英语人>网络例句>布置 相关的搜索结果
网络例句

布置

与 布置 相关的网络例句 [注:此内容来源于网络,仅供参考]

Guo Buchu some days to collect a lot of work, itwas suggested moderation, bags mounting paste, this time, severalmembers of China Association have stepped up the exhibitionlayout.

果不出一些日子,作品收集了不少,有人提出适可而止,袋装裱贴,此时,几个民协会员便加紧了展览的布置

I will buck up and finish my homework assignments.

我会加把劲,完成布置的家庭作业。

The length of the ShuiBuYa station's vertical enclosed bus bar is 118 meters.

水布垭水电站垂直布置封闭母线的长度为118米,如此大的垂直高度在国内还是罕见。

Two of his assistants had been working busily since eight o'clock and had only just finished.

他的两位助手从8点就开始忙碌,刚刚才完成布置

This design has also drawn up the construction floor-plan, the progress schedule by-way chart as well as the time indice network chart.

本设计还绘制了施工平面布置图、进度计划横道图以及时标网络图。

Because many merits of the BZZ series hydraulic redirector with operation handiness,turning agile,installment arrangement convenience and so on,by extensive application in the project machinery,the farm machinery,the hoist transport machinery,the mining machinery and such.

BZZ系列全液压转向器具有操作轻便、转向灵活、安装布置方便等诸多优点,在工程机械、农业机械、起重运输机械、矿山机械等领域应用广泛。

From the burden increased aspect clarify set up the necessity of station, then pass to drew up to set up generalize of transformer substation and line direction to consider, and pass to analysis of carry the data, safety, economic and dependable consider and made sure the 110 kV, 35 kV, 10 kV and station use electricity of lord connect line, then again through burden calculation and power supply scope made sure main number, capacity and model number of the transformer set, also in the meantime make sure the station uses capacity and model number of transformer, end, according to biggest keep on work electric current and short circuit calculating of calculation result, to the high pressure Rong break a machine, insulate a switch, female line, insulate son and wear a wall set tube, electric voltage with each other feeling machine, electric current with each other the feeling machine carried on choose a type, thus completed a 110 kV electricity a part of design.

本文首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了110kV ,35kV ,10kV 以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,对高压熔断器,隔离开关,母线,绝缘子和穿墙套管,电压互感器,电流互感器进行了选型,然后进行配电装置和平面布置的设计以及防雷的设计,从而完成了110kV 电气一次部分的设计。

The primary mission of this design is to calculate the calorimeter, which is one important part of the experimental.

本次设计的主要任务是对试验台的一个主要部件——量热器进行设计计算,并对该试验台进行总体布置

His final chapter, set in the apocalyptic wilderness of the Camorra's smouldering waste dumps, is inspired—and prescient, as the garbage crisis in Naples unfolds.

本书的最后篇章被布置在"克莫拉"浓烟滚滚的垃圾堆场并被预示成一片荒野,作者有此灵感并有此般先见之明,是随着那不勒斯出现垃圾危机而与之俱来的。

The pictures, too, show an attractive room with slightly western influences—note the candelabra and candles, not Chinese! I wonder where she got the idea of the bread bowls?

图片也显示了有西方影响吸引力的餐厅装饰布置-特别是蜡烛台和蜡烛,这不是中国样式的!

第25/100页 首页 < ... 21 22 23 24 25 26 27 28 29 ... > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?