英语人>网络例句>工程 相关的搜索结果
网络例句

工程

与 工程 相关的网络例句 [注:此内容来源于网络,仅供参考]

The paper took the feasible study on the roadway connection engineering of the circular road in Huhhot as an example and gave the projet designs of the road principal engineering, the rain water, the sewage, the electricity, the telecommunication, the thermodynamics, the gas, the lighting engineering and the road accessorial engineering, t...

本文以呼和浩特市绕城路道路连接线工程可行性研究为例,通过对呼和浩特市经济现状水平的准确分析和将来发展的预测、对项目影响区交通系统和道路网的现状及发展规划的调查研究、对雨水和污水管网等相关市政管线的现状及发展规划的调查分析,结合当地条件,给出了道路主体工程的方案设计以及雨水、污水、热力、燃气工程的方案设计。

The quality of a construction project directly determines the success of the project. The excellence of a building quality is not only the pulchritude of a country's construction, but also the guarantee of building industry sustains development.

建筑工程质量的好坏直接决定了建筑工程施工项目的成功与否,优良的工程质量不仅是国家建设顺利进行的标志,也是建筑企业持续发展的重要保证。

The test and research on anti-floating anchor s are carried out based on the pump room engineering.

针对某泵房工程,对工程抗浮锚杆进行试验研究,通过锚杆的破坏性试验,得出抗浮锚杆的抗拔力,为抗浮工程的设计提供了依据。

In our country, the development of the railroading project has been deeply restrained by the low management level and the obvious phenomenon of the schedule that out of control.

我国目前铁路工程建设管理水平不高,铁路工程施工进度失控现象明显,严重滞后了我国铁路工程建设的发展。

Because of lack of abstraction at the stage of requirement analysis, the traditional Management Information systems of Engineering Designing Project are not suitable to dynamic recomposition of business management process. This paper will combine Workflow Technologies with Management Workflow System of Engineering Designing Project. By decomposing work into good-definitioned tasks and roles and executing and monitoring them according to rules and processes, we can boost efficiency, reduce cost, enhance level of business management of engineering design department.

传统的工程设计项目管理信息系统在需求分析阶段缺乏高度的抽象性,使得最终的需求模型无法适应管理业务流程的动态重组,本文将结合正在研发的工程设计项目管理信息系统集成工作流技术,将业务处理工作分解成定义良好的任务和角色,并按照一定的规则和过程予以执行和监控,达到提高办事效率,降低生产成本,改善工程设计单位生产经营管理水平和竞争力的目标。

To finding out planning to build background and reason of the rock soil engineering specifications in the field, reconnoitre the rock soil projects of field and foundation, fully understand the project geological condition of building field and foundation, has combined testing, test testing and groundwater water analysis of normal position in the geotechnological sample room.

针对查明拟建场地岩土工程条件的背景和原因,进行场地与地基的岩土工程勘察,充分了解建筑场地与地基的工程地质条件,结合了土工试样室内试验、原位测试试验及地下水水质分析。

In combination of the cut slope engineering works of an express way the present paper puts forward the designing method to reinforce the slope with prestressed cables, which is useful referentially for similar slope engineering works.

结合某高速公路路堑岩质边坡工程,在分析边坡工程地质条件的基础上,提出了预应力锚索加固边坡的设计方法和步骤,为相关边坡工程的加固提供借鉴经验。

This paper sets forth regimentation principle,program and method of the pre-tender price in the building project item,and presents how to make pre-tender ,embodies the importance of project bidding bottom in bidding work.

从标底价格的编制原则、编制程序、编制方法等方面对建设工程项目招标标底的编制进行了阐述,并提出了如何编制工程标底,体现了工程标底在招投标工作中的重要性。

In this thesis, the methods of surrounding rock masses stability classification on the basis of the geological documentation of muck and the boring parameters of TBM are approached, especially as follows:①The geological documentation of muck and the boring parameters of TBM in the Yellow River Diversion Project.of shanxi province is summarized systematically;②Based on the geological documentation of muck and the boring parameters of TBM, that whether the common methods of surrounding rock masses stability (the methods of regular factor classification) classification are feasible, is carried on the discussion;③According to the corresponding relation of muck and the boring parameters of TBM and the surrounding rock masses stability type, the extension assessment method of tunnel surrounding rock masses stability classification is set up, also the corresponding fortran calculation procedure worked out, and not only rational result in conformity with the reality can be obtained, but also the stability situation of surrounding rock masses in front of the working range can be predicted according to the change of the dependent value in the application instance of Yellow River Diversion Project;④Combining with the application instance of Yellow River Diversion Project, extension assessment method in the application of surrounding rock masses stability classification is compared and verificated in detail by applying fuzzy synthesis method by forefathers, and a certain degree discussion and summary about the application achievement of surrounding rock masses stability classification, which is assessed by extension assessment method and fuzzy synthesis method, are carried on.

本文基于渣料和TBM掘进参数的地质编录提供的地质信息进行了围岩稳定分类方法的探讨,重点进行:①对引黄工程中渣料和TBM掘进参数的地质编录的系统整理;②基于渣料和TBM掘进参数的地质编录获得的地质信息,对常用围岩稳定分类方法是否能够进行围岩稳定分类进行了探讨;③根据渣料和TBM掘进参数与围岩稳定类型的对应关系,应用可拓理论,建立了隧洞围岩稳定分类的可拓评价方法,还编制了相应的fortran计算程序,并在引黄工程的应用实例中不仅取得了与客观实际相符的合理结果,而且根据其关联度值的变化能够预测临近掌子面前方围岩的稳定情况;④结合引黄工程的应用实例运用模糊综合评判方法对可拓评判方法在围岩稳定分类中的应用进行了详细的验证、比较,并对前人在运用可拓学和模糊数学进行岩体稳定评判的应用成果方面,进行了一定的探讨、总结。

All concerned for setting up a remedial and maintenance program should understand the performance requirements, time limit for the project, the cost, the maintenance, geology, construction conditions, environmental protection, building material, and the stability change of the slope with time and the reservoir filling, stability under different combination of loads.

治理工程措施选择应充分考虑治理工程功能性的具体要求、在不同工况条件下的安全性及耐久性、工期要求和投资的经济性以及后期维护的要求、工程岩土体性质及其蓄水后的变化、场地条件、施工技术条件、地方材料资源等具体制约因素以及环境保护的要求。

第36/100页 首页 < ... 32 33 34 35 36 37 38 39 40 ... > 尾页
推荐网络例句

Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.

最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。

Only person height weeds and the fierce looks stone idles were there.

只有半人深的荒草和龇牙咧嘴的神像。

This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.

这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。