to use the traditional ladder-shaped structure, of simple structure, stability is good; Assign the scheme wholly according to the electric automobile, has confirmed the physical dimension of the frame; Combine the scheme of decorating of the main spare part of electric automobile, has confirmed the frame is released, the crossbeam one decorates a form and connects the method, install the needing of main spare parts such as the gear box,etc. in because some crossbeams, has taken the structural form of the ingot roof beam.
考虑到加工方便等因素,整个车架采用钢板冲压成型工艺,以保证车架的整体强度;车架主体沿用了传统的梯形结构,结构简单,稳定性好;根据电动汽车整体布置方案,确定了车架的结构尺寸;结合电动汽车主要零部件的布置方案,确定了车架纵、横梁的布置形式及连接方法,部分横梁因为安装变速器等主要零部件的需要,采取了元宝梁的结构形式。
-
With the finite element method this *** analyzes influence factors of Lateral rigidity including layout and spacing of faade bracing, horizontal bracing and unusual arrangement of faade bracing firstly, revealing the change discipline of lateral rigidity. Then, on this basis, this *** further researches on frame Stability capacity and its influence factors such as semi-rigid node, bracing spacing, base transom height, distance between top transom and the supported matter, structure height, longitudinal distance between adjacent standards, distance between adjacent transoms, horizontal load, in order to find out the law of stability capacity, guiding the design and construction.
借助有限元本文首先分析立面斜杆的布置方式、布置间距、水平斜杆以及立面斜杆不正常布置等因素对架体抗侧刚度的影响,揭示抗侧刚度的变化规律;在此基础上,进一步考查了节点半刚性、斜杆间距、底排横杆高度、顶杆伸出长度、架体高度、立杆纵距、横杆步距、水平荷载大小等对架体稳定承载力的影响,以期得到承载力的变化规律,用来更好地指导设计和施工。
-
The three control systems respectively were as follows:(1) The measuring part of the first one was displacement piezoelectric sensor. A pair of piezoelectric sensor/actuator was collocated by each side of the first solar array plate. The compensator was H = 2395-s;(2) The measuring part of the second one was also displacement piezoelectric sensor.A pair of piezoelectric sensor/actuator was collocated by each side of the whole solarfan.Tthe compensator was H = 244s;(3) The measuring part of the third one was velocity piezoelectric sensor.A pair of piezoelectric sensor/actuator was collocated by each side of the three solars array plates near to the body of satellite.
三种控制系统分别是:(1)、采用压电位移传感器,压电传感器/驱动器对同位布置于内板的边缘,控制器补偿函数为H=2395s~(1/2);(2)采用压电位移传感器,压电传感器/驱动器对同位布置于整个太阳帆板的边缘,这是一种理想的情况,控制器补偿函数为H=244s~(1/2);(3)采用压电速率传感器,压电传感器/驱动器对同位布置于靠近星体的三块基板边缘,控制器补偿函数为H=2370s~(1/2)。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。