Certainly advanced components are integrant, our engineers constantly research acoustic technology and innovation to provide reasonable price and high quality for our clients.

当然先进的部件都是整体,我们的工程师们在不断的研究声学技术和创新,以提供合理的价格和高品质,为我们的客户。

Mobile Software System Integrator is responsible for mobile phone software system integration.

软件集成工程师负责软件的系统集成和综合性问题的分析解决工作。

We used to have a team of five or six people building the interconnect.

过去,我们建立互连的工程师团队只有五,六人。

B the amount certified in each Interim Payment Certificate within 56 days after the Engineer receives the Statement and supporting document s; and

期中支付证书中开具的款额,时间是在工程师收到报表及证明文件之日起56天内;以及

B the amount certified in each Interim Payment Certificate within 56 days after the Engineer receives the Statement and supporting documents; and

期中支付证书中开具的款额,时间是在工程师收到报表及证明文件之日起56天内;以及

Iii "Interim Payment Certificate" means any certificate of payment issued by the Engineer other than the Final Payment Certificate.

期中付款证书,指由工程师签发的除最终付款证书之外的所有付款证书。

4 The Engineer may be any interim certificate make any correction or modification in any previous certificate which shall have been issued by him and shall have authority, if any work is not being carried out to his satisfaction, to omit or reduce the value of such work in any interim certificate.

92.7 在提交最终报表时,承包商应给雇主一份书面结算清单,进一步证实最终报表中的总额,相当于由合同引起的或与合同有关的全部和最后确定应支付给承包商的所有金额,并将一份副本呈交工程师

The Engineer shall, within 28 days after receiving a Statement and supporting documents, issue to the Employer an Interim Payment Certificate which shall state the amount which the Engineer fairly determines to be due, with supporting particulars.

此后,在收到承包商的报表和证明文件后28天内,工程师应向雇主签发期中支付证书,列出他认为应支付承包商的金额,并提交详细证明资料。

Prior to issuing the Taking-Over Certificate for the Works, the Engineer shall not be bound to issue an Interim Payment Certificate in an amount which would be less than the minimum amount of Interim Payment Certificates

但是,在颁发工程的接收证书之前,若被开具证书的净金额(在扣除保留金及其他应扣款额之后)少于投标函附录中规定的期中支付证书的最低限额,则工程师没有义务为任何付款开具支付证书。

Thereafter, the Engineer shall, within 28 days after receiving a Statement and supporting document s, issue to the Employer an Interim Payment Certificate which shall state the amount which the Engineer fairly determines to be due, with supporting particulars.

此后,在收到承包商的报表和证明文件后28天内,工程师应向雇主签发期中支付证书,列出他认为应支付承包商的金额,并提交详细证明资料。

第80/100页 首页 < ... 76 77 78 79 80 81 82 83 84 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。