英语人>网络例句>工程列车 相关的搜索结果
网络例句

工程列车

与 工程列车 相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper describes the transformation of different coordinate systems by the rotation of coordinate axis combined with the model railway of Shanghai city magnetic suspension train.

结合上海市磁悬浮快速列车示范运营线工程的实际,通过坐标轴的旋转论述不同坐标系间的转换问题。

Based on the item of national high technology development project, the thesis studies the reasonable construction pattern of the tunnel portal, incidence of the micro-pressure wave and the the effect of bell-mouthed hood, lacunaris hood and expansile hood on alleviating the micro-pressure wave in the situations of single line and double line, obtains the relationship between the max micro-pressure wave and the velocity of the train as well as the relationship between the max micro-pressure wave and distance of measuring point at the velocity of 100km/h-550km/h, compares the different alleviative effect of the three different hood to max micro-pressure wave and finally proposes the reasonable construction pattern of the tunnel portal.

本文针对国家高技术研究发展计划(863计划)课题"磁浮交通沪杭线越黄浦江隧道的工程技术问题研究",在单洞单线和单洞双线两种工况下,对隧道洞口的合理结构形式和影响范围,以及洞口喇叭形入口缓冲段、多孔壁入口缓冲段以及隧道出口膨胀室对减缓微压波的作用进行了研究,得到了磁浮列车速度在100km/h~550km/h时隧道出口微压波最大值与速度的关系以及微压波最大值与测点距离的关系,比较了三种不同形式缓冲结构对微压波最大值的减缓效果,提出了隧道洞口的合理结构形式。

It introduces the developing actuality and researching background of magnetic aerotrain pier temperature changes,elaborates the problems existed in the project and the needs of track structure,material and accuracy,and brings forward a temperature grads mode which suits the track pier of magnetic aerotrain,so as to make economic,accurate guidance and reference for project design.

介绍了磁悬浮轨道梁结构温度变形的发展现状与研究前景,对轨道梁的结构、材料、精度要求以及工程中出现的问题做了全面的阐述,并提出了一种适合磁悬浮列车轨道梁的温度梯度模式,以便及时地为工程设计提供经济、准确的依据和指导。

This thesis describes the principle of TETRA and the application of digital TETRA in metro dispatcher system.

论文从TETRA的原理出发,结合实际工程运用,深入研究了数字集群TETRA在地铁列车调度系统的实际应用。

It indicates that our study on magnetic suspension train has entered advanced cavalcade.In this paper, combining the actual circumstances of precise engineering survey of magnetic suspension train project in Shanghai, the setting and observation of construction network in each course are introduced. The making of tramroad girder is introduced, and the control survey technology of precise regulating is also analyzed in detail.

本文结合上海市磁悬浮快速列车工程精密工程测量的实际情况,介绍了上海磁悬浮工程基础施工控制网的布设、观测,以及各施工放样阶段控制网的布设、观测及精度要求分析,并对轨道梁的制作和轨道梁的精调测量控制技术作了较为细致的分析介绍,最后讨论了磁悬浮工程变形监测的方法。

Incidentally, I never found out how exactly we managed to get seats on a fully booked train but my host did mention that the wife of a comedian whose show was being played on TV in our carriage works at the train company and the comedian himself regularly eats in his restaurants!

顺便说一句,我从来没有发现,到底如何,我们设法获得席位就订满了火车,但我的主机曾提到,妻子一个喜剧演员,其显示正在播放的电视在我国运载工程列车公司与喜剧演员自己经常吃在他的餐厅!

In order to allow track maintenance personnel to determine impacts of track irregularities on traffic safety and to execute maintenance on dangerous sections, This study provides an analysis method with the application of ADAMS/Rail, modified train model suitable for track with a track gauge of 1067mm, and model track made to parameters actually taken from a section of measured irregularities of Taiwan Railway Administration.

为便於轨道养护工程人员研判轨道不整对行车安全的影响,对危险地段进行维修工程,本研究提供一套分析方法即利用套装软体ADAMS/Rail及修改适合1067公厘轨距轨道之列车模型,并以实测台铁某段轨道不整值为轨道模型,利用软体内建轮-轨互制行为进行列车动态分析,藉以了解轨道系统各部份的力学行为,尤其针对运输问题中最重要的安全性问题进行分析。

Newest arrival of shipment legal copy Hong Kong NewRay brand alloy vehicle mold: P42DC American AMTRAK the railroad company P42DC skeleton line train model, the famous American AMTRAK nation railroad company has in the world quantity most railway engines and the compartment, each time AMTRAK railway engine all is the American economy development transportation person who has rendered meritorious service, the rough iron-covered front of a train and Europe's electric train fine forms clearly the opposite contrast, is object which the world train amateur pursues vigorously holds. 1 to 87 proportions, the zinc base alloy +ABS engineering plastics material quality, the ultra fine paint surface works, independent power front of a train +2 compartments, may assemble at will, the unique fluctuation type from the charge system, uses 4 ordinary 5th battery then, charges a minute then to let the train run quickly 3 minutes on the track, the ultra long ultra multi- varieties from assemble the track, but freely assembles the track shape which any you likes, track most large diameter may achieve 127.5 centimeters, in have 8 straight axles, 10 curves axles, And has the cross overlapping track, may transform the direction respectively toward to change a track 2 and the charge platform station and so on the special track east, absolutely is you is unable to put down ultra is very fond of east, is presents the present certainly good to choose!

最新到货的正版香港NewRay品牌合金车模: P42DC 美国AMTRAK铁路公司P42DC型干线列车模型,著名的美国AMTRAK全国铁路公司拥有世界上数量最多的火车头和车厢,每个时代的AMTRAK的火车头都是美国经济发展的运输功臣,粗犷的铁皮车头与欧洲的电气列车的精致形成截然相反的对比,是全世界火车爱好者极力追捧的对象。1比87比例,锌合金+ABS工程塑料材质,超精致的漆面做工,一个独立动力车头+2节车厢,可随意拼装,独特的升降式自充电系统,使用4节普通的5号电池即可,充电一分钟即可让火车在轨道上奔驰3分钟,超长超多品种的自组装轨道,可自由组装任何你喜欢的轨道形状,轨道的最大直径可达到127.5厘米,内有8根直轨,10根弯道轨,并配有十字交叉轨道、可变换方向的分向变道轨道2根和充电月台基站等特殊轨道,绝对是你爱不释手的超酷好东东,更是馈送礼品的绝佳选择!

Newest arrival of shipment legal copy Hong Kong NewRay brand alloy vehicle mold: F7 American AMTRAK the railroad company F7 skeleton line train model, the famous American AMTRAK nation railroad company has in the world quantity most railway engines and the compartment, each time AMTRAK railway engine all is the American economy development transportation person who has rendered meritorious service, the rough iron-covered front of a train and Europe's electric train fine forms clearly the opposite contrast, is object which the world train amateur pursues vigorously holds. 1 to 87 proportions, the zinc base alloy +ABS engineering plastics material quality, the ultra fine paint surface works, independent power front of a train + three compartments, may assemble at will, the unique fluctuation type from the charge system, uses 4 ordinary 5th battery then, charges a minute then to let the train run quickly 3 minutes on the track, the ultra long ultra multi- varieties from assemble the track, but freely assembles the track shape which any you likes, track most large diameter may achieve 127.5 centimeters, in have 8 straight axles, 10 curves axles, And has the cross overlapping track, may transform the direction respectively toward to change a track 2 and the charge platform station and so on the special track east, absolutely is you is unable to put down ultra is very fond of east, is presents the present certainly good to choose!

最新到货的正版香港NewRay品牌合金车模: F7 美国AMTRAK铁路公司F7型干线列车模型,著名的美国AMTRAK全国铁路公司拥有世界上数量最多的火车头和车厢,每个时代的AMTRAK的火车头都是美国经济发展的运输功臣,粗犷的铁皮车头与欧洲的电气列车的精致形成截然相反的对比,是全世界火车爱好者极力追捧的对象。1比87比例,锌合金+ABS工程塑料材质,超精致的漆面做工,一个独立动力车头+三节车厢,可随意拼装,独特的升降式自充电系统,使用4节普通的5号电池即可,充电一分钟即可让火车在轨道上奔驰3分钟,超长超多品种的自组装轨道,可自由组装任何你喜欢的轨道形状,轨道的最大直径可达到127.5厘米,内有8根直轨,10根弯道轨,并配有十字交叉轨道、可变换方向的分向变道轨道2根和充电月台基站等特殊轨道,绝对是你爱不释手的超酷好东东,更是馈送礼品的绝佳选择!

Newest arrival of shipment legal copy Hong Kong NewRay brand alloy vehicle mold: F59PHI American AMTRAK the railroad company F59PHI skeleton line train model, the famous American AMTRAK nation railroad company has in the world quantity most railway engines and the compartment, each time AMTRAK railway engine all is the American economy development transportation person who has rendered meritorious service, the rough iron-covered front of a train and Europe's electric train fine forms clearly the opposite contrast, is object which the world train amateur pursues vigorously holds. 1 to 87 proportions, the zinc base alloy +ABS engineering plastics material quality, the ultra fine paint surface works, independent power front of a train +2 compartments, may assemble at will, the unique fluctuation type from the charge system, uses 4 ordinary 5th battery then, charges a minute then to let the train run quickly 3 minutes on the track, the ultra long ultra multi- varieties from assemble the track, but freely assembles the track shape which any you likes, track most large diameter may achieve 127.5 centimeters, in have 8 straight axles, 10 curves axles, And has the cross overlapping track, may transform the direction respectively toward to change a track 2 and the charge platform station and so on the special track east, absolutely is you is unable to put down ultra is very fond of east, is presents the present certainly good to choose !

最新到货的正版香港NewRay品牌合金车模: F59PHI 美国AMTRAK铁路公司F59PHI型干线列车模型,著名的美国AMTRAK全国铁路公司拥有世界上数量最多的火车头和车厢,每个时代的AMTRAK的火车头都是美国经济发展的运输功臣,粗犷的铁皮车头与欧洲的电气列车的精致形成截然相反的对比,是全世界火车爱好者极力追捧的对象。1比87比例,锌合金+ABS工程塑料材质,超精致的漆面做工,一个独立动力车头+2节车厢,可随意拼装,独特的升降式自充电系统,使用4节普通的5号电池即可,充电一分钟即可让火车在轨道上奔驰3分钟,超长超多品种的自组装轨道,可自由组装任何你喜欢的轨道形状,轨道的最大直径可达到127.5厘米,内有8根直轨,10根弯道轨,并配有十字交叉轨道、可变换方向的分向变道轨道2根和充电月台基站等特殊轨道,绝对是你爱不释手的超酷好东东,更是馈送礼品的绝佳选择!

第1/2页 1 2 > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。