布线
- 与 布线 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
It is most likely that only a part of the karst caves could be detected if the boundary of the karsts cave has a certain horizontal extension respectively to measurement layout, but the interface of the karsts caves is not completely smooth plane, and its normal direction is not perpendicular to the tunnel axis. However, the precision of the cave detection is related to interface wave impedance difference of the karst caves, groundwater detection, operator's data acquisition experience and data processing level and so on.
如果溶洞的边界相对于TSP测量布线有一定的横向延伸性,其边界面不一定是完全平滑的表面,但其法线方向与隧道轴线不完全垂直,这类溶洞有可能被部分探测,但探测精度还与溶洞界面两侧的波阻抗差、对地下水的探测、操作人员的数据采集经验和数据处理水平等有关。
-
Ganzhou-strong science and technology was established in June 2004, mainly engaged in computer整机, accessories sales and service, installation and debugging of network engineering, integrated wiring systems business, and agents - to the international by the agents of the elite motherboards, easy wins Memory, Hitachi hard drive, U-heaven-sent, King's card, Pioneer optical storage, NESO monitors, and other advantages of IT products.
赣州强龙科技成立于2004年6月,主要经营计算机整机、配件销售与服务,网络工程安装与调试,系统综合布线业务;并代理讯宜国际所代理的精英主板、易胜内存、日立硬盘、天赐U盘,讯景显卡、先锋光存储、NESO显示器等IT优势产品。
-
It can route single layer and multilayer circuit boards, and there is an option to auto-route a single layer board with jumper wires.
能够传送单一层和多层电路董事会,有一项选择自动布线带套头外衣的一个层董事会电线。
-
Power over Ethernet products include both mid-span and endpoint solutions over CAT5 cabling up to 100 meters.
以太网供电有两种方法:中间跨接法和末端跨接法,都是通过长达100米的CAT55布线基础架构实现的。
-
The maximum package power dissipation is calculated using a junction temperature of 150C and a board trace length of 750 mils.
最高的功率为150℃计算的交界处的温度和1 750密耳板布线长度。
-
The wirings of strong electricity and weak electricity in the cabinets are separated to avoid mutual interference.
柜内强电和弱电布线分开以避免相互干扰。
-
With the changes below, when the template is changed as it would when applying a new skin, the property now automatically handle the unwiring of the old events and wiring up the new events.
随着模板时,下面是它改变了变化,将在应用新的皮肤,物业现在会自动处理旧事件和成立新的事件布线部署无线网络。
-
It shows this improvement is successful and has spreading applicable value for the new-built or reconstruction of smelting electric furnace .
本文根据一座6300kV·A矿热炉短网布线中电抗及电阻偏大,造成三相电极作功不平衡这一问题,提出改进措施,并对改进前后分析比较,说明改造是成功的。
-
Based on modernize and high and new technology, we are engaged in many kinds of developing, production, selling, and installation for the intelligent system and building talkback intelligent system.
目前,公司业务范围已覆盖小区智能化与智能家居产品销售,弱电系统集成及综合布线等等,是推动中国建筑智能化与家居智能化发展的主要力量之一。
-
Founded in 1977 as a trading company with imported wire accessories for local manufacturing industries, Logistic aims to be the most comprehensive stockist distributor by continuously diversifying our product portfolio covering fasteners, insulators, connectors, PCB cable management accessories and parts, honing equipment, industrial brushes and marine parts, etc...
成立于1977年的洛士,专业从事接线辅助零部件的贸易工作。致力于为制造工业提供最多样化的产品,涉及固定件,绝缘件,连接器,PCB上用的布线器材和配件,研磨设备,工业毛刷和马达零件等。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?