英语人>网络例句>工程量 相关的搜索结果
网络例句

工程量

与 工程量 相关的网络例句 [注:此内容来源于网络,仅供参考]

This article introduces the content and compilatory way of Bill of Quantities.

介绍了工程量清单的内容,清单报价的编制方法,并针对电力工程量清单的特点作了对比分析。

Works are expected to become a generation of software products, the volume of steel two-in-one software project to create a building of reinforced concrete hybrid computing model, BOQ software standards the first to adapt to national unity has become a model for the industry. In 2004, the industry can make the concept of data centers, engineering data to build professional web sites to provide data services. In 2005, the company launched Project Cost Management System, in the tools software, data services, cost management began three areas to provide customers with a comprehensive project cost computing services. In 2006, the company will focus on project management, systems management for industry to shape the revolutionary professional computing platforms for clients to build project management system.

工程预算软件成为一代精品,钢筋工程量二合一软件开创建筑钢筋、混凝土混合计算模式,工程量清单软件率先适应全国统一标准,成为行业典范。2004年,公司为行业提出数据中心概念,建立专业工程数据网站,提供数据服务。2005年,公司推出工程造价管理系统,在工具软件、数据服务、造价管理三个方面开始为客户提供全面的工程造价计算服务。2006年,公司将致力于工程管理领域,为行业走向系统管理塑造革命性的专业计算平台,为客户打造工程管理体系。

To meet the current competitive bidding projects, the project cost by the market, of the existing valuation methods and engineering works to be fixed for budget reform and project inventory valuation.

本论文对传统的定额计价和工程量清单计价的基本方法、程序、内容和特点进行了对比分析,同时分析了定额计价模式和工程量清单计价模式下的价格构成。

The second part of Quantity Price; The main part of the project, including the volume of sub-list of measures to the list of items and other items as well as their list of inventory valuation table and analysis of the integrated unit price table.

第二部分为工程量清单报价;主要包括分部分项工程量清单、措施项目清单和其他项目清单以及他们的清单计价表和综合单价分析表。

In the process of project invitation for bid while designing, investing and constructing, should adopt active strategies, so that protect the economic interest of building unit in the intense competition condition of building market.

工程量清单计价模式是以工程量清单报价为平台的新的计价模式,在"边设计、边投资、边施工"工程招标中,应采取积极策略应对,以便在建筑市场竞争环境中合理合法地保护建设单位的经济利益。

In the light of impacts bill valuation mode made on the cost management of highway construction project and indispensability of applying bill of quantities quotation to project cost management, this article offers a method of making construction budget according to bill of quantities items to solve the present problems of cost management and really connect bill of quantities with project cost management.

同时针对工程量清单计价模式对施工项目成本管理的影响及其引入到项目成本管理中的必要性,提出了按照工程量清单细目编制施工预算的解决途径,这也是工程量清单报价和项目成本管理的真正结合。

The resilience detailed list valuation is the contractor establishes based on the contract award person according to the unification project, the unification measurement rule and the Measuring unit the project resilience detailed list which in kind provides according to the prescribed form, the union project are practical, the market is practical and the enterprise reality, considered fully after each kind of risk, proposes including the cost, the profit and the tax money comprehensive unit price, from this forms the project price.

工程量清单计价是承包人依据发包人按统一项目设置,统一计量规则和计量单位按规定格式提供的项目实物工程量清单,结合工程实际、市场实际和企业实际,充分考虑各种风险后,提出的包括成本、利润和税金在内的综合单价,由此形成工程价格。本文选自《改革与开放》 2009年第7期,您可以通过多种购买方式获得本刊的内容为帐户充值,可以更方便的在龙源期刊网购买文章

Engineering all risks insurance in the amount of Quantities Chapter 100 (not including engineering and all third-party liability insurance premiums) to the total amount of Chapter 900, according to the premium rate of 3 ‰ included in the Bill of Quantity.

工程一切险的保险金额为工程量清单第100章(不含工程一切险及第三方责任险的保险费)至第900章合计金额,保险费按3‰的费率列入工程量清单。

With the rapic development of our construction market, the more popularation of inviting tender and tender law of project and contract management system and the current conditions of our entry into WTO in December 2001, the traditional valuation model of project does not adapt to the need of development.

随着我国建设市场的快速发展、招标投标法、合同制的进一步推行以及我国于2001年12月加入WTO,传统的工程造价计价模式已愈来愈不适应市场经济发展的要求,要与国际接轨就必须对工程造价计价模式进行改革。本文首先在分析英国、日本、美国等国外的工程造价计价模式和我国传统工程造价计价模式的基础上,着重研究了新的工程造价计价模式——工程量清单计价模式及2003年7月1日开始全面实施的《建设工程工程量清单计价规范》的相关问题。

From the bid ding under priced bill of quantities, the article dissents the deficiencies of priced bill of quantities and proposes countermeasures that can be of referential value.

文章从工程量清单招标过程着手,深入剖析了实行工程量清单招标的不足,提出了工程量清单招标中应采取的对策,对工程量清单招标具有借鉴作用。

第1/8页 1 2 3 4 5 6 7 8 > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力