工程
- 与 工程 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Fu Xi Road ditch is tension cable construction; new road is part of earthworks construction project in South China City emergency water projects have been completed.
富安西路电缆沟正在紧张施工;新建路土方工程部分正在建设;华南城项目应急用水工程已完成。
-
Yunjin Road Cable Tunnel crosses underneath the newlybuilt Yunjin Road. The buildings and utility lines near the cable tunnel increase the construction risks.
南京云锦路电缆隧道工程下穿新建成的云锦路,邻近有诸多楼房、管线,不可避免地存在许多工程建设风险。
-
ABSTRACT Engineering drawing system is one of the most important parts of engineering CAD.
工程图系统是工程CAD软件最重要的组成部分之一。
-
According to the current situation of the human resource of CADI, the characteristics of engineers working in the CADI and the characteristics of the aircraft design, the distribution schemes focusing on job positions and performance are given, of which a linear programming model is built to resolve the performance compensation at the aim of max-motivation in order to form a suitable model of compensation management and to achieve "double-win" between the employee and the employer.
针对611所人力资源状况、工程技术人员特点及飞机设计专业工程工作特点,提出以岗位为核心的岗位薪点设计方案和以个人业绩为核心的绩效分配设计方案,建立了以激励强度最大化为目标的线性规划数模,用单纯形法求解绩效奖酬,以形成一种激励强度大、内部公平合理、对外具有竞争力的薪酬管理模式,即实现员工与组织在此问题上的双飞旨。,,月叽
-
Sinking of open caisson is the key procedure during construction, success of which will put great positive influence on the execution of the entire project.
沉井下沉是沉井施工的一个关键工序,也是一项工程成败的关键,因此做好沉井下沉是一项工程的重中之重。
-
Combined with the experiences of large overseas railway project,it analyses the unit price of labour,material,equipment and machine-shift from the composition and calculating method of unit price ,so as to accumulate experience for overseas railway project budget,and offer a reference for readers.
结合从事多条涉外大型铁路项目的实践经验,从单价的组成和确定方法两方面对涉外铁路工程项目中人工、材料、设备和机械台班单价进行了分析,以积累涉外铁路工程项目概预算编制的经验,可供同行参考借鉴。
-
The comprehensive treatment project of Tong Ken landslide consists of whittling slope、anti-landslide pile with anchoring cable、retaining wall、building ground drainages leveling off and calking slope、vegetation protection etc. After managing, under the action of earthquake load and watery the stability coefficient of landslide is up to 1.10.Then, this text researches the structural optimization design of anti-slide pile with anchoring cable. On the condition that the width of section is invariable, the height of section is confirmed by structural optimization method. This will change traditional method to optimize the height of section so that design is simplified and cost is lower.
最终选用的的综合治理方案是由削方、锚索抗滑桩、护坡挡墙、地表排水、整坡填缝、生物防护等多种工程措施优化组合而成,治理后,在饱水有地震荷载状态下滑坡的安全系数可达1.10论文重点是主要对锚索抗滑桩的桩身结构优化设计进行了研究,在给定抗滑桩截面宽度的条件下,运用结构优化的方法来确定抗滑桩截面高度,改变传统迭代计算方法确定桩截面尺寸,使抗滑桩截面高度取最优值,达到简(来源:ABC4a论文8d网www.abclunwen.com)化设计和降低工程造价之目的。
-
In recent years,masenchymal stem cells have been applied in cartilage tissue engineering and they have shown significant potenital for carriage repair in animal models,and are being used as an ideal cell source in cartilage tissue engineering.
:间充质干细胞具有高度自我新能力,能够分化各类型的细胞近20年间充质细胞在软骨组织工程中得到应用,动物实验显示了良好的软骨修复潜能,成为软骨组织工程的理想的细胞来源。
-
The engineering design and parameters of CASS process in treatment of pharmaceutical wastewater were introduced.
介绍了CASS工艺处理制药废水的工程设计以及工艺参数,并结合工程的运行调试工作提出了具体的运行参数。
-
The CBU Master's Degree Programme in Forestry and Environmental Engineering is based on bilateral and international collaboration in the fields of fores...
该货柜后勤用地的硕士学位课程在林业和环境工程是根据双边和国际合作领域中的森林科学和环境工程旨在促进生态和社会可持续地利用自然资源。
- 推荐网络例句
-
In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.
。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。
-
Go down on one's knees;kneel down
屈膝跪下。。。下跪祈祷
-
Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.
Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。