工程计划
- 与 工程计划 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In order to remove this stigma and restore to the unemployed some measure of respectability and human dignity, a plan was devised to create governmentally sponsored work projects that private industry would not or could not provide.
为了消除这种被救济的"耻辱",在一定程度上恢复失业人员的名望和尊严,一项由政府资助设立工程项目的计划应运而生,这些工程项目是私人企业不愿或者不能提供的。
-
In perhaps the most ambitious project of all,Motorola plans to launch a wireless system called Iridium
在这个堪称最浩大艰巨的工程中,摩托罗拉公司计划开展一个名为"铱计划"的无线通信系统
-
The piggery is planned to construct in three phases, total investment of RMB25million. Phase one has invested RMB8million.
该猪场计划三期工程,总投资2500万元,第一期工程已投资800万元。
-
This design basis construction diagram paper,the geology draws up after explore the report and the local hydrology geology,the weather condition investigate on the spot, mainly include engineering general situation,construction to prepare,construction deployment,start construction project,the point crux control,start construction progress plan and promise measure and start construction the plane chart decoration and face to establish several aspect contentses, such as the decoration,the item risk control,the item information control and the item cost control...etc., body now construction the item management program of aim at a main characteristics of sex,implement,operability...etc..
本设计依据施工图纸、地质勘探报告及当地水文地质、气象条件并实地考察后编制,主要包括工程概况、施工准备、施工部署、施工方案、重点难点控制、施工平面图布置和临设布置、施工进度计划及保证措施、质量保证措施、工程安全防护及文明施工保证措施、项目风险控制、项目信息控制、项目成本控制等几方面内容,体现了施工项目管理规划的针对性、实施性、操作性等主要特点。
-
With this requirement, The paper brings forward the Visual Time Controlling System for the project of railroading which be able to visually express process of the constructed item of road, bridge, railway, station and so on. The system can make with vivid show and progress statistic to adjust progress and amend plan comparing with the Real-time construction circs.
形象化工程进度控制系统就是在这种需求下提出的进度控制系统,能够形象化地表示出铁路建设工程中路、桥、轨道、车站等施工对象的施工进度,做出清晰的表示及进度统计,便于针对实时的施工情况,调整进度、修改计划。
-
Noted by www.SSEweb.net 】 Yon CHUNG (1964-), Male; Member, Experts Group on Social System Engineering; Chief Expert on Social System Engineering, Realizer Beijing Institute of Social System Engineering; Research Fellow, Research Center of Intellectual Property, China University of Politics and Law; Attorney at law, Attorney at law, Realizer Beijing Law Firm; Director, The International Research Project on "Systems Thinking of Chinese Leadership"; Former Director, Center of Legal System Engineering, Central Leadership Institute of Politics and Law, and Former Superintendent, Comprehensive Teaching Department of Social System Engineering School, China University of Politics and Law. He has been exploring the Legal System Engineering, Somatic Science, etc. under the support and instruction of H.S.TSIEN (the progenitor of Engineering Cybernetics and Chinese rocketry, missilery, spaceflight and System Engineering) from early 1980s.
常远(1964-),男,社会系统工程专家组成员,北京实现者社会系统工程研究院首席社会系统工程专家,中国政法大学知识产权研究中心研究员,北京实现者律师事务所律师,"中国领导层系统思维"国际研究计划(The International Research Project for Systems Thinking of Chinese Leadership)主持人。20世纪80年代初开始在钱学森(工程控制论奠基者,中国火箭、导弹、航天、系统工程之父)支持和指导下从事法治系统工程和人体科学等领域探索;曾任国家教育委员会北京教授讲学团法治系统工程研究所所长、中央政法管理干部学院法治系统工程中心主任、中国政法大学社会工程学院综合教学部负责人;1993被联合国区域间犯罪与司法研究院列入专家名册,1996年被授予"司法部优秀青年"称号。
-
The schedule shall allow approximately seven (7) days for the Engineer's review and additional time for resubmission of shop drawings and samples which may be unacceptable; however, the Contractor shall recognise that the time required for the Engineer's review may vary depending upon the quantity of materials submitted at any one time and the complexity of the shop drawing.
计划单应留有七(7)天时间用于工程监理审核,再留有多余的时间用于不合格施工图和样品的重新提交;但无论怎样,承包商应知道工程监理审核时间会根据承包商一次性提交材料的数量和施工图的复杂度的不同而不同。
-
Distribute order master schedule to Enginneering, Procurement, Production Planning and Assembly shopfloor.
发放订单主计划给工程设计,采购,生产计划和装配车间。
-
This paper establishes the schedule risk analysis model of network planning. Based on the simulation method, schedule estimate and statistical distribution of projects are given, then the risk distribution of total period is obtained.
网络计划的仿真就是在计算机上模仿工程系统实际执行中的运行状态,并对工程系统在整个运行期间内状态的动态变化进行观察和统计,使人们从仿真结果中了解系统的基本特性。
-
Sunward Intelligent hydraulic static pile driver was beat 2003 national scientific and technological progress second prize (year of construction machinery industry's highest award), the company has passed ISO9001 quality certification, ISO14001 environmental assurance system OHSAS18001 occupational health and safety guarantee system and the CE product certification; Companies in China Construction Machinery composite index ranking seventh for the country'863 'planned high-tech industry base, China's top 100 most competitive high-tech enterprises, and become a "Forbes" China's most development potential of 100 companies list.
山河智能液压静力压桩机获得2003年国家科技进步二等奖(当年工程机械行业最高奖项),公司已通过ISO9001质量认证、ISO14001环境保证体系OHSAS18001职业健康安全保证体系和产品CE的认证;公司在中国工程机械综合指数排名第七,为国家'863'高科技计划产业化基地、中国最具竞争力高新技术100强企业,并成为《福布斯》中国最具发展潜力100榜企业。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力