英语人>网络例句>工程设计 相关的搜索结果
网络例句

工程设计

与 工程设计 相关的网络例句 [注:此内容来源于网络,仅供参考]

The routine design method of the dike dam is, which is borrowed the experience of deviser, followed the relative criteria and requests, and set up the engineering instance after making choices of the dam, to carry on the dam arrangement and figure designation. Then it should carry on the seepage analysis inside the dam and the stable calculation of the dam slope. It also needs to check whether to satisfy the norm request of design, then gets a feasible scheme.

常规的堤坝设计方法是在选定坝址后凭借设计人员的经验,遵循有关规范和运行要求,并参照已建工程实例,进行坝体布置和体形设计,然后进行坝内渗流分析和坝坡的稳定计算,以检查所选的方案是否满足设计规范的要求,如果满足,即得到一个可行方案。

Earthworks zero line is determined by constructing the spatial gridding curved surface model of the original terrain and the field leveling design terrain by digital elevation mode. The DEM data of original terrain are obtained by actual measurement. The mathematical correlation is deducted to demonstrate the relationship between the coordinates of any point on spatial line and the direction cosine by the spatial linear equation. DEM data obtaining program is compiled by Fortran9.0 and it is applied automatically to obtain the DEM data of field leveling design terrain.

目的 利用数字高程模型(digital elevation model, DEM)构造原始地形和场平设计地形的空间网格曲面模型,确定土方工程中的零线方法通过实测提取原始地形DEM数据;依据空间直线方程,推导空间线段土任意点的坐标与方向余弦的数学关系式,采用Fortran90程序设计语言编写DEM数据提取程序,自动提取场平设计地形DEM数据;应用Surfers8.0和MapInfo软件构造规则的网格空间曲面模型并导出网格节,点数据;擦除场平设计范围外数据。

Optimization design is often used in the design of MRI superconducting main magnet, where all variables are treated as continuous ones. According to the fact that not all variables are continuous, here the design problem is seen as a global optimization problem with discrete variables.

软件简介:在进行MRI超导主磁体的设计时常采用优化设计的方法,将各设计参数看作连续变量处理,但实际上很多参数是离散变量,为了更符合工程实际,将超导MRI 主磁体的设计作为一个含有离散变量的全局优化问题。

Its benefit is that different structural sizes can be controlled by single design variable, such as the thickness of plate element and the area of bar element can be controlled by single dimensionless design variable.

采用无量纲设计变量为了适合工程实际的设计变量连接,利用无量纲设计变量,其好处是可以跨单元、跨截面的用同一个设计变量控制不同类型的结构尺寸(如板单元的厚度、杆单元的截面面积等)。

On the basis of the research on the characteristics of demand and the rules of behavior, the paper has put forward the principles and aims of the design of extraventricular enviroment,and has explored optimized ways of design of outdoor space, greenbelt,facilities of the ground etc.

本文还结合工程实践和大量实例研究了户外空间组织、绿地规划设计、场地设施及小品的规划设计等方面的优化设计途径,提出了室外环境设计的方法。

The type of fixture, rack, basket inverted plastic package (sand blasting, spray iron cage fluoride), PCB plating Pylon acid coating, semiconductor exhaust pipe coating acid 3, a variety of stainless steel Flashboard frame, Hanging Basket, Trolley, kite board aircraft design and manufacture of chemicals 4 specifications, all kinds of metal structure (stainless steel, titanium, copper) standard design and manufacture non-standard processing 5, all kinds of specifications for titanium screws Titanium basket, zirconium baskets, Titanium 6 BAG manufacturing, professional free stainless steel electrolytic plate 7, all kinds of precision casting SUS316L, patent research and development to open mode 8, Chun-yang article, tin ingot priced at direct 9, PCB plating equipment design and manufacture of whole plant output of 10, wastewater treatment equipment installation exhaust engineering, repair, maintenance

进口国外优质达标柴油。1、线路板电镀软板、硬板专用夹具、挂具专业设计制研发。2、各型式夹具、挂具、挂篮翻包胶、PCB电镀挂架耐酸碱涂装、半导体排风管耐酸碱涂装3、各种不锈钢插板架、挂篮、手推车、放板架规格品设计制造4、各种金属结构标准品非标准品加工设计制造5、各种规格钛螺丝钛篮、锆篮、钛袋加工制造6、专业免费提供不锈钢电解板7、各种SUS316L精密铸造、专利研发开模8、纯阳条、锡锭厂价直销9、PCB电镀设备整厂设计制造输出10、废水废气处理设备安装工程、维修、保养

Accord-ing to engineering example,the load condition of pulling resistance pile design,pile capacity design of floatage resistance pile,pile body texture design of floatage resistance pile,monolithic stability of grouped piles foundation,floatage resistance per unit area,c...

依据工程实例对抗拔桩设计荷载条件、抗浮桩单桩承载力设计、抗浮桩桩身结构设计、群桩地基整体稳定性、单位面积抗浮力、抗拔桩抗裂分别进行了阐述,以及抗拔桩设计中应考虑的问题进行了论述。

The technical problems, about shortage of separation distance, the feasibility of high-rise polymerization factory building, the fire separation and explosion-proof design of polymerization factory building, the selecting and arrangement of water spraying extinguishing system nozzle, the establishment of deluge system valve, and the essentiality of water spraying extinguishing system which is to be established to protect the VCM gasholder, the positioning of water curtain settled under the space which connect the PVC pack house and pack department and how long the system continue operate? The selecting and the quantity of fire extinguishing agent about gas extinguishing system, which will be used in the new 35KV switch station and some rooms including cabinet room, primary control room, UPS room, voltage changer room, belong to new polymerization power panel and UPS station. Designing the model of power supply and distribution for fire-fighting and designing the hardware organization, software, model of data transmission and fire gang control logic programmer about automatic fire alarm system. Making certain the grade of release source point in the fire or explosive atmosphere and delimiting different grade explosion-proof space. Selecting correct explosion-proof construction of electrical apparatus and delimiting the class of building lightning protection, putting forth the concert steps to deal with thunder stroke and electrostatic discharge and so on, have been deeply researched in the process of designing and then the concert steps to deal with them have been putted forth.

针对设计中遇到的防火间距不足、聚合厂房可否采用高层厂房、聚合厂房的防火分隔和防爆设计、水喷雾灭火系统的喷头选型和布置、雨淋阀组设置、VCM气柜是否需要设置水喷雾灭火系统、PVC仓库与包装车间相通处水幕带的布置和系统工作时间的确定、新建35kV开关站和聚合配电及DCS机柜间内的机柜间、主控室、UPS间、变压器室等处设置的气体灭火系统选型和灭火剂用量确定、消防供配电方式、火灾自动报警系统的硬件结构、软件设计、数据传输方式及联动控制设计中的逻辑编程、爆炸和火灾危险环境危险释放源等级确定和防爆区域等级范围的划分、爆炸危险区域电气设备的防爆结构选型、建、构筑物的防雷类别划分及采取的防雷、防静电措施等具体工程技术问题在深入分析研究后,提出了相应的解决措施。

Based on theoretical way and test, a method of heat capacity design is developed.

文中以某综合传动装置为工程背景,在机械设计学原理指导下,通过理论分析与试验研究,形成一套系统完整的摩擦元件热容量设计方法,并提供可以信赖的设计数据,指导摩擦元件热容量设计。

In 1997, YINGDAK took the first to launch "Famous Engineering" in costume industry. She became the first case to invite well-known designer Wu Xuewei with high salary in China Leather Industry. YINGDAK's designs enclose Furs fashionable and make fur into fabric design, which break through the limitable in Furs design. Her leather garment designs adopt international fashion structure and style, which has not only Fashion fabric of feature but also leather strongpoint. YINGDAK acquired splendid feedback between market and reputation. The key point of her leading position is internationalization and fashion.

1997年,应大在业内率先启动"名师工程",聘请著名设计师武学伟加盟,成为中国皮装行业高薪聘请著名设计师的第一例;应大的设计围绕皮衣时装化,将皮料当做面料设计,突破了皮装在设计上的局限性,将国际服装流行的结构、款型运用到皮装设计上,既有时装面料的特色也有皮料的优点,无论在市场上还是口碑上,都得到了极好的反馈,国际化、时装化是应大领导皮衣市场的终极手段。

第80/100页 首页 < ... 76 77 78 79 80 81 82 83 84 ... > 尾页
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。