工程安装
- 与 工程安装 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Conduit of water supply, catchment installs standard of acceptance of work: Quality of conduit, pipe fitting should accord with active standard; Valve is installed should decorous, switch Ying Ling is vivid; Press via connecting water to try, all conduit, valve, connect should not have ooze water, slack phenomenon.
给水、排水管道安装工程验收标准:管道、管件质量应符合现行标准;阀门安装应端正,开关应灵活;经通水试压,所有管道、阀门、接头应无渗水、漏水现象。
-
Works to be doors and windows and fixed glass window frame next step after installation is carried out by the installation of casement.
待门窗工程的窗框及固定玻璃安装完毕后下一步所进行的便是窗扉的安装。
-
In contrast to nLite works on the installedsystem, so that excess reinstallation isnot required; however, the possibility of program are modest, minus is also sufficiently high cost, near 40$.
在对比nlite工程对安装的系统,使过剩的重新安装并不需要;然而,计划的可能性是温和的,减亦是相当高的成本,近40元。
-
The product nearly can be applied to all fire occasions. For vertical turbine fire pump, it's suction immerges into water, the maximal suction height is 30m, it start up rapidly and run reliably. Especially it is suitable for engineering places that water level is below pump installation foundation such as docks, ocean platform, and so on.
立式长轴式消防泵采用独特的立式长轴结构,泵吸入口淹没于水中,泵安装面距液位高度最大可达30m,由于不存在引水问题使得可靠性大大提高,尤其适用于码头、海洋平台等消防水液位低于泵安装面的工程场所。
-
In addition, the matters needing attention in prestress stretching are presented in order to ensure construction quality of concrete hollow plate beam .
结合具体的工程概况,对模板的制作与安装、预应力波纹管安装、穿束方法、浇筑混凝土等关键工序的质量控制要点作了阐述,并提出预应力张拉的注意事项,从而确保混凝土空心板梁的质量。
-
Electric stainless steel diaphragm,uhb-zk wearable pump sand decay,fzb fluoroplastics self-priming pump,fsb fluorine plastic alloy centrifugal pump,gc boiler feed pump,ihf衬氟centrifugal pump,fb,afb corrosion-resistant chemical pumps,ih chemical centrifugal pump,screw pump coal slurry,ihg chemical pipeline pump,is clean water pump,electric diaphragm pumps vertical,衬氟pneumatic diaphragm pumps,stainless steel pneumatic diaphragm pumps,pneumatic diaphragm pumps of cast iron,aluminum alloy pneumatic diaphragm pumps,pneumatic diaphragm pump engineering,gw pump sewage pipes,lw vertical sewage pump,zwl direct-coupled self-priming sewage pump,isg vertical pipeline pump,isw horizontal pipeline centrifugal pump,cqb magnetic heavy-duty stainless steel pumps,cqb - g stainless steel high temperature magnetic pump,g-type screw pump | single screw pump | pump concentration,jmz,fmz wine self-priming pump self-priming chemical pump,zx water self-priming pump,iswh,iswhd horizontal stainless steel pipeline pump chemical,qj deep well pump,kcb,2cy gear pumps,pbg shielding pipeline pump,cdlf stamping stainless steel multi-stage centrifugal pump,lg,lg-b high-level multi-stage centrifugal water supply,s,sh in the open double suction centrifugal pump,dl,dlr vertical multi-stage centrifugal pump,iswr,iswrd horizontal pump hot water pipes,gdl pipeline multi-stage pumps,electric diaphragm pumps衬氟,tear-style diving sewage pump,sewage pump automatically mix,zw self-priming sewage pump without blockage,wq-type sewage submersible pump-free plug,fpz,pvz corrosion-resistant self-priming pump.
模块式安装,便于增添设备:热泵热水器产品采用多台常压燃煤锅炉并联的安装模式,当用户用水量锅炉时,可随时增添设备。不锈钢燃气隔膜泵,uhb-zk锅炉boiler耐腐沙浆泵,采暖电锅炉氟塑料自吸泵,fsb氟塑料合金常州市锅炉厂,燃气锅炉给水泵,ihf衬氟离心泵,fb、afb耐腐蚀化工泵,ih化工离心泵,水煤浆螺杆泵,ihg采暖电锅炉管道泵,is清水离心泵,立式电动隔膜泵,衬氟气动隔膜泵,不锈钢气动隔膜泵,铸铁气动隔膜泵,铝合金气动隔膜泵,工程塑料常压燃煤锅炉隔膜泵,gw管道排污泵,lw立式排污泵,哈尔滨锅炉供暖公司直联式自吸排污泵,锅炉蒸汽参数立式管道泵,isw卧式管道离心泵,cqb重型不锈钢磁力泵,cqb-g高温不锈钢磁力泵,g型螺杆泵|单螺杆泵|浓浆泵,jmz、fmz自吸酒泵自吸化工泵,zx清水自吸泵,iswh、iswhd卧式不锈钢化工管道泵,qj深井泵,kcb、2cy齿轮油泵,pbg屏蔽管道泵,cdlf不锈钢多级冲压离心泵,lg、lg-b高层给水多级离心泵,s、sh中开式双吸离心泵,dl、dlr立式多级离心泵,iswr、iswrd卧式热水管道泵,gdl多级管道泵,衬氟电动隔膜泵,撕裂式潜水排污泵,自动搅匀排污泵,zw自吸无堵塞排污泵,wq型潜水式无堵塞排污泵,fpz、pvz耐腐蚀自吸泵。
-
Companies run: States imported electrical appliances, the brand of electrical distribution box distribution board designed and installed to undertake the production of various types of electrical installation works.
公司兼营:各国进口电器,各品牌电器配电箱配电盘设计安装制作承接各类电器安装工程。
-
Companies contract a lot of high-altitude anti-corrosion, high-altitude maintenance, insulation, dismantling, external painting, cleaning, installation, decoration, new chimneys, concrete sliding, cable rectification, drainage, laying, listing bridge installation, fire closures Plugging, concrete drilling, chemical anchor, planting-bar, chemical grouting with water, water under pressure plugging, brush beacon, for lightning rod, wear-resistant floors and other projects.
公司承揽了大量的高空防腐、高空维修、保温、拆除、外墙涂装、清洗、安装、装璜、烟囱新建、砼滑模,电缆整治、抽放、敷设、挂牌、桥架安装、防火封堵,砼钻孔、化学锚固、植筋,带水化学注浆,防水带压堵漏、刷航标、换避雷针、耐磨地坪等工程。
-
Each kind of construction machinery has excellent facilities, can contract the general industry independently and public, the civil items of basic construction equipment, the line, pipeline's installment, 35 kilovolts and below change the power distribution station projects, non-standard steel structure manufacture, installment.
各类施工机械设备齐全,能独立承揽一般工业和公共、民用建设项目的设备、线路、管道的安装,35千伏及以下变配电站工程,非标准钢结构的制作、安装。
-
It is understood that the country wooden furniture and wood-based panel Quality Center is located at Pizhou City Economic Development Zone, by Pizhou city government to invest some 124 million yuan to build, covers an area of 84.6 mu, total construction area of the main 20,000 square meters, since early in March 2007 laid the foundation stone to start the construction has been completed the main engineering building, currently under way to install curtain walls, internal and external decoration, the construction of ancillary facilities and greening, lighting and other projects, has been ordered by the total value of 17,800,000 yuan equipment abroad advanced equipment ordered all arrive in Singapore, Shanghai, Nanjing and other ports, in the domestic order of the instruments and equipment manufacturers have all been completed and arrived at the designated locations by the end of March until the Center can be installed after delivery, commissioning, trial operation input .
据了解,国家木制家具及人造板质量中心位于邳州市经济开发区由邳州市政府投资约1.24亿元兴建,占地84.6亩,总建筑面积面积主要二点零零零万平方米自2007年3月月初奠基开工建设,已完成主体工程建设,目前正在安装玻璃幕墙,内部和外部装饰,配套设施及绿化,灯光和建筑其他项目中,已经由一七八〇〇〇〇〇元订购设备的总价值国外先进设备下令所有抵达新加坡,上海,南京等港口的仪器和设备制造商国内秩序,已全部完成,并在指定地点到达在3月底之前,中心还可以交付后安装,调试,投入试运行。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。